MEP LEED Manager
Arabtec
مجموع سنوات الخبرة :32 years, 9 أشهر
-Arabtec, Dubai Construction Company 2007-2014
List of projects: • Msherieb downtown project at Doha, Qatar
• Agha Khan university in Karachi-Pakistan
• Karachi financial towers- Pakistan
• Burj Dubai Lake hotel, Dubai, UAE
• Lamar towers Jeddah, Saudi Arabia
• Princess Nora university at Riyadh
• Saudi Arabia national guard at Al hassa
1-Sustainability Manager (Qatar)
Reported to project manager and responsible for: • Preparing LEED action Plans based on the Qatar law and regulation, project specification and LEED rating system.
• Implementation and coordination with the consultant and all subcontractors related LEED issues.
• Review all material submittals to be in compliance with the LEED requirements.
• Oversees and monitor the construction activities pertaining to the LEED requirements
• Set up filling system contain all LEED related credits including at least the LEED action plans, LEED credit trackers, LEED submittal templates with all supporting documentation.
• Conduct training to all working at the project to be aware about LEED.and Green Buildings concept.
2-Sr.MEP coordinator (Saudi Arabia)
Reported to project manager and responsible for: • Directing the MEP coordinators and site engineers.
• Co-ordination the implementation of project with the consultants and the subcontractors.
• Coordinate with the technical department for MEP builders work
• Ensuring that the MEP works executed in accordance with specification, approved shop drawings and method statements and adhere to the QA control documentation.
• Checking the material submittals and the shop drawings according to the contract drawings
• Verifying the design of the mechanical work as pipes and duct sizes, cooling load, sprinkler system and hydraulic calculation
• Participating in value engineering
ATCO, construction company Dammam, (Saudi Arabia) 2006 -2007
Mechanical manager
• -coordinate with the consultants, suppliers and subcontractors
• Coordinate with the technical department for MEP work
• -Supervising MP site engineers
• -follow up technical logs
• -Making material requests, Follow up delivery of materials and equipments
• -Verifying the design and installation of air conditioning, duct work, chilled water piping according to the requirement, pump work, plumping and fire fighting system, cooling load calculation
List of Projects: 1-Alhugayet commercial tower, Alkhobar
2-SABIC, Al-Jubal
3-Prince Mohamed Ben Fahd university, Dammam
Sraco contracting - (Saudi Arabia) 2004---2006
• -In charge of electromechanical systems (air-conditioning work, boilers, RO water plant& sewage treatment plants, pumps, fire fighting,
• -Participating of value engineering
• -preparing bill of quantity
• -supervising the technical activities
• -Test and commissioning of electromechanical works
-Preparing as built drawings& list of operation and maintenance manuals
List of Projects;
-Science collage, Dammam
-King Fahd specialist hospital, Dammam
- Saudi Aramco in khobar.
ALSTOM-France for construction (Egypt branch) 2000----2004
Technical manager of project of Air conditioning and dewatering pumping system project of underground Metro station L2, Cairo.
12, 000 ton refrigeration from district cooling plant. To supply chilled water to the stations
• -In charge of the installation of HVAC equipment, ventilation, smoke extracts system and Lift stations.
• -control and monitoring of Building management system (BMS) interconnected to the electromechanical systems
- Test and commissioning
• -Coordination with the French consultant (spee)
• -Managing maintenance contract after project completion.
6-CAC - Power Egypt 1992-2000
Senior sector engineer in charge of installation and maintenance of air-conditioning (chilled water system, DX unites package and split units, VAV units)
• -coordination with the consultants to make sure that the work conform of the specifications
• -preparing bill of quantity
- making cost estimation
• -Test and commissioning
• -Handing over the projects and technical troubleshooting and correction
To client satisfactory
Partial list of some projects: • 1-Cairo airport, Egypt
• 2-Nile tower building, Cairo
• Japanese embassy Cairo.
• Ministry of foreign affairs
• Hilton sharm hotel
• Taba mall
• 7-Gulf air line, Cairo
National marketing company - (Libya) 1985---1991
• Operation department for the mechanical work in eastern province area branches: refrigeration plants, cold stores and air conditioning units
• -supervising the installation of electromechanical units, pumps, A/C units
• -duct design and fabrication
O.M.P (Finland) company - (Libya branch) 1982--- 1984
• Procurement and estimation engineer of the construction projects
• Preparing material requests
• Follow up materials approval
• preparing as built drawings
1- Bachelor of Mechanical engineering-Helwan university Grade : very good 1974-1979 2- Master degree (High study diploma of air conditioning &ventilation) Ain shams university, Egypt Grade: good 3-Certified Project management professional (PMP) 4- LEED AP(BD+C) 2012 5-LEED AP ( O+M) 2013 6-LEED AP(ND) 2014 7-GSAS-CGP 2013 8-LEED AP for Home s 2014
1-Bachelor of mechanical engineering 1974- 1979 Helwan University, Egypt Grade: very good