Total Years of Experience: 13 Years, 2 Months
May 2015
To Present
Quality Control Engineer
at Alico Egypt
Location :
Egypt - Cairo
· Project: Grand Egyptian Museum (From 2015 To 2020)
· Job title: Quality control engineer:
(SCHUCO stick Curtain wall system, windows and doors, steel
addon, composite/mesh cladding system)
· Project Duties:
1-preparation of project’s -ITP (Inspection test plan -MST (method statement), ( For all systems such as Stick curtain
walls, hinged doors and windows, steel addon system …etc.)
2-Reviewing the project’s specifications and
preparing inspection report for each façade inspection
3-Issuing of internal CAR (corrective action report) and dealing
with external CARs issued from the main contractor
4-inspection of all incoming material ensuring that all incoming
materials quality is according to shop drawings and
projects specifications.
5-Inspecting and evaluating the erected Façade
, windows, doors louvres parts Ensuring its structural, functional
and visual integrity according to Related the project’s
specifications, related standards and codes, technical notes
and drawings
6-Ensuring that the Snag list of the project is done and approved
by the main contractor and the consultant
II-Job title: QA/QC team leader (From 2020 To Current)’
Project: Multiple projects (Such as ZED Towers
, army stadium, post office, central bank, Borg Al-Arab airport
(SCHUCO stick and unitized curtain wall system, SCHUCO hinged
, sliding, windows and doors )
(Wicona stick curtain wall, hinged windows and doors )
(Multiple cladding systems)
1-Leading a team of quality Engineers and
supervisors overlooking all the company’s projects.
2-Studying each project’s Specification to deduce the Client’s
requirements and determine the critical issues that might
affect the project, examples such as :
Required fields tests ( Water, Air, weather silicone tests, …etc. )
3-Developing the Quality procedures and Quality plans for the
company in general For All Quality activities.
4-Making sure that the quality team in each project is on the
correct track and applying the rules of the procedures, ensuring
that the Quality role in the project is effective
5-Preparing the require inspection and Testing Plans (ITP) and
Method statement (MST) For unitized system, stick system
, louvres, Cladding, doors and windows and every related item to
the scope of the project
6- Making sure that NCRs received are investigated and
corrected as soon as possible, and making sure to have a lesson
learned from that report
7-Issuing internal Site Observations report (SOR) Internal Non-
Conformity reports (NCR ), Site incident Reports (SIR) all as
internal documents to the site Managers and Site Engineers
when needed.
8-feedback analysis of projects issues (internal/External NCRs, Site
observations, feedback reports…etc.)
9-creating risk assessment plan for the quality activities
· Job title: Quality control engineer:
(SCHUCO stick Curtain wall system, windows and doors, steel
addon, composite/mesh cladding system)
· Project Duties:
1-preparation of project’s -ITP (Inspection test plan -MST (method statement), ( For all systems such as Stick curtain
walls, hinged doors and windows, steel addon system …etc.)
2-Reviewing the project’s specifications and
preparing inspection report for each façade inspection
3-Issuing of internal CAR (corrective action report) and dealing
with external CARs issued from the main contractor
4-inspection of all incoming material ensuring that all incoming
materials quality is according to shop drawings and
projects specifications.
5-Inspecting and evaluating the erected Façade
, windows, doors louvres parts Ensuring its structural, functional
and visual integrity according to Related the project’s
specifications, related standards and codes, technical notes
and drawings
6-Ensuring that the Snag list of the project is done and approved
by the main contractor and the consultant
II-Job title: QA/QC team leader (From 2020 To Current)’
Project: Multiple projects (Such as ZED Towers
, army stadium, post office, central bank, Borg Al-Arab airport
(SCHUCO stick and unitized curtain wall system, SCHUCO hinged
, sliding, windows and doors )
(Wicona stick curtain wall, hinged windows and doors )
(Multiple cladding systems)
1-Leading a team of quality Engineers and
supervisors overlooking all the company’s projects.
2-Studying each project’s Specification to deduce the Client’s
requirements and determine the critical issues that might
affect the project, examples such as :
Required fields tests ( Water, Air, weather silicone tests, …etc. )
3-Developing the Quality procedures and Quality plans for the
company in general For All Quality activities.
4-Making sure that the quality team in each project is on the
correct track and applying the rules of the procedures, ensuring
that the Quality role in the project is effective
5-Preparing the require inspection and Testing Plans (ITP) and
Method statement (MST) For unitized system, stick system
, louvres, Cladding, doors and windows and every related item to
the scope of the project
6- Making sure that NCRs received are investigated and
corrected as soon as possible, and making sure to have a lesson
learned from that report
7-Issuing internal Site Observations report (SOR) Internal Non-
Conformity reports (NCR ), Site incident Reports (SIR) all as
internal documents to the site Managers and Site Engineers
when needed.
8-feedback analysis of projects issues (internal/External NCRs, Site
observations, feedback reports…etc.)
9-creating risk assessment plan for the quality activities
May 2013
To April 2015
Process Quality Engineer
at frank noe
Location :
Egypt - Cairo
Maintaining the QMS system according to ISO 9001
-Conducting internal audits
-Conducting internal trainings-
-improve the company current procedures and work instructions to get an adequate measuring result that would be useful for improvement purposes
-improve the current sampling technique for incoming material and product sampling methods
-applying risk principles and plan to eliminate associated risks to processes by taking the required corrective and preventive actions
-Conducting internal audits
-Conducting internal trainings-
-improve the company current procedures and work instructions to get an adequate measuring result that would be useful for improvement purposes
-improve the current sampling technique for incoming material and product sampling methods
-applying risk principles and plan to eliminate associated risks to processes by taking the required corrective and preventive actions
January 2011
To May 2013
Site Engineer
at Petrojet
Location :
Egypt
Project Name: BADR /EL TEBBIN PUMPING AND STORAGE TERMINAL
Location: BADR CITY - EGYPT
Duties in the Project:
-the supervision over the construction & erection work of 2 diesel tanks and 1 kerosene tank and the connecting piping network between them
-making sure the quality level of the works is above the acceptable level according the specifications of the American code API 650
Location: BADR CITY - EGYPT
Duties in the Project:
-the supervision over the construction & erection work of 2 diesel tanks and 1 kerosene tank and the connecting piping network between them
-making sure the quality level of the works is above the acceptable level according the specifications of the American code API 650
Share on Facebook
Share on Twitter
Share Via Email