Project Electrical site Engineer
SEPCOIII
Total years of experience :8 years, 9 Months
Testing and QC check all equipment from 400V to 11KV.Follow up and checking and working all boiler, turbine control panel connection with subcontractor.MC panel connection and testing. all over grounding testing for power station. after panel connection i can do magger test and making progress report of subcontractor work and sent it our high authority
1. Designed and approved power distribution requirements for high tech machinery.
2. Created electrical drawing using AutoCAD electrical tool set.
3. Performed maintenance procedures and repair existing electronic cards .
4. Prepared technical documentation for operation, troubleshooting, and maintenance of our machine.
1. Work on omiron plc
2. motor alignment and coupling
3. work on DCS method.
4. Training on how to connect circuit breaker with ct and pt and motor dol and reverse forward
connection.
5. Training for electrical safety and fire safety
in
Electrical circuit analysis, computer fundamentals and programing, electric machines, control system, power system protection, microwave engineering, digital signal processing, numerical analysis etc