Electrical Engineer
Al-Khafji Joint Operations
Total years of experience :42 years, 5 Months
with over Thirty years’ experience in engineering design, asset performance management, supervision, project management and planning, contract initiation and execution, commissioning, construction supervision, equipment testing, troubleshooting, cost and manpower estimates.
Engineered and designed complete electrical systems that include: Oil and Gas, petro-chemical plants, offshore facilities, Terminal Marine, Data Processing Centers, industrial and office buildings.
Prepared high, medium and low voltage power distribution systems, materials specifications and bid packages.
Calculated loads, voltage drop, short circuit, relay coordination, transient stability, fault analysis and all other technical and code requirement.
Managed and Participated in HAZOP and Risk Assessment studies for various projects
Managed, supervised, planned and scheduled job activities for engineers and technical crew in offices and fields.
Safety and risk management coordinator, in addition played a major role in creating and be part of technical support and asset performance management divisions.
in Al-Khafji Joint Operations (Saudi Aramco and Kuwait Gulf oil Company). I was handling engineering matters while ensuring safety and standards compliance.
Duties included engineering, designing and specify equipment for new major and minor projects, prepared technical scope of work for new off-shore, Terminal Marine and onshore activities including upgrade existing Data center and prepare DBSP for new four- tier system Data Center, provided technical consultancy for modified industrial, residential and Hospital facilities projects.
Play key role in establishing new engineering department, and asset performance management division, Operation/ Business Plan, prepare new contracts, initiating department policies and procedures.
Participate and facilitate HAZOP studies, Risk identification and Safety Hazards workshop, Represent Company in Best practices conferences
Lead investigation teams for incidents/ accidents at KJO
Initiated and executed Contracts for General Engineering Services, Power Study for all generation and distribution electrical system.
for Saudi Aramco Qatif GOSP 2 Project. That include; 110 kV. Switchyard, High and low voltage Switchgears, Motor control centers, and auto transformers for 10, 000 HP motor pumps.
Duties include: Scope of Work for electrical, Instruments, security and communication distribution systems. Writing Specifications, Request for Quotation, Vendor submittal evaluation, in addition supervise other engineers and designers in Preparing Electrical transient Analysis (ETAP) study.
team. Duties included monitoring and assisting contractors in major Yanbu area project such as Process fired heaters, replacing all electrical unsafe switching devices up to 34.5kV. Provide technical review of work packages completed by design contractors and Manufacturers.
in Rabigh refinery, duties included engineering and design for various Refineries, Marine areas, Power Plant, and Community Electrical projects such as new UPS systems, refinery major upgrade, new 34.5kV, 60 Megawatt overhead transmission lines.
Cleared and resolved Due Diligence items. Provide field support and inspect various projects under construction. Supervised all Rabigh Refinery Substations PM works during GRATA 1998 Refinery shutdown.
LMMS Building 104 Project Lockheed Martin Company Prepared and engineered power distribution system for new Industrial building, design package includes two medium voltage substations with all accessories.
Akosh/NEC Safety Compliance. Alyeska Pipeline.
Prepared and submitted study assessing the condition of Alyeska Pipeline Pump stations electrical system. Investigated and Developed scope of work examining and identifying all standards and code non-compliance items regarding cables, cable trays, Switchgears, motor control centers and grounding.
Reformulated Gasoline Program; Chevron USA
Engineered and supervised other engineers and designers to provide power for a new process system that included variable frequency drive for 10, 000-kVA compressors, 25 motors with sizes from 100 to 400 HP and all other power, lighting and communication requirements.
worked on Electrical, Communication, mechanical and fire alarm control system. Hired, supervised and trained new maintenance crew, planned and scheduled job activities, prepared preventive maintenance program, ordered material, and monitored contractor’s performance
1