Mohamed Alaali, Project Manager/S. Engineer

Mohamed Alaali

Project Manager/S. Engineer

WS Atkins

Lieu
Bahreïn - Manama
Éducation
Master, Business Administration
Expérience
21 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :21 years, 4 Mois

Project Manager/S. Engineer à WS Atkins
  • Bahreïn - Manama
  • août 2007 à septembre 2013

Currently working as Project Manager with W.S Atkins (Engineering Consultancy). Main responsibilities include managing projects from the conception stage throughout completion stage ensuring projects are being completed to successful outcomes. Other responsibilities include project proposal preparation at the project planning phase by developing project costs, resources requirements, managing project risks and associated costs, preparation of methodology and approach of the implementation.
Additional responsibilities working as Senior ICA Engineer include preparations of feasibility studies, conceptual and detail design, functional design specifications and design review of EPC contract of all related instrumentation, control and automation, and SCADA works.

Member à The Institution of Measurement and Control
  • Royaume Uni - London
  • juin 1996 à septembre 2013

Member, The Institution of Measurement and Control - UK, 1996.
Registered with Engineering Council - UK, 1993 and Bahrain Committee of Professional Practice, 1994.

Project Manager à WS Atkins
  • Oman
  • janvier 2007 à septembre 2013

2007 - Present Project Manager, WS Atkins - Bahrain.

Member of Project Management Institute - USA à Countries
  • janvier 2007 à décembre 2007

Member of Project Management Institute - USA, 2007.
Countries of Work Experience

Bahrain, Saudi Arabia, Kuwait, Korea and United States of America.
Experience Record

Project Manager and Senior ICA Engineer à W.S. Atkins
  • Émirats Arabes Unis
  • janvier 2007 à décembre 2007

2007 - Present W.S. Atkins
Project Manager and Senior ICA Engineer


Masder City - Masdar Institute of Science and Technology (MIST) Project - Abu Dhabi: Project scope consists of preparation of concept design, scheme design, detail design, tender evaluation and site supervision and commissioning of all security aspects of Masdar Institutes of Science and Technology. The project consists of four phases (MSIT 1A, 1B, 2 and 3) . Worked as project manager for this project.

Diyar Al Muharraq - Bahrain: Project scope consists of development of concept design, detail design and construction documentation for telecommunication infrastructure for Diyar Al Muharraq development. Worked as project manager for this project.

West Seef District Cooling Project for Tabrred - Bahrain: Project scope consists of development of concept design, detail design and construction documentation for district cooling pipeline network for Seef Area. Worked as project manager for this project.

Bahrain Financial Harbour District Cooling Project for Tabrred - Bahrain: Project scope consists of development of concept design, detail design and construction documentation for district cooling pipeline network for Bahrain Financial Harbour development. Worked as project manager for this project.

Block 338 Adliya for Ministry of Municipalities and Agriculture Affairs - Bahrain: Project scope consists of concept design, detail design and construction documentation for roads, landscape, drainage network and street lightings, and coordination with authorities such as Ministry of Work and Electrical and Water Authority. Worked as project manager for this project.

BIIP Water Pumping Station for Ministry of Industry and Commerce: Project scope consists preparation of upgrade feasibility design report, project's specification, tendering and evaluation, site supervision. Worked as project manager for this project.

Bahrain Financial Harbour Water Pumping Station for Electrical and Water Authority: Project scope consists of concept design, detail design and site supervision for the works associated with civil, structure, mechanical, electrical, instrumentation and control, and SCADA for BFH Water Pumping Station worth build of USD 28.5 million. The scope also includes contractors' prequalification, tendering and evaluation. Worked as a Design Manager and Senior ICA engineer at design stage and Resident Engineer at construction stage.

Lenders Technical Consultant for Banque Saudi Fransi & Riyad Bank (BSF & RB) for ArcelorMittal Seamless Tube Mill Project at Jubail - Saudi Arabia: Project scope consists of due diligence review of EPC contract worth build of USD 970 million, review of project and construction status, and review of project finance at construction stage. Worked as Lenders Technical Consultant for BSF & RB to review and report the above issues during the project's construction phase.

Lenders Technical Consultant for BNP Paribas for SULB Project at Hidd - Bahrain: Project scope consists of due diligence review of EPC contract worth build of USD 1.2 billion, review of project and construction status, and review of project finance at construction stage. Worked as Lenders Technical Consultant for BNP Paribas to review and report the above issues during the project's construction phase.

