محمد أمين, MICROTUNNELING CROSSINGS MANAGER

محمد أمين

MICROTUNNELING CROSSINGS MANAGER

Thrust boring Construction Company Ltd. – Tamimi Group (TCC)

البلد
المملكة العربية السعودية - الدمام
التعليم
بكالوريوس, Production Engineering Department
الخبرات
18 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 0 أشهر

MICROTUNNELING CROSSINGS MANAGER في Thrust boring Construction Company Ltd. – Tamimi Group (TCC)
  • المملكة العربية السعودية - الرياض
  • أغسطس 2019 إلى أغسطس 2020

• Participating in all Clients/Partners construction coordination meetings related to Microtunneling activities on
The CM/Senior control levels.
• Leading a construction team of two Superintendents, four site Engineers, six Supervisor, two de-watering
Formans, three surveyors and their subs.
• Assuring adequately timed material supply to site through proper look ahead and communication
Between both internal departments and procurement department, review procurement packages with full co-
ordination & co-operation with the procurement manager.
• Cost monitoring through productivity rate calculations and quantity surveys, productivity VS cost.
• Schedule follow up and updating according to site conditions & man power performance monitoring.
• Quantity reporting to project control.
• Detailing look-ahead schedules for closely upcoming activities every three weeks and passing
On Detailed and clear instructions for preparations to subordinates.
• Assuring internal co-operation & co-ordination between subordinates in the whole discipline, full co-
ordination & control of projects activities, full co-ordination with Main-contractors to meet the projects
requirements in the whole projects areas with other disciplines, site liaison with the client, consultant.
• Assuring proper Procedures and Tool /equipment usage with full co-operation with the client managers and
consultants, as per each owner standard and specifications.
• Assuring safety awareness of subordinates through daily and weekly toolbox Meetings with full co-
operation with HSE manager.
• Responsible for assisting the assigned projects site engineers and their subs with the Execution of project in
accordance with a valid, executed contract, per company policies and Procedures and more instructions for
customized & standardized plants.
• charge all Microtunneling activities and supervision of working force & man power.
• Covering projects areas of Microtunneling activities installation activities and material expediting.
• planning & preparation of work packages & estimates all work schedules include material control, man
power requirements and Equipments requirements for Microtunneling activities on site with full co-operation
and co-ordination with the planning-cost control engineer.
• prepare and update data as a progress monitoring system like curves and sheets for Microtunneling
activities.

Construction Scope Includes
The Microtunneling projects located in the different kingdom cities, with a budget of different values for the infrastructure mega projects (TCC Scope). The Engineering /Procurement department are a (TCC) and the clients are different such as RC, ARAMCO and SWCC, NWC.
The scope of work for TCC CO. includes Microtunneling, shaft execution and insertion internal pipeline.

CONSTRUCTION AREA MANAGER في National Building Company (NBC)
  • المملكة العربية السعودية - الشرقية
  • سبتمبر 2018 إلى يوليو 2019

• Participating in all Client/Partner construction coordination meetings on The CM/Senior control levels.
• Leading a construction team of three Superintendents, two Field Engineers, one General Forman, two
Supervisor, four surveyors and their subs.
• Assuring adequately timed material supply to site through proper look ahead and communication
Between both internal departments and procurement department, review procurement packages with full co-
ordination & co-operation with the procurement manager.
• Cost monitoring through productivity rate calculations and quantity surveys, productivity VS cost.
• Schedule follow up and updating according to site conditions & man power performance monitoring.
• Quantity reporting to project control.
• Detailing look-ahead schedules for closely upcoming activities every three weeks and passing
On Detailed and clear instructions for preparations to subordinates.
• Assuring internal co-operation & co-ordination between subordinates in the whole disciplines, full co-
ordination & control of project activities, full co-ordination with sub-contractors to meet the project
requirements in the whole project areas with other disciplines, site liaison with the client, consultant.
• Quality monitoring through pre-release inspections and assuring proper Procedures and Tool /equipment
usage with full co-operation with the QA/QC manager, as per ARAMCO standard and specifications.
• Assuring safety awareness of subordinates through daily and weekly toolbox Meetings with full co-
operation with HSE manager.
• Responsible for assisting the assigned project Field & QC engineers and their subs with the
Execution of project in accordance with a valid, executed contract, per company policies and
Procedures and more instructions for customized & standardized plants.
• charge all construction activities, skids, valves and site preparation, connection pipeline and Tie-in, civil works
and flare, fence and supervision of working force & man power.
• Covering project areas of construction activities, skids, valves and site preparation, connection pipeline and
civil works and flare, fence. Complete all tie-ins between different systems and exist gas well or remote
header, vendor packages, final punch list to releasing for testing through clear all out standings punch items
till testing & Pre-commissioning, installation activities and material expediting.
• planning & preparation of work packages & estimates all work schedules include material control, man
power requirements and Equipments requirements for construction activities, skids, valves and site
preparation, connection pipeline and Tie-in, civil works and flare, fence on site with full co-operation and co-
ordination with the planning-cost control engineer.
• prepare and update data as a progress monitoring system like curves and sheets for construction activities,
skids, valves and site preparation, connection pipeline and Tie-in, civil works and flare, fence.

