mechanical engineer ( construction)
kharafinational
Total years of experience :15 years, 2 Months
Simple cycle power plant 4 GTs x 125 MW GE frame 9E
Scope of work.
• Review the receiving material to ensure that the receiving is matching with contract specification and design requirement.
• Review the piping design documents (P&ID, Isometrics and supports details).
• Prepare the required Man-hour estimate for my scope in the project.
• Review the piping activates and completion in accordance with schedule requirements.
• Responsible for arrangement and co-ordinate between the piping fabrication at the workshop and site activates.
• Off base piping erection (the interconnections between the Gas Turbine and the Auxiliary of it)
• Preparing work package for construction activities and method of statements.
Habchan 3 - OGD111 . Onshore Gas Development phase 3.
United Arab of Emirates (UAE).
Position: Quality Control team lead-Handover Engineer.
Scope of work.
• Review the erection activities (piping and equipment) and completion in accordance with schedule requirements.
• Responsible for handover all the project systems according to the procedure and stander
• Involved in the punch items list to avoid the handover delay.
• Preparing the handover Documentation at the procedure (test package, P&ID and handover form).
• Attend the weekly meeting with owner (GASCO -UAE).
• Lead the hand over team (different nationalities)
• This project is the largest project in medial east.