Bahrain Bay Utilities: Worked as reviewer of EPC design related to ICA works for Bahrain Bay utilities plants such as district cooling plant and sewage plant.

2003 - 2007 Black and Veatch Ltd.
Senior ICA Engineer and APM

Hidd Phase III Transmission Project - Ministry of Electricity & Water - Bahrain: Project Scope consists of nine EPC contracts (1 pumping stations contact, 5 pipelines contacts, and 3 tanks contacts) worth USD 200 million; development of three new water pumping station at Hidd, Salambad, Buqowah stations and associated pipelines and upgrade of eight existing water pumping stations. The deliverables were preparation of design associated with civil, structure, mechanical, electrical, instrumentation and control, SCADA and preparation of an EPC tender documentation and specifications. In addition, prequalification and evaluation of tenderes and site supervision. Worked as a senior ICA engineer and my responsibilities were to develop the complete ICA and SCADA related design for all pumping stations. Additional responsibilities were to participate in the evaluation and selection of tenders for nine contacts. Moreover, lead the FAT acceptance tests for ICA under this contact. Other responsibility participated in project management and delivery of all above nine EPC contracts.

Hidd Phase III Production Project - Ministry of Electricity & Water - Bahrain: Project scope consists of development of 60 Mgd desalination (MSF) production plant plus 90 Mgd post treatment plant at Hidd area. The deliverables were preparation of design associated with civil, structure, process, mechanical, electrical and instrumentation and control, SCADA and preparation of EPC tender documentation and specifications. Worked as senior ICA Engineer for this project and my main responsibilities were to develop the complete ICA and SCADA related design for the MSF desalination plant. Other responsibility participated in project management and delivery of this EPC contract.

Senior ICA Engineer and APM à Black and Veatch Ltd
  • Bahreïn - Manama
  • décembre 2004 à janvier 2007

Previously worked for Black and Veatch Ltd. (Engineering Consultancy) as Senior ICA Engineer and Assistant Project Manager. Main responsibilities included preparations of feasibility studies, conceptual and detail design, functional design specifications and design review of EPC contract of all related instrumentation, control and automation, and SCADA. Other responsibilities participated in project management and delivery of several contracts, and played a major rule in tendering process from prequalification stage throughout the evaluation and selection stages.

S.Support/Service Engineer à ICS
  • Arabie Saoudite - Khobar
  • mai 2002 à décembre 2004

Also worked for Industrial Control System (ICS) as Senior Services Engineer to assist Houston Business Unit in their expansion and services in the Kingdom of Saudi Arabia. Main responsibilities included services, marketing and sales support, and management of site supervision and commissioning of emergency shutdown system (ESD).

Senior Support Engineer à Industrial Control System - Saudi Arabia
  • Arabie Saoudite
  • mai 2002 à décembre 2003

2002 - 2003 Senior Support Engineer, Industrial Control System - Saudi Arabia.

Senior Control System Engineer à ABB Automation - Bahrain
  • Bahreïn - Manama
  • juillet 1996 à mai 2002

2000 - 2002 Senior Control System Engineer, ABB Automation - Bahrain.

Control System Engineer à ABB
  • Bahreïn
  • juillet 1996 à mai 2002

Worked for ABB as System Engineer and then Senior Control Engineer. Main responsibilities included design, configuration, installation, testing and commissioning of ABB control and automation products such Distributed Control System (DCS), Supervisory Control and Data Acquisition System (SCADA), Emergency Shutdown System (ESD), Information Management System (IMS) and field instrumentation. In addition, participated in pre-sales support, proposal preparation and project planning. Furthermore, conducted training for customers for various ABB control and automation products and played a key role in coordination and resolving issues between ABB and consultants, main contractors and subcontractors.

System Engineer à ABB Automation - Bahrain
  • Bahreïn - Manama
  • juillet 1996 à mai 1999

1996 - 2000 System Engineer, ABB Automation - Bahrain.

Instrument's Technician à Cegelec
  • Émirats Arabes Unis
  • janvier 1990 à décembre 1993

1990 - 1993 Instrument's Technician, Cegelec (Comsip Al'Aali) - Bahrain.
Carrier Summary

Currently working as Project Manager with W.S Atkins (Engineering Consultancy) . Main responsibilities include managing projects from the conception stage throughout completion stage ensuring projects are being completed to successful outcomes. Other responsibilities include project proposal preparation at the project planning phase by developing project costs, resources requirements, managing project risks and associated costs, preparation of methodology and approach of the implementation.
Additional responsibilities working as Senior ICA Engineer include preparations of feasibility studies, conceptual and detail design, functional design specifications and design review of EPC contract of all related instrumentation, control and automation, and SCADA works.