Construction Scope Includes
Four gas-wells construction project is located in Haradh city, with a budget of 22 million SR for the construction of the gas well from the charismas valve to the tie-in connection ( NBC scope ). The Engineering /Procurement department are a (Main contractor NESMA) and the client is ARAMCO co.
The scope of work for NBC CO. includes earth works, installation of skids, valves and site preparation, connection pipeline and civil works and flare, fence.

CONSTRUCTION MANAGER (PRIMARY INFRASTRUCTIRE FOR INDUSTRIAL AREA) في FMSCO CO.(SUBDIVISION AND DEVELOPMENT OF INDUSTRIAL ZONE–PHASE 1) RAS AL KHAIR Industrial City - ROY
  • المملكة العربية السعودية - الجبيل
  • أكتوبر 2015 إلى أغسطس 2018

• Participating in all Client/Partner construction coordination meetings on The CM/Senior control levels.
• Leading a construction team of five Superintendents, fourteen Field Engineers, three General Formans, seven
Supervisor, two de-watering Formans, six surveyors and their subs.
• Assuring adequately timed material supply to site through proper look ahead and communication
Between both internal departments and procurement department, review procurement packages with full co-
ordination & co-operation with the procurement manager.
• Cost monitoring through productivity rate calculations and quantity surveys, productivity VS cost.
• Schedule follow up and updating according to site conditions & man power performance monitoring.
• Quantity reporting to project control.
• Detailing look-ahead schedules for closely upcoming activities every three weeks and passing
On Detailed and clear instructions for preparations to subordinates.
• Assuring internal co-operation & co-ordination between subordinates in the whole disciplines, full co-
ordination & control of project activities, full co-ordination with sub-contractors to meet the project
requirements in the whole project areas with other disciplines, site liaison with the client, consultant.
• Quality monitoring through pre-release inspections and assuring proper Procedures and Tool /equipment
usage with full co-operation with the QA/QC manager, as per RC standard and specifications.
• Assuring safety awareness of subordinates through daily and weekly toolbox Meetings with full co-
operation with HSE manager.
• Responsible for assisting the assigned project Field & QC engineers and their subs with the
Execution of project in accordance with a valid, executed contract, per company policies and
Procedures and more instructions for customized & standardized plants.
• charge all infrastructure activities, buildings, tanks, roads and supervision of working force & man power.
• Covering project areas of infrastructure activities, buildings, tanks, roads. Complete all tie-ins between
different systems and exist valve chambers, vendor packages, final punch list to releasing for testing through
clear all out standings punch items till testing & Pre-commissioning, installation activities and material
expediting.
• planning & preparation of work packages & estimates all work schedules include material control, man
power requirements and Equipments requirements for infrastructure activities, buildings, tanks, roads on site
with full co-operation and co-ordination with the planning-cost control engineer.
• prepare and update data as a progress monitoring system like curves and sheets for infrastructure activities,
buildings, tanks, roads.

