محمد عباس, Lead Commissioning Engineer / Commissioning Manager

محمد عباس

Lead Commissioning Engineer / Commissioning Manager

ADNOC

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, communication; Electronics & Communication & control engineering
الخبرات
19 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :19 years, 0 أشهر

Lead Commissioning Engineer / Commissioning Manager في ADNOC
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ أكتوبر 2021

Managing Commissioning and Instrumentation, Control systems, Carrying out SAT, instrumentation Loop check, functional test for DCS Logic, ESD & HIPPS, FGS, VESDA, FACP / Fire suppression, HIPPS, HVAC, Gas lift, Gas injection compressors UCP packages Commissioning and integration with Yokogawa ICSS system, WHCP SAT, Commissioning & functional check For Pads, BAU and new train at CDS, ICSS integration for new project with existing main control room at CDS

Bu-Hasa Integrated Field Development Project - UAE - ADNOC Onshore PMC

Superintendent (Department Head) في YAMAL LNG Project / Technip-FMC - Russi
  • فبراير 2018 إلى سبتمبر 2020

, Phase-1, 2, 3 of YAMAL LNG instrument Control Systems, FGS & OTS, Planning the commissioning schedule, activities, SAT, Functional testing, MOCs & software change requests, OTPs, Performance test, punch lists clearance and handover to CPY.

Lead commissioning Engineer في YAMAL LNG Project / Technip-FMC - Russia
  • روسيا - Moscow
  • أغسطس 2017 إلى فبراير 2018

, Managing and carrying out Functional Testing Activities, SATs MOCs & software change requests and OTS, Punch lists clearance. managing ICSS & FGS team (engineers, supervisors and technicians) for commissioning, start up and sequences functional testing of the ICSS & UCP Packages, FGS systems, Fire suppression systems, PAGA, preparation of commissioning / SAT dossiers for the different Project units / Packages, Hand on Functional testing and Verification of C&E / SLD of PSD, FGS, and ESD Systems, rechecking and verification of all instrumentation functionality within designated project area / package. Making sure the proper implementation and carrying out of different commissioning procedures of ICSS during commissioning phase 1 (Utility, Train-01 and loading / offsite).

  • يناير 2013 إلى ديسمبر 2016

Engineering, implementation for new projects, technical support & Maintenance for different projects / Sites of Shell Sakhalin-2 Projects.
Preventive Maintenances / maintenance planning and Operations support,
MOC‘s (Management of Change), SCR’s (Software change request) Implementation.
Carrying out & planning for Annual shutdowns scope and activities.
Upgrade to new Centum VP Yokogawa, upgrading new Prosafe-Com Mulcoms, Multi Projects Domain IOS Upgrade to Centum VP, and WAC Routers upgrade Vnet to Vnet/IP. On job training for company Engineers in order to manage DCS, Safety systems and Foundation fieldbus maintenance.

Commissioning Lead
  • أكتوبر 2011 إلى يونيو 2012

, Yokogawa Stardom PLC RTU / ENMC; Yokogawa SIS Prosafe-RS Safety system, and Yokogawa Fast/tools SCADA Version 9.2, carrying out all commissioning / start up activities/ Functional testing for different logics, carrying out the functional testing and verifications of the C&E for FGS/ESD System; doing all required planning and generating the required Yokogawa redline / as built documents

Sakhalin II South-GTT Russia- (SEIC / SHELL-Gas prom)

Commissioning Lead
  • مارس 2011 إلى ديسمبر 2011

, Yokogawa Stardom PLC RTU / ENMC; Yokogawa SIS Prosafe-RS Safety system, and Yokogawa Fast/tools SCADA Version 9.2, carrying out commissioning / start up activities / Functional testing for different logics, carrying out the functional testing of the C&E for FGS/ESD System; doing all required planning and generating the required Yokogawa redline / as built documents

Sakhalin II Projects OPF - Russia- (SEIC / SHELL)

SCADA engineer
  • فبراير 2010 إلى مارس 2011

, carrying out maintenance activities and implementation of new projects and software changes, support Foundation fieldbus instrumentation replacement and configuration

Sakhalin II BS-2 Project - Russia- (SEIC / SHELL/KOGAS-Teck- EASTROY)

Commissioning Lead
  • فبراير 2007 إلى مايو 2009

for all Sakhalin-2 sites, Yokogawa DCS (CS3000), Yokogawa SIS Pro-Safe Safety system, SCADA Fasttools, carrying out all commissioning / start up activities, supporting the Fieldbus instruments commissioning / troubleshooting, functional testing the C&E for FGS/ESD Systems; ModPacks required planning and implementation, generating the latest redline / as built documents, carrying out the scheduled shutdown activities since 2009 till 2016

Lead engineer في GUPCO Rehabilitation Project BADRI Platform
  • كندا
  • مارس 2006 إلى فبراير 2007

; From the bidding Phase, the main supplier for ENMC /UPS/Prefab Building, Yokogawa DCS (CS3000), Yokogawa Prosafe-Rs SIS, field instruments replacement, FGS systems, Fire suppression systems, PAGA & Telecom systems, carrying out Startup & Commissioning, Generating all Functional Design Specifications & complete design, complete engineering phase and FAT. Revising SIS (Pro-Safe RS) FDS & Documentation before submission to the client, handed over the SIS System to carry out the I-FAT, SAT and commissioning / start up
Yokogawa CS3000 & Prosafe RS training for client engineers.

Lead engineer في KHALDA Petroleum co
  • مصر
  • يناير 2006 إلى يوليو 2006

Generating all Functional Design Specifications & complete design, complete engineering phase, FAT, SAT and start up

RASHPETCO-OPF Simian sienna Project (British Gas / ENPPI)

Lead في IICP
  • مصر
  • يناير 2005 إلى ديسمبر 2005

, Yokogawa DCS, (CS3000), Foundation Fieldbus segments design, Functional Design Specifications (FDS) & system design, complete engineering phase, FAT and SAT, carrying out field instruments commissioning and site startup & operations support

ICSS Engineer في AFCO Fiber Company
  • يونيو 2004 إلى فبراير 2005

CS3000), support for both control & field instrument sides, instructor and trainer (On job) of Fieldbus instrumentation; preparing the required materials / documents of the training of Foundation Fieldbus on site

Instrument And Control Engineer في SEGAS LNG Projec
  • مصر - دمياط
  • سبتمبر 2002 إلى مايو 2004

الخلفية التعليمية

بكالوريوس, communication; Electronics & Communication & control engineering
  • في Cairo University
  • نوفمبر 2001

Faculty of engineering electronics and communication

Specialties & Skills

Foundation Fieldbus
Yokogawa Prosafe
Yokogawa Fasttools
Yokogawa Prosafe RS
Yokogawa DCS CS3000 & CENTUM VP
Instrumentation
Foundation Fieldbus
Commissioning &startup
ESD/FGS
Yokogawa
Maintenance
control systems

اللغات

الانجليزية
اللغة الأم
الروسية
متمرّس
العربية
اللغة الأم

التدريب و الشهادات

RMP-PMI Certification-Number 3733710 (الشهادة)
تاريخ الدورة:
January 2024
صالحة لغاية:
January 2030
PMP-PMI Certification-Number 3719903 (الشهادة)
تاريخ الدورة:
December 2023
صالحة لغاية:
December 2029
Functional Safety Eng SIS (TÜV Rheinland#12398 16, SIS) (الشهادة)
تاريخ الدورة:
May 2016