محمد بدر, Senior Testing, commissioning and startup electrical engineer

محمد بدر

Senior Testing, commissioning and startup electrical engineer

arabian bemco contracting company l.t.d.

البلد
مصر - الإسكندرية
التعليم
بكالوريوس, هندسة كهربية "اتصالات والكترونيات"
الخبرات
21 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 0 أشهر

Senior Testing, commissioning and startup electrical engineer في arabian bemco contracting company l.t.d.
  • المملكة العربية السعودية - جدة
  • أشغل هذه الوظيفة منذ فبراير 2007

Complete testing, commissioning and start up for extra high voltage substations and power plants" steam and gas turbine "

1. Substation, Power plant Main and back up protection different manufacturers (i.e. Siemens, ABB, Areva, GE ):-
- Line differential Relay ( SIEMENS 7SD522, 7SD610)
, (ABB RADHL)
- Distance Relay (SIEMENS 7SA522 ), (ABB REL 511, REL 316, RAZAW) (AREVA MICOM P442, P441 Micromoho & optimoho)
- Transformer differential Relay
(SIEMENS 7UT612, 7UT613, 7UT511)(ABB RADSB, RADHD)
(GE T60) (ALSTOM KBCH20, MCAG 34)
- Generator Protection Relay ( GE G60)
- Breaker Fail Protection Relay (GE C60)(SIEMENS 7SV6001)
- Motor Protection Relay (GE 269 &369& 469)(ABB REM610)
- DOC, DEF relays O/C & E/F relays (SIEMENS 7SJ 600, 601, 621)
(ABB SPAJ 110, 140) (GE MIFIIP, MIFIIN)(AREVA MICOM 127, 122)
2. Scheme checks (M1&M2 protection, backup protection, Synchronizing, breaker fail, Bus bar protection, communication scheme for distance relays, DC system, Interlocks, inter trip, ATS scheme.
3. Generator Protection Panel manufacturer GE, Exciter Field Panels.
4. Inter face between generator switch gear and Generator protection panel and inter trip panel and cross trip panel and mark 6 panels.
5. Overall Stability for” bus bar, REF, Generator, step up/ down transformer”
6. Synchronizing of the Turbine to the Grid and Starting up of Turbine and reverse power test.
7. Testing Mimic, Annunciation, metering, load shedding, AVR Panels.
8 LV, MV, HV, EHV convention and GIS switch gear ”C.T, V.T, isolators, GIB and C.B “
High voltage test, Contact resistance, function check, interlocks, Timing for C.B.
Complete testing all type of C.T, V.T, surge arrestor

Protection engineer في Egyptian Electricity Transmission Company
  • مصر - الإسكندرية
  • مايو 2003 إلى فبراير 2007

I worked in Middle Zone of Alexandria which contains important load and Industrials load .this zone contain big four substation 220/66 K.V and twelve substation 66/11 K. v
1- Design and maintenance the Control circuit of operation of all Power system devices such as “Isolating Switches -Circuit Breaker -motors “for different manufacturer such as ABB, SIEMENS, ALSTOM, Schneider.
2- Testing, programming, maintenance and making detail commissioning on most of protection different Relays manufacturer such as ABB, SIEMENS, ALSTOM, SEL, GE
3- Protection and control of POWER TRANSFORMER for different voltage Level and rating
4- Fault analysis by taking the data from Fault Recorder and studying the working of protection relays in this fault ok or not and if not ok we studying the defective in the relay or in the setting of the relay .
5- Making routine program on this substation and complete testing protection relay in this program.
6- Renew old protection relay electromechanical with digital protection relay

الخلفية التعليمية

بكالوريوس, هندسة كهربية "اتصالات والكترونيات"
  • في كلية الهندسة
  • يوليو 2002

Specialties & Skills

Maintenance Engineering
Testing
Electrical Engineering
2. Scheme checks (M1&M2 protection, backup protection, Synchronizing , breaker fail, Bus bar protect
8. Live H.V Substations: - Renew old protection relays with digital protection relay and made all mo
1. Substation, Power plant Main and back up protection different manufacturers (i.e. Siemens, ABB,
3.Generator Protection Panel manufacturer GE, Exciter Field Panels
4.Inter face between generator switch gear and Generator protection panel and inter trip panel and
5.Overall Stability for” bus bar, REF, Generator, step up/ down transformer”
6.Synchronizing of the Turbine to the Grid and Starting up of Turbine and reverse power test.
7.Testing Mimic, Annunciation, metering, load shedding, AVR Panels
9.LV,MV,HV,EHV convention and GIS switch gear ”C.T,V.T , isolators, GIB and C.B “  High voltage

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الفرنسية
مبتدئ

التدريب و الشهادات

Control circuits & Diagrams for Substations (تدريب)
معهد التدريب:
Network Training Center
تاريخ الدورة:
August 2004
Driving & Protection for Electric Machines. (تدريب)
معهد التدريب:
Network Training Center
تاريخ الدورة:
January 2004
Protection Fundamental (تدريب)
معهد التدريب:
Network Training Center
تاريخ الدورة:
March 2004
Transformer protection. (تدريب)
معهد التدريب:
Network Training Center
تاريخ الدورة:
April 2004
Instrument Transformers & Power Measurement (تدريب)
معهد التدريب:
Network Training Center
تاريخ الدورة:
February 2004
Feeder Protection (تدريب)
معهد التدريب:
Network Training Center
تاريخ الدورة:
October 2004
ELECTRIC MACHINE CONTROL (تدريب)
معهد التدريب:
DON BOSCO INSTITUE
تاريخ الدورة:
July 2004
AutoCAD2000 2D (تدريب)
معهد التدريب:
Arab Academy for Science & Technology:
تاريخ الدورة:
March 2001
Digital Distance over current Relay Micom P442 (تدريب)
معهد التدريب:
Network Training Center
تاريخ الدورة:
January 2005