Construction Scope Includes
The Subdivision and Development of Industrial Zone - phase 1 project is located in RAS AL KHAIR industrial city, with a budget of 307 million SR for the primary infrastructure & construction phase (FMSCO Scope). The Engineering /Procurement department are a (FMSCO) and the client is ROYAL COMMISSION IN JUBAIL.
The scope of work for FMSCO CO. includes earth works, roads network, storm water system and catch basin, potable process & fire water distribution system, sanitary waste water system and manholes, industrial waste water system and manholes, electrical power distribution system, street and area lighting system, telecommunication system, pumping station building and concrete works, lift station structures, HVAC works, generator buildings.

MECHANICAL SUPERINTENDANT (MECHANICAL - INFRASTRUCTURE) في AL SHALAWI CO.(DEVELOPMENT OF BUFFER ZONE PROJECT) AL JUBAIL Industrial City – ROYAL COMMISSION- SAU
  • المملكة العربية السعودية - الجبيل
  • سبتمبر 2014 إلى سبتمبر 2015

• Participating in all Client/Partner construction coordination meetings on The CM/Senior control levels.
• Leading a construction team of two Field Engineers, one Mechanical QC engineer, one General Forman, one Supervisor, one de-watering Forman, one surveyor and their subs.
• Assuring adequately timed material supply to site through proper look ahead and communication
Between both internal departments and procurement department, review procurement package.
• Cost monitoring through productivity rate calculations and quantity surveys, productivity VS cost.
• Schedule follow up and updating according to site conditions & man power performance monitoring.
• Quantity reporting to project control.
• Detailing look-ahead schedules for closely upcoming activities every three weeks and passing
On Detailed and clear instructions for preparations to subordinates.
• Assuring internal coordination between subordinates, full co-ordination & control of project activities, full co-ordination with sub-contractors to meet the project requirements in north zone & south zone with other disciplines, site liaison with the client.
• Quality monitoring through pre-release inspections and assuring proper Procedures and
Tool/equipment usage, as per RC standard and specifications.
• Assuring safety awareness of subordinates through daily and weekly toolbox Meetings.
• Responsible for assisting the assigned project Field & QC engineers and their subs with the
Execution of project in accordance with a valid, executed contract, per company policies and
Procedures and more instructions for customized & standardized plants.
• charge all infrastructure piping installation activities and supervision of working force & man power.
• Covering the north zone and south zone activities of infrastructure piping installation include pipes field run (fit-up, lamination, lifting, cleaning, tightening, required excavation, pipe supports in the lift stations, fitting material( UPVC, DI, GRE, GRP). Complete all tie-ins between different systems and exist valve chambers, vendor packages, final punch list to releasing for testing through clear all out standings punch items till testing & Pre-commissioning, installation activities and material expediting.
• planning & preparation of piping jobs estimates all work schedules include material control, man power requirements and Equipments requirements For infrastructure piping installation activities on site.
• prepare and update data as a progress monitoring system like curves and sheets for infrastructure piping installation activities.

Construction Scope Includes
Installation of infrastructure piping systems (UPVC, DI, FRP, RTRP and others).
Pipe diameter size range (25 mm: 1200 mm)
The Development of Buffer Zone project is the first show room in jubail industrial city, with a budget of 96 million SR for the primary construction phase (Al Shalawi Scope). The Engineering /Procurement department are a (Al Shalawi) and the client is ROYAL COMMISSION.
The scope of work for AL SHALAWI CO. includes sanitary system, lift station, storm system, potable water system, irrigation system.

COMPANY OWNER & MANAGER ( FREE WORK ) في AL AMIN CONTRACTING COMPANY
  • مصر - الإسكندرية
  • مارس 2014 إلى سبتمبر 2014

( INSTALLATION OF UNDERGROUND DEPOSITS COLLECTING SYSTEM REINFORCEMENT CONCRETE CHAMBER )
ALEXANDRIA West Region - MISR PETROLEUM COMPANY - EGYPT
Excavation, Backfilling, Roundness Steel Reinforcement, Wall Concrete Casting, Diving, Ground Concrete Casting, Roof Concrete Casting, Finishing

COMPANY OWNER & MANAGER ( FREE WORK ) في AL AMIN CONTRACTING COMPANY
  • مصر - الإسكندرية
  • أغسطس 2013 إلى مارس 2014