Previously worked for Black and Veatch Ltd. (Engineering Consultancy) as Senior ICA Engineer and Assistant Project Manager. Main responsibilities included preparations of feasibility studies, conceptual and detail design, functional design specifications and design review of EPC contract of all related instrumentation, control and automation, and SCADA. Other responsibilities participated in project management and delivery of several contracts, and played a major rule in tendering process from prequalification stage throughout the evaluation and selection stages.

Also worked for Industrial Control System (ICS) as Senior Services Engineer to assist Houston Business Unit in their expansion and services in the Kingdom of Saudi Arabia. Main responsibilities included services, marketing and sales support, and management of site supervision and commissioning of emergency shutdown system (ESD)

Worked for ABB as System Engineer and then Senior Control Engineer. Main responsibilities included design, configuration, installation, testing and commissioning of ABB control and automation products such Distributed Control System (DCS), Supervisory Control and Data Acquisition System (SCADA), Emergency Shutdown System (ESD), Information Management System (IMS) and field instrumentation. In addition, participated in pre-sales support, proposal preparation and project planning. Furthermore, conducted training for customers for various ABB control and automation products and played a key role in coordination and resolving issues between ABB and consultants, main contractors and subcontractors.

With Cegelec (Comsip Al'Aali) worked as instrument technician. My responsibilities included selection, installation, testing and commissioning of field instrumentation for different plants and facilities i.e. Bapco, Alba, Ministry of Electricity and Water.

Instruments Technician à Ceglelec
  • Bahreïn - Manama
  • janvier 1991 à décembre 1993

1990 - 1993 Ceglelec (Comsip Al' Aali)
Instruments Technician

Aluminum Bahrain (Alba) - Carbon Plant Project, Bahrain: Supply, install and commission of field instruments. Participated in the installation, configuration and commissioning of field instruments.

Bahrain Petroleum Company (Bapco) - Bahrain: Service Contract for the refinery unit, the main responsibilities included installation, calibration, testing and commissioning of the field instruments and control valves.

Ministry of Electricity and Water, Bahrain: Service Contracts for various water stations, the main responsibilities included installation, calibration, testing and commissioning of the field instruments.


Training Record
MBA Modules - Strategic management, financial management, operation management, project management, human resources management, risk management, managerial economics, information management system, managing change, marketing strategy, maintenance strategy, organizational behaviour, sales and selling, final project (Balance Scorecard for Design and Engineering Business Unit)

Fundamental of Project Management - consists of eight modules covers bidding management, project financial management, time management, scope management, procurement management, quality management, client management, and risk management - Atkins, Kingdom of Bahrain.

Tendering and Procurement Practices - Bahrain Society of Engineers, Kingdom of Bahrain.

Distributed Control System: * A330 ADVANT 400/MP200 Configuration & Operation, ABB Columbus, Ohio, USA.
* A350 ADVANT Operation Station Configuration & Operation, ABB Columbus, Ohio, USA.
* A360 ABB Master Advanced Configuration & Operation, ABB Columbus, Ohio, USA.
* B415 MOD 300 System Eng. AC460 Controller Operation & Configuration, ABB Automation, Bahrain.

Emergency Shutdown System: * A390 Safeguard 400 Series Configuration & Operation, ABB Industri, Oslo, Norway.
* Trusted Safeguard Configuration and Operation, ICS Triplex, Houston, USA.
* Regent and Regent Plus Safeguard Configuration and Operation, ICS Triplex, Houston, USA.

Management System: * IMS Information Management System, ABB Automation, Bahrain.

Instrumentation: * Industrial Process Control, GulfMatech, Bahrain;
* Industrial Process Measurement and Instrumentation, GulfMatech, Bahrain.

Others: * Have a good background in Microsoft Project.
* Oracle and PL/SQL, Al Moayyed International Group, Bahrain.

Éducation

Master, Business Administration
  • à Manchester Business School
  • juin 2011

Specialties & Skills

CONTRACTS
ENGINEER
INSTRUMENTATION
MARKETING
PROJECT MANAGER
TESTING
TRAINING

Adhésions

The Institution of Measurement and Control - UK
  • Member
  • January 1996
Project Management Institute - USA
  • Member
  • January 2007