Mike Alani, Project Site Superintendent

Mike Alani

Project Site Superintendent

IES Communications

Location
United States - Texas
Education
Bachelor's degree, English Studies
Experience
5 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :5 years, 9 Months

Project Site Superintendent at IES Communications
  • United States
  • May 2018 to January 2024

Conducted IES COMMERCIAL projects, build out crew lead, worked in building
the whole data room such as MPOEs, MDFs, and Data Hall Conducted, pulled
and dressed copper cables such as Coaxial, Cat5, Cat6 and tested them using
the Fluke tester Successfully completed 95% of the paperwork on time,
specifically timesheets, material transfers, work orders, change orders, tool
transfers and other projects as required Plan and set specification for Daily, and
weekly Perform quality checks; coordinate moves and cut sheets for voice and
data cross connects prepare red-lined as-built drawings Served as main on-site
customer contact for questions and/or concerns; traveled to different sites to
train and supervise new employees Performed work consistently and
demonstrated a detailed level of technical knowledge troubleshoot and resolve
technical issues as they arise,
Contracted to ATT as Network Support Engineer MIC integration for
Ericson&Nokia Nodes Work with Integration team Work with Audit Team Work
with Validation Team Work with Pre reconfiguration Team
Contracted to Spectrum in Dallas, TX as a Field Engineer Manage, and lead
crew of lead techs. Communicate with client to determine needs and explain
complex issues. Technical quality standards. Conduct research and studies on
site. Manage field activities. Installing, Testing, and maintaining equipment,
wireless systems. Maintain, troubleshoot, and repair deployed
telecommunications equipment.
Conducted IES COMMERCIAL projects and successfully completed 95% of the
paperwork on time, specifically timesheets, material transfers, work orders,
change orders, tool transfers and other projects as required OSP Planning
Perform quality checks; coordinate moves and cut sheets for voice and data
cross connects; prepare red-lined as-built drawings Served as main on-site
customer contact for questions and/or concerns; traveled to different sites to
train and supervise new employees Performed work consistently and
demonstrated a detailed level of technical knowledge; troubleshoot and resolve
technical issues as they arise Build out crew lead, worked in building the whole
data room such as MPOEs, MDFs, and Data Halls Conducted, pulled and
dressed copper cables such as Coaxial, Cat5, Cat6 and tested them using the
Fluke tester OSP Division : Pulling, Feeding and dressing Fiber Cable Maxcell
Troubleshooted, diagnosed, and repaired units while in the field Installed
Routers, Ariel drops, CATV, VOIP, TV channels, WIFI, Coaxial cables RG6, RG11,
RG 59 and Ethernet Cables Provided on-call emergency service as required and
maintain communication with the department manager while in the field
Educated customers on preventive maintenance and safety regulations, and
provide general customer service on the phone and in person
Setup and installation of mini communications towers (Mikrotek Point to Point)
Provided internet services 2.4 GHz - 5.8 GHz Setup and installed security
cameras and VOIP systems System monitoring and maintenance Wireless QC
Planning, building, and testing internet network (indoor and outdoor) Installing
and maintenance of computers (hardware and software

Education

Bachelor's degree, English Studies
  • at University Of Baghdad
  • May 2014

Specialties & Skills

Technical Project Leadership
Managment