OMCR Engineer
HighRise
Total years of experience :15 years, 8 Months
Huawei - UFone Project
New Site Creation, Configuring TRX, Blocking/Unblocking a Site, TRX, Time Slot, ABIS, BVC
etc.
SWAP site creation with same existing parameters like site index, ABIS, TRX ID, TRX
frequency and Time slot.
Create External Alarm in BTS & BSC.
Doing BTS power increase, Central Transmitting frequency change, NSN change, BSIC change,
BCCH change, VSWR parameter change, BSIC change, HSN change etc through OMCR.
GPRS activation, Handover creation (Inter & Intra), Cell Info Display in all BSCs .
Doing LOOP/BREAK testing for E1 through OMCR.
Taking Backup of all BSCs on Weekly basis.
Alarm Monitoring, Resolution of faults, Operation and Maintenance.
Monitoring and analysis of alarms in the network elements and providing support to Field
Engineers for the rectification of the concerned issues.
Alarm Fault management activities such as daily BSC health check-up, daily site outage and On-
Air Sites Reporting.
Fault handling & clearance through alarm monitoring.
Alarm monitoring in all BSCs/MGW through OMCR.
To take Docket Number for fault issue in Sites (Power Issue & Media Issue).
To remove all the active BSS (BSC &BTS) alarms from the OMCR end.
Check E1 status of BSC, MSC/MGW.
Huawei Project
Installation of APM30.
Installed the battery banks
Patched and verify the alarms from NOC Media clearness from site to site.
Installation of DBS 3900.
Installation of 3G and 4G rollout sites.
Expansion of RRUs and RFUs
Rectifier Power swaps activities.
Installation of 3G to 4G sites
Troubleshooting of DBS3900.
Resolve the VSWR issue and achieved the required VSWR
Installation of power cube CES500.
Huawei - CMPak BSC/OMCR experience
4G ZONG Project
• eNodeB Configuration & integration of test sites.
• eNodeB alarms monitoring & troubleshooting.
• Configuration & Troubleshooting of DBS3900 through CME.
• Conversions of 3G to 4G sites
• License upgrade of enodeb
• Swap activities of ALU to Huawei
• Troubleshooting of DBS3900.
• eNodeB Configuration of rollout sites at RF OMC end.
• Define the NBRs of rollout sites ready for DT.
• Coordination with DT teams.
• Export and Monitor the KPI’s report.
• Define the KPI template for daily stats report.
• Define the alarms template to monitor COA sites.
3G ZONG Project
• 3G NodeB configuration & integration
• NodeB Monitoring & troubleshooting
• DC implementation of NodeB
• Troubleshooting of DBS3900 Integrated the sites in RNC
• Software upgradation
• License distribution of Nodeb
• Nodeb sites offer for SSV
• Configuration & Troubleshooting of DBS3900 through CME.
2G ZONG Rollout
• M2000 and BSC’s Licenses upgrades.
• Pre and Upgrades of BSC’s software.
• Configuration of BTS3900 and DBS3900.
• Cutover and Rehoming of BTS.
• Cell/TRX and E1 expansion on sites.
• Configure External Alarms for outdoor and indoor sites.
• Monitoring BSC/ BTS Alarms and troubleshooting.
• Provide support to Transmission team members for Media Verification.
• Configure of Abis links (Adding and Removing).
• Troubleshooting of DBS3900 Integrated the sites in BSC
• Hardware/ software expansion of sites
• Configuration & Troubleshooting of DBS3900 through CME.
• I have hand experience installation of CES (Cost effective solution) on Mobilink project.
• Installation of SAU and ECC500 with DCDU and without DCDU.
• Commission of Emerson, Delta and Flat peck rectifiers with CES.
• All activity done without outage in without DCDU activity.
• Ensure the Minimize outage during the DCDU activity.
• Patched the alarms and verify from Huawei and Mobilink NOC.
• Check and clear the alarms reverse priority.
• Installed the battery banks and follow up battery current through CTs.
• Patched and verify the external alarms from NOC
• I have hand experience of installation of DBS3900.
• First Level Maintenance of Huawei DBS (3900).
• First Level Maintenance of Huawei BTS (3900, 3900A)
• Preventive Maintenance of all DBS/BTS (Huawei) sites.
• Resource allocation for Preventive AND Corrective maintenance activities.
• Resource management, logistics’ management, customer support.
Ericsson-Mobilink Project
• I have experience installation and rectification of RBS 6101, 6201 and 6301.
• Installation of 3G sites.
• I have experience, Commission of 2P, 6P, 20P and CN.
• Commissioning of 1+0, 1+1 M/W link.
• Align the links 0.3m, 0.6m. 1.2m, 1.8m and achieved the required RXL level.
• Resolve the VSWR issue and achieved the required VSWR
• Clear the sector swapping issues.
• Patched the external alarms and verify from NOC.
• Minimize the outage during the Hot Swap.
MSC-MGW Mobilink
• Rectifiers (Delta1200/2000, Emerson, Saft Power System, Flat Pack), battery banks, ATS, PDP panels, Safety & Fire alarm equipments’ installation, commissioning and Alarm-Testing.
• BTS and BSCs’ external alarms systems: Intruder, fire, temperature handling, commissioning & installation.
• To ensure the availability of power (-48v DC) to BTS/BSC cellular sites and the assurance of A.C (440-220)v
• Rectifiers, grounding (earth-connections) and control systems.
• Supervision of P.M team for P.M services of cellular sites.
• Minimize the outage in case of BTS/BSC problem
• BTS troubleshooting & overcome the outage
• MGW Genset, transformer & ATS panel PM/CM check
• PM /CM of BSC, BTS Gensets 20KVA to 1000KVA
• Have basic knowledge about BTS 3900, DBS3900, APM30 & APM200
• Operation and maintenance of BTS (240XL, Mini/outdoor)
• Operation and maintenance of microwave transmission NEC:
• Alarm escalation and team movement in accordance with the alarms.
• I have hand experience of installation of APM30.
• Have basic knowledge about BTS 3900, DBS3900, APM30 & APM200
• I have worked in TRANMISSION & M/W, FADREL CABLE.
• Installation the hardware of ODU and IDU.
• Installation and alignment of Microwave Antennas ( 0.3m, 0.6m, 1.2m, 1.8m )
• Ensure that Enjoinment alarms are patched properly with BTS, BSC, and MSC & MGW and verified through NOC
• Installation of ATS and Main DB panel and their troubleshooting.
• Troubleshooting of different type of Genset during PM and CM.
• Coordinate with Customer for any CM issue and satisfied them.
• Manage the team and arrange the resource accordingly.
• Patched the all Envoirment alarms including Genset with BTS.
• 6-Genset safeties troubleshooting and ensure the Genset safeties are operationally properly.