Moazzam Ali, Electrical Engineer

Moazzam Ali

Electrical Engineer

Synergy (Generation & Retail Corporation)

Location
Australia - Perth
Education
Master's degree, Master of Engineering (Electrical Power)
Experience
10 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :10 years, 6 Months

Electrical Engineer at Synergy (Generation & Retail Corporation)
  • Australia
  • My current job since January 2023

Cockburn Power Station, Naval Base, Australia Electrical Engineer

• Ensure Safety, reliability and availability of electrical equipment and be responsible for the management of all repairs and maintenance of Power generation equipment in Coral Bay, Hopetoun, Bremer Bay, Kalgoorlie, Kalbarri Power Stations, KBESS 1 and KBESS substation 100MW/200MWh, VPP4S Schools and Alkimos BESS.
• Provide expert advice on the ongoing management and operations of generation assets in allocated Power stations.
• Conduct RCA (Root Cause Analysis) investigations into the plant operational incidents/faults and identify opportunities for resultant improvement repairs and maintenance
• Investigate plant operating/performance problems, as reported by others, or observed through frequent contact with the plant, devise and recommend or initiate solutions.
• Plan, supervise/coordinate or carry out activities, associated with manufacture, installation, commissioning, operation and maintenance/repair of equipment and systems as required.
• Carry out technical inspection, prepare reports with recommendations and/or arrange necessary action.
• Prepare/check/assess/coordinate designs, calculations, estimates, sketches, specifications/tenders, working drawings and schedules.
• Contribute to the development of innovative strategies to manage plant risk exposure and maximise business performance.
• Provide Engineering support to outage leads during plant shutdowns.
• Accountable for all HV, LV, instrumentation and controls decisions made regarding the plant.
• Development of plant inspection, safety and work procedures and train relevant personnel in those procedures.
• Assess and recommend critical plant spares requirements and material procurement.
• Develop Asset Management Plans and strategies for plant reliability.

APD Engineering Australia at APD Engieering
  • Australia - Perth
  • August 2021 to December 2022

Designed, drafted, developed/ configured, tested, and commissioned of HV Substation
automation and process control.
 Configured and commissioned of HV substation RTU/PLC, I/O Cards and HMI & network
equipment including Eaton cooper, GE D200, Siemens & ABB.
 Implemented HV substation automation protection systems & schemes.
 Commissioned on site of HV substation Automation SCADA equipment & ELV
automation cubicle wiring and cable termination.
 Executed substation protocols DNP3, Modbus & IEC 61850 (GOOSE & MMS).

Electrical Engineer at Industrial Automation Group Australia
  • Australia - Perth
  • October 2018 to July 2021

Prepared and reviewed Job safety analysis reports for clients.
 Designed power distribution and control system including motor control centre, circuit
breakers, switches, transformers, PLC, relays and HMI.
 Designed electrical drawings in AutoCAD and Microsoft Visio software:
o Three line/single line diagrams
o Panel layouts
o Cable schedules
o Schematic diagrams
o Termination Diagrams
 Prepared a costing/estimating report for tenders.
 Attended customer enquiries, quotation, requests, order, and complaints.
 Participated in the selection and negotiation of engineering and construction contractors.
 Executed Project works, safety and quality checks, troubleshooting and fault finding of power
and control system.

Assistant Manager Operations at Gul Ahmed Textile Mills Power Plant
  • Pakistan - Karachi
  • April 2011 to January 2016

Prepared and reviewed Job safety analysis reports for clients.
 Designed power distribution and control system including motor control centre, circuit
breakers, switches, transformers, PLC, relays and HMI.
 Designed implementation based on best suited technical and economic solution.
 Reported to Management on Power Plant progress, costs, schedule, safety, quality, etc.
 Worked with other company Project Managers, under the direction of the Project Director, to
coordinate the
 integration of the Power Plant.
 Participated in the selection and negotiation of engineering and construction contractors.
 Responsible for project Quality Assurance/Quality Control.
 Reviewed/developed technical standards, specifications, drawings and documents.
 Investigates operating abnormalities and incidents to improve equipment availability and
performance and to minimized maintenance requirements.

Education

Master's degree, Master of Engineering (Electrical Power)
  • at Edith Cowan University
  • July 2018

Specialties & Skills

Primary substation
Secondary Substation
Substation Automation
PowerPlant
Power Generation
Team work
Technical Writing
Communication
Project management
Electrical Design
Power Generation
Asset Engineering

Languages

English
Expert

Memberships

Engineers Australia
  • Electrical Engineer
  • October 2018