Quality Control Manager and R&D assistant
NCC X-CALIBURE for construction chemistry
Total years of experience :14 years, 4 Months
1- Analysis of the raw material before it enters the factory
2- follow the admixture products in production department and improve admixture products if found any defect on it by making physical tests on admixture products (PH - Specific Gravity- solid content - ash content) then test it on concrete (slump test- air content - initial and final setting time -compressive strength) then improve the quality of products as R&D assistant by increasing or decreasing raw materials or add new raw materials to it.
3- follow the construction production and improve the product if found any defect on it by making physical tests on powder construction products (color - density- sieve analysis - slump test of mortar- initial & final setting time -flow test - air content - compressive strength) and liquid construction products (PH - specific gravity - interaction with their powder construction products) then improve the quality of products as R&D assistant
4- follow the epoxy production and making physical tests on it (color - density- fineness - pot life - covering -open time )
5- follow ISO 9001 and BS OHSAS 18001.
6- make tests with helping of two clever lab technicians
1- complete run of chemical analysis for raw materials and final processing products of
(construction department, epoxy department and admixture department) according to chemical
standard specification that special for every test.
2- making tests on concrete
3- make ISO reports for all products (raw materials and final products).
4- assist in development of company products
1- follow production lines by helping of 8 clever veterinarians.
2- follow HACCP plan (Hazard Analysis Critical Control Point).
3- make ISO reports for all products (raw materials and final products).
4- follow pest control.
5- follow the quality of detergent for cleaning and sanitation.
6- follow chemistry and microbiology laboratory results.
7- follow boilers and cooling towers results.
8- follow machines checking after work ending.
9- get ISO 22000 in 1/2014
1- follow chemical and biology laboratory results
2- made reports for purity of all machines in company every weak
3- follow detergents for cleaning factory after work end
4- follow detergents used in sanitation
5- get Iso 22000 in 1/2013
6- follow PEST CONTROL program of Company
7- Water Treatment of Boilers and Cooling Towers
A- daily measuring (T.D.S - PH - Hardness) for water in cooling towers, boilers, softener and
feed tank.
B- weekly sanitation period for cooling towers avoiding bacterial growth.
C- adding chemicals to Boilers and Cooling Towers
1-complete run of biological analysis for raw meats and final processing meats products according
to biological standard specification that special for every test.
2- complete run biological analysis for water that is used in processing for assure that it actionable
for human used.
3- regular complete run of biological wipes for instrument and tools and different surfaces in the
factory for assure of the quality and affective of detergent that used for cleaning of factory.
1- complete run of chemical analysis for raw meats and final processing meats products according
to chemical standard specification that special for every test.
2- determination of percentage of impurities in raw salt with each new patch
3- daily making soap that is used for cleaning instrument, tools and surfaces of company
some protecting coating compositions for industrial applications for corrosion, fire retarding and antimicrobial activity