business developer
Albilad firefighting systems ltd
Total years of experience :18 years, 9 Months
assisting sales and contract department to get, start and close the contracts according to the firm plan
• Managed Progress - deliverables are being completed within baseline time scales • Controlled Cost - deliverables are being completed within the baseline cost plan • Controlled Quality - deliverables are being completed to defined expectations. • Monitored Performance (Value) - progress is being earned for the expected cost • Managed Cash flow - net project cash flow is being achieved as defined expectation. • Implemented SHE - the required Safety, Health & Environmental standards.
• Accomplished human resource objectives by recruiting, selecting, orienting, training, assigning, scheduling, coaching, counseling, and disciplining employees. • Achieved operational objectives by contributing information and recommendations to strategic plans and reviews. • Meet financial objectives by forecasting requirements. • Negotiated and contracted with four subcontractors for piping, cathode protection, scaffolding and shipping services. • Led a team of 147 personnel including engineers, procurers, designers, planners, supervisors, QA/QC staff, and employees responsible for all other site functions. • Managed supply, design, installation, and testing & commissioning of the following technical systems: supersession system, wet sprinkler system, FM 200, NOVIC, VISDA system, fire Hydrants, fire monitors, fire hose reel, and piping (RTR, GRP, cement coated and aboveground steel pipes). • Managed material delivery, both foreign and local, that avoided a delay that could have put the project months behind schedule. • Compiled and edited comprehensive quality control reports.
• Led a team of 103 personnel on site including engineers, designers, planners, supervisors, QA/QC staff, and all other site functions.
• Managed design, installation and commissioning of the following technical systems: dry sprinkler system, wet sprinkler system, FM 200, and VISDA system, security systems.
• Managed the correct preparation and implementation of method statement, job hazard analysis, inspection test plans, commissioning data book and other deliverable technical documents for approval by client.
• Controlled the site both from a financial aspect and an administrative aspect. Reported the status of project and other findings to head office on a weekly basis.
• Developed and implemented an HSE policy which resulted in a site which was LTI-free and incident-free for the 300, 000 man-hours spent on site.
• Installation supervisor of water treatment plant, HVAC, and electrical arc furnace.
• Led site erection team of 50 personnel including: foremen, electricians, operators, and surveyors.
• Inspected MEP construction to ensure compliance with applicable building codes and contract docs
• Witnessed and documented system testing and commissioning.
• Assisted Construction Manager with evaluation of change order work scope and cost estimates.
• Installation supervisor of water treatment plant (RO, cooling tower, pumping station, piping …etc.), firefighting systems, control systems.
• Raised all technical requirements and implemented required corrections and modification.
• Drawn red-line drawing and as-built drawing after.