STRUCTURAL ENGINEER
JAWDA ENGINEERING CONSULTANTS - JEC
Total years of experience :10 years, 6 Months
Responsibility:
Perform structural analysis and structural design for power substation.
Analysis of R.C structures using STAAD software & Design of R.C structures using ACI-318 code. Apply wind loads, seismic loads and other necessary loads using ASCE-7, UBC/IBC codes.
Build and review 3D model, coordinate the models with the other disciplines, clash detection, team support and collaboration with the team.
Structural coordination with the other disciplines architectural, electrical and mechanical drawings. Draft structural layout and design details using AutoCAD software.
Prepare and review Design Drawings, calculations, details, technical reports, specifications and submittals.
Update submittals revision and Make the necessary adjustments as per comment letters from contractor and Owner Company.
Projects:
Al-Jawad Substation 110/13.8KV Jeddah, KSA.
Al-Shalal Substation 132/33KV Jeddah, KSA.
Al-Jouhara Substation 132/33KV Jeddah, KSA.
Quwaiza Substation 132/33KV Jeddah, KSA.
BAISHA WEST Substation 110/13.8KV Makkah, KSA.
FARSHA Substation 132/33KV Farsha, KSA.
Responsibility:
Perform structural analysis and structural design for various types of projects including wastewater plant, residential, high-rise and steel works.
Analysis of R.C structures using Etabs, Sap and Safe software & Design of R.C structures using
ECP-203 code.
Apply wind loads, seismic loads and other necessary loads using ECP-201 code. Draft structural layout and design details using AutoCAD software.
Prepare Design Drawings, calculations, details, technical reports, specifications and submittals to introduce to authorities for permit and carrying the required administrative documents.
Preparing of Bill of Quantities (BOQ).
Projects:
Waste treatment plant Badr City, Egypt.
Residential towers (G+11) Cairo, Egypt. Youth Housing (G+5) New Cairo, Egypt.
Site supervision as a site engineer in different locations for different project. Site supervision, time management, quality control, and cost control. Coordination with contractors to ensure quality of work.
Coordination with consultant office to gain approval for work.
Site reports, inspection materials, labor management and coordination with the head office. Gain experience in site management, construction problem and investment world.
High raise building of 30-floor and frame hall.
Using various construction systems, depending on analysis and design programs. Analysis of R.C structures using Etabs and Safe software & Design of R.C structures using
ECP-203 code.
Apply wind loads, seismic loads and other necessary loads using ECP-201 code. Draft structural layout and design details using AutoCAD software.
Prepare Design Drawings, calculations and details.
Bachelor of Engineering (B.E.), Civil Engineering College of Engineering, Zagazig Graduate degree: Very good