( STEEL STRUCTURE ERECTION, HANDRAIL FABRICATION & FIXATION )
ALEXANDRIA CAIRO DESERT ROAD K56 - ALEXANDRIA FOR SUGAR COMPANY ( THE SAVOLA GROUP ) - EGYPT
180 Ton Steel Structure Erection, 2800 m Handrail Fabrication & Fixation

COMPANY OWNER & MANAGER ( FREE WORK ) في AL AMIN CONTRACTING COMPANY
  • مصر - الإسكندرية
  • أغسطس 2012 إلى أغسطس 2013

( MAINTENANCE OF CRANE BODY & CRACK REPAIR )
ALEXANDRIA West Region - AL EZZ STEEL REBARS ( EZZ STEEL ) - EGYPT
3 Cranes Crack Repair, Sandblasting & Painting

PIPING SECTION ENGINEER (MECHANICAL - PROCESS) في CCC. (Pearl GTL Project) Ras Laffan Industrial City –QATAR Consolidated Contractor International Com
  • قطر - الدوحة
  • أبريل 2008 إلى يوليو 2012

• Participating in all Client/Partner construction coordination meetings on The CM/Senior control levels.
• Leading a construction team of two Senior Engineers, four junior engineers, four Supervisors,
Six foremen and their subs.
• Assuring adequately timed material supply to site through proper look ahead And communication
Between both internal departments and partner procurement.
• Cost monitoring through productivity rate calculations and quantity surveys.
• Schedule follow up and updating according to site conditions & man power performance monitoring.
• Quantity reporting to project control.
• Detailing look-ahead schedules for closely upcoming activities every three weeks and passing
On Detailed and clear instructions for preparations to subordinates.
• Assuring internal coordination between subordinates, full co-ordination & control of project activities
In AC AREA with other disciplines, site liaison with the client.
• Quality monitoring through pre-release inspections and assuring proper Procedures and
Tool/equipment usage.
• Assuring safety awareness of subordinates through daily and weekly toolbox Meetings.
• Responsible for assisting the assigned project Senior & junior engineers and their subs with the
execution of project in accordance with a valid, executed contract, per company policies and
Procedures and more instructions for customized & standardized plants.
• charge all piping erection activities and supervision of working force & man power.
• Covering the AC AREA activities of piping erection include spools field run (fit-up, welding, lifting,
cleaning, tightening, required scaffolding, pipe support on site of one train and it's fingers including
Pipe supports, fitting material. Complete all tie-ins between different trains, vendor packages and final
punch list to releasing for testing through clear all out standings punch items till testing &
Pre-commissioning, installation activities and material expediting.
• planning & preparation of piping jobs estimates all work schedules, man power requirements
For piping erection on site.
• prepare and update data as a progress monitoring system like curves and sheets for piping.
Construction Scope Includes
Installation of 160, 000 Diametric Inch of process pipelines (C.S., S.S., Alloy Steel, Low Temp. and others).
Pipe diameter size range (0.5" : 48")
The Pearl Gas To Liquid (PGTL) project is the hugest LNG project running in the world, with a budget of 1.8 Billion U.S. $ for the construction phase (CCC Scope). The Engineering /Procurement Partner are a (JGC / KBR) - JV. Of JGC Japanese Gas Corporation - Middle East - FZE (Japan) / KBR Kellogg Brown & Root International (USA) and the client is QATAR SHELL GLOBAL SOLUTIONS INTERNATIONAL BV.
The scope of work for CCC includes steel structure, A/G Piping, pipe supports, U/G RTR Piping, electrical / instruments works, Paving / Asphalt Roads, Also includes heavy equipment erection.

SR. SITE PIPING ENGINEER في PETROJET CO.ELAB
  • مصر - الإسكندرية
  • ديسمبر 2006 إلى مارس 2008

• Leading a fabrication & construction team of two junior engineer, two supervisors, four foremen and their subs.
• Assuring adequately timed material supply to site through proper look ahead.
• Schedule follow up and updating according to site conditions.
• Quantity reporting to project control department.
• Assuring internal coordination between subordinates.
• Quality monitoring through pre-release inspections and assuring proper tool/equipment usage.
• Assuring safety awareness of subordinates through daily and weekly toolbox meetings.
• charge all piping fabrication activities and supervision of working force & man power.
• Covering the work shop activities of piping fabrication and pipe support to final paint then
Piping erection on site of two train 80000 ID including pipe supports, fitting material.
• planning & preparation of piping jobs estimates all work schedules, man power requirements for piping fabrication and erection.
• Complete all tie-ins between two trains and main pipe rack train.
• prepare and update data as a progress monitoring system like curves and sheets for piping.

