Mohamed Alganainy , Project Manager

Mohamed Alganainy

Project Manager

ARABIAN BEMCO CONTRACTING- CO

Location
Saudi Arabia - Riyadh
Education
High school or equivalent,
Experience
17 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 9 Months

Project Manager at ARABIAN BEMCO CONTRACTING- CO
  • My current job since April 2019

for pp10 combined cycle project.



Main Achievements:

•Excellent mechanical skills working style in adherence to tight time schedule.
•Technically demanding environments and in concord to project contract specification.
•Worked on major Power Plant Projects includes installation of gas turbine, HRSG, steam turbine, boilers and related auxiliary Units.
•Versifiedwith all aspects of BOP, Commissioning, O&Mand for all mechanical equipment.
•Proficient in Thermodynamic charts, Steam table, Heat and Mass Balances, Flow Diagrams, P&ID, pipe line calculation and installation.
•Familiar with erection, chemical cleaning procedure, steam blowing and commissioning.
•Managing construction and commissioning activities for static equipment (Tanks, Vessels, Pipelines, etc...) as well as large size rotating equipment such as Pumps and compressors.


Specific area of expertise:

•Project Management skills .
Commissioning, start up and operation for:
•Gas turbine (GE FRAME (9E, 7FA, 7E and MITSUBISHI FRAME M701F).
•Heat recovery steam generator HRSG system of NEM, DOOSAN, CMI.
•Steam turbine of GE SC4, D11 and ANSALDO.
•MSF(multi stage flash desalination).
•WWN, Waste water neutralization plant.
•Demineralization and hypo chlorination plant units.
•Hands-on and supervision of all installation aspects for pre-commissioning and commissioning activities in accordance to works schedule, manpower and resources.
•Support all Commissioning Managers and site personnel leading in pursuit to site, corporate policies, Safety Regulationsand local Authorities and standards.

Personal Characteristic

•Reliable and well organized, with good experience and a common sense of approach.
•Ability to organize and motivate a team of different discipline under time pressure.

Project Manager at ARABIAN BEMCO CONTRACTING- CO
  • December 2012 to April 2019

Project management within PP10 combined cycle power plant has the overall responsibility for the installation, commissioning and warranty for combined cycle main component along with the BOP.
• leads and coordinates the work to be done during the installation, commissioning and warranty, and ensures the that the proper resources are allocated to the project and supports and coordinates the site team as well as the team from head quarter (HQ) with site related matters, such as local purchasing, coordination of contractors and suppliers etc.
•From start of warranty (PAC) until end (FAC) the PM is responsible for handling warranty topics both internally as well as in close cooperation with the customer.
Ensure a clear and close dialogue with the customer
•Handling and follow up on warranty issues with customer and HQ.
•point of contact for the customer, site personnel, HQ as well as the customer during Installation and commissioning phase
•Coordinating the warranty activities on site
•responsible for the manpower plan and coordination with customer and HQ
•Follow up site progress.
•Support the site personnel with the necessary visas and work permits
•Analyze risks and possibilities within the projects
•Contribute to the project handover to Service organization

at Kharafinational
  • United Arab Emirates
  • March 2011 to December 2012

a- Damiettasimple cycle power plant (4*125 MW)Gas turbine GE frame 9E.

b- WestDamietta simple cycle power plant (4*125 MW) Gas turbine GE frame9E.


•Title: commissioning and start up engineer.

•Duties: commissioning and start up for simple cycle power plant.

Responsible for:


•Commissioning and start up for 8 GT (GE frame 9E).
•Commissioning and start up for BOP(demin water plant, fire fighting system) .




3- Employer: middle delta electricity Production Company

operation engineer
  • June 2009 to February 2011

ELATF combined cycle power plant (750 MW), (2*2*1).

-The plant consists of 1 block has 2 GT (MHI Frame M701F),
2HRSG (NEM )and 1 STG (ANSALDO).

•Title: commissioning, start upand

operation engineer at middle delta electricity Production Company
  • Egypt
  • January 2005 to January 2009

a-ELMahmodia combined cycle power plant (300) MW.2 (4*4*1).
-The plant consists of 2 blocks each block has 4 GT (GE LM2500).
4 HRSG dual pressure (NEM )and 1 STG (GE).

•Title: combined cycle

Education

High school or equivalent,
  • at Alexandria University
  • August 2020

,

Bachelor's degree, Mechanical Engineering
  • at Faculty of Engineering
  • August 2020

Department :

High school or equivalent, Mechanical Engineering
  • at Faculty of Engineering
  • June 2003

Date :

Specialties & Skills

Operation
Commissioning
ENGINEERING
FRAMING
PERSONNEL
PROGRESS
PROJECT MANAGEMENT
PURCHASING
APPROACH
MANAGEMENT

Languages

Arabic
Expert
English
Expert

Training and Certifications

PMI-BUSINESS CONTINUTY (Certificate)
Date Attended:
March 2020
SIX SIGMA GREEN BELT SSGB (Certificate)
Date Attended:
April 2020
PMP (Certificate)
Date Attended:
May 2020