Total Years of Experience: 16 Years, 9 Months
May 2022
To Present
Senior Technical Structural Engineer
at ALJABER Engineering
Location :
Qatar - Doha
Senior Technical Structural Engineer
June 2016
To May 2022
Senior Structural Engineer
at Dimensions Engineering Consultant
Location :
Qatar - Doha
Senior Structural Engineer
June 2015
To May 2016
Senior Structural Engineer
at Al Amar Consulting Group S.A.
Location :
Egypt - Cairo
Working as Senior Structural Engineer Assigned on the Following project:
•AYDEM MILITARY CAMP - DHOFAR Sultanate of Oman :
The project consists of : Residential buildings, Administrative buildings, Stores and warehouses, and Utilities buildings.
All buildings are presented using Revit Structure 2014 .
The structural design criteria includes BS1997, BS6399-95 (Wind load ) and UBC 97(Seismic criteria).
•AYDEM MILITARY CAMP - DHOFAR Sultanate of Oman :
The project consists of : Residential buildings, Administrative buildings, Stores and warehouses, and Utilities buildings.
All buildings are presented using Revit Structure 2014 .
The structural design criteria includes BS1997, BS6399-95 (Wind load ) and UBC 97(Seismic criteria).
June 2013
To June 2015
Structural Engineer
at AL Fanar Company
Location :
Egypt - Cairo
•South Jizan (K.S.A) Hospital 300 Beds.
•Al-Kharj (K.S.A) Hospital 300 Beds.
•Prince Sattam Bin Abdul Aziz General Hospital (West Riyadh) 500 Beds.
Each Hospital Consist of Main Building, Ancillary Buildings (Chiller Yard, Mosque, Technical Plant, Guard rooms, and Maintenance & warehouse building), also Dialysis Unit (20 Chairs), and Single Female Housing.
•Al-Kharj (K.S.A) Hospital 300 Beds.
•Prince Sattam Bin Abdul Aziz General Hospital (West Riyadh) 500 Beds.
Each Hospital Consist of Main Building, Ancillary Buildings (Chiller Yard, Mosque, Technical Plant, Guard rooms, and Maintenance & warehouse building), also Dialysis Unit (20 Chairs), and Single Female Housing.
April 2012
To June 2013
Structural Engineer
at Joannou and Paraskevaides limited
Location :
Saudi Arabia - Riyadh
• Joannou and Paraskevaides limited Overseas (J&P) (March 2012): • ITCC Project 17 Parcels (Information Technology and Communication
Complex): The project consists of 17 buildings with different systems Flat slab, solid slab, paneled beams, steel bridges connecting buildings,
I Work as Structural Engineer in the Technical Office of this Project.
-Reviewing work shop drawings beams, slabs, columns.
-Reviewing calculations submitted from Façade engineer (Al ghurair co.)
-Prepare design drawings for any structural element (slabs, beams, columns and foundation) in any of these buildings, and prepare design calculations according to American Code.
Structural Engineer
Complex): The project consists of 17 buildings with different systems Flat slab, solid slab, paneled beams, steel bridges connecting buildings,
I Work as Structural Engineer in the Technical Office of this Project.
-Reviewing work shop drawings beams, slabs, columns.
-Reviewing calculations submitted from Façade engineer (Al ghurair co.)
-Prepare design drawings for any structural element (slabs, beams, columns and foundation) in any of these buildings, and prepare design calculations according to American Code.
Structural Engineer
June 2007
To March 2012
Structural Engineer
at ECG Cairo
Location :
Egypt - Cairo
• ECG Cairo (Engineers Consultants Group) (March 2008-March 2012): I Prepared Design drawings with calculations for the following projects: • Soma Breeze Hotel Residences project in RED SEA Egypt
• Ware house building in Energya Power Cables Factory 10th of Ramadan city.
• Madinaty Open Air Mall.
• Ghabbour Service Area in Assuit. (steel and concrete structure)
• Sphinx office building (smart village)
• Capital market authority (two buildings at smart village cairo)
• Dar el Elfta administrative building.
• Smart village shopping center.
• Ritz-Carleton Palm Hills Golf Club and Resorts Hotel: this hotel consists of 6
parts my scope was 3 parts of 6 starting from putting the structural system;
design all concrete elements (foundation, columns, slabs, and beams)
• Sodic East Town Blocks: the project consists of 4buildings planted on a podium of two basements; I prepared structural calculations for the planted buildings.
• Al Ruwais Mall project UAE: I designed Columns, Walls and Foundation for 3
parts of 8 and prepared their Work Shop drawings according to ACI Code
taking in my consideration the seismic effect (Response spectrum method)
• Ware house building in Energya Power Cables Factory 10th of Ramadan city.
• Madinaty Open Air Mall.
• Ghabbour Service Area in Assuit. (steel and concrete structure)
• Sphinx office building (smart village)
• Capital market authority (two buildings at smart village cairo)
• Dar el Elfta administrative building.
• Smart village shopping center.
• Ritz-Carleton Palm Hills Golf Club and Resorts Hotel: this hotel consists of 6
parts my scope was 3 parts of 6 starting from putting the structural system;
design all concrete elements (foundation, columns, slabs, and beams)
• Sodic East Town Blocks: the project consists of 4buildings planted on a podium of two basements; I prepared structural calculations for the planted buildings.
• Al Ruwais Mall project UAE: I designed Columns, Walls and Foundation for 3
parts of 8 and prepared their Work Shop drawings according to ACI Code
taking in my consideration the seismic effect (Response spectrum method)
Share on Facebook
Share on Twitter
Share Via Email