SR. SITE PIPING ENGINEER في PETROJET CO.BADR EL DIN REFINERY
  • مصر - مرسى مطروح
  • أغسطس 2005 إلى ديسمبر 2006

• Leading a construction team of two supervisors, four foremen and them subs.
• Assuring adequately timed material supply to site through proper look ahead.
• Schedule follow up and updating according to site conditions.
• Quantity reporting to project control.
• Assuring internal coordination between subordinates.
• Quality monitoring through pre-release inspections and assuring proper tool/equipment usage.
• Assuring safety awareness of subordinates through weekly toolbox meetings.
• charge all piping fabrication activities and supervision of working force & man power.
• Covering the work shop activities of piping fabrication and pipe support to final paint then
Piping erection on site.
• planning & preparation of piping jobs estimates all work schedules, man power requirements
For piping fabrication and erection.

SITE PIPING ENGINEER في THE PETROLEUM PROJECTS AND TECHNICAL CONSULTATIONS CO. (PETROJET) LNG EDCO.
  • مصر - الإسكندرية
  • أكتوبر 2004 إلى أغسطس 2005

• Leading a construction team of one supervisor, four foreman and their subs.
• charge all piping fabrication activities and supervision of working force & man power.
• Schedule follow up and updating according to site conditions.
• Quantity reporting to project control.
• Covering the work shop activities of piping fabrication and pipe support to final paint.
• Complete all tie-ins between different trains, slippers and vendor packages.
• Quality monitoring through pre-release inspections and assuring proper tool/equipment usage.
• planning & preparation of piping jobs estimates all work schedules, man power requirements
For piping fabrication and erection.
• Assuring safety awareness of subordinates through weekly toolbox meetings.

FAB SHOP MANAGER في DSD CO.FABRICATION OF A COMPLETE BOILER FOR NEM CO.
  • مصر - القاهرة
  • مارس 2004 إلى سبتمبر 2004

• Leading a fabrication team of four fabrication shop junior engineers, three supervisors,
Six foremen and their subs.
• Schedule following up & progress control of all piping activities, man power performance.
• Quantity reporting to DSD production general manager.
• Assuring internal coordination between subordinates.
• Assuring safety awareness of subordinates through daily and weekly toolbox meetings.
• charge all piping fabrication activities and supervision of working force & man power.
• Co-ordination and control of the fabrication shop activities, with other disciplines.
• planning & preparation of piping jobs estimates all work schedules, man power requirements
For piping fabrication.

SHIFT LEAD ENGINEER في LORD INTERNATIONAL CO.
  • مصر - الإسكندرية
  • أغسطس 2003 إلى فبراير 2004

• Leading a fabrication team of three supervisors, six foremen and 80 workers.
• Schedule following up & progress control.
• Quantity reporting to plastic & shaving blades factory manager.
• Assuring internal coordination between subordinates.
• charge all activities in the plastic injection, auto - assembly and extrusion & punching departments.
• Supervision of working force and man power.
• Co-ordination and control of the factory disciplines.
• planning & preparation of production department estimates work schedules per year.

FAB SHOP ENGINEER في DSD CO.( HIRING ) FABRICATION OF BOILER HARBS
  • مصر - القاهرة
  • سبتمبر 2002 إلى يوليو 2003

• Leading a fabrication team of two foremen and their subs of fabricators & grinders.
• Schedule following up & progress control.
• Quantity reporting to fabrication shop manager.
• Assuring internal coordination between subordinates.
• charge all piping fabrication activities & supervision of working force & man power.

الخلفية التعليمية

بكالوريوس, Production Engineering Department
  • في Alexandria University, Faculty of Engineering
  • يونيو 2002

Specialties & Skills

Preparation
Testing
Awareness
Fabrication
 MANAGEMENT SKILLS
 COMPUTER SKILLS

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

• MEMBER OF THE EGYPTIAN WELDING ACADEMY (EWA).
  • MEMBER
  • June 2001