Mohamed El-Rayyes, Projects Manager

Mohamed El-Rayyes

Projects Manager

Al Reem Marble and Granite L.L.C.

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, Architectural Engineering and environmental design
Expérience
17 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 8 Mois

Projects Manager à Al Reem Marble and Granite L.L.C.
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis juin 2014

Projects Managed and successfully delivered: JBR Enhancement Project, The Opus, The Address Boulevard, Mudon Villas

Ongoing Projects: Al Maryah Central (AD), ICD Project

Tasks and Duties

• Direct reporting to the Managing Director
• Attend on site meetings with the main contractor & project management to discuss and resolve site problems
• Coordinate with consultant in all technical issues
• Revise execution drawing prior to submittal
• Managing different sub-contractors to achieve high progress of works
• Technical coordination with design team to solve site issues
• Building paper work system to achieve adequate work progress
• Manage and coordinate between different company departments and ensure proper team communication
• Assign tasks to team members as per project requirements
• Coordinate with client representative to ensure that changes/variations/additions are understood and approved before implementation
• Ensure project meets internal and client expectation with respect to quality, budget and delivery time lines

Project Engineer à Depa Dubai
  • Émirats Arabes Unis - Dubaï
  • décembre 2013 à juin 2014

DUG New head office at Vision tower

* Direct reporting to the project Director
* Handling Fit-out works for Depa United Group’s new head office in business bay area
* Managing different sub-contractors to achieve high progress of works
* Technical coordination with design team to solve site issues
* Coordination with facility management, property control and authorities for permits, submittals and inspections

Project Engineer à Depa Interiors
  • Émirats Arabes Unis - Dubaï
  • juin 2013 à décembre 2013

• Direct reporting to both the project Director of the project
• Key person in handling project management and coordination
• Attend weekly progress meeting with project management, consultant and client
• Personally handled mock-ups execution to explore possible problems and set works criteria
• Organized manpower (80 workers) sequence of works to accommodate the tight 2 week/floor program of units completion
• Coordination with QA/QC team for raising inspections as per handover schedule
• Effective management of site team to maintain highest productivity
• Manage sub-contractor material deliveries and execution of works
• Signing off finished floors with project consultant and Hotel operator

Project Engineer à Depa interiors
  • Émirats Arabes Unis - Dubaï
  • novembre 2011 à mai 2013

• Direct reporting to both the Sr. Construction Manager and project Director of the project
• Responsibility of the fit-out works snagging stage of the hotel rooms (453 deluxe rooms & 68 Suites) and offices (15 floors) to handover to project client
• Responsible for spa execution from beginning to end
• Coordinating between all entities involved in spa complicated execution works
• Active coordination with MEP contractor to solve all site issues promptly and efficiently
• Managing sub-contractors to push material delivery and installation
• Coordination with design team for developing technical details
• Coordination with QA/QC team for raising inspections as per handover schedule
• Preparing project progress reports
• Setting out fast track sequence of work to outcome highest progress in least possible time frame
• Supervision on quality assurance

Project Engineer à Depa Interiors
  • Émirats Arabes Unis - Abu Dhabi
  • septembre 2011 à octobre 2011

Direct reporting to both the Sr. Construction Manager and Construction Manager
of the project
• Responsible for Fit-out works in the Low Rise Building of the project which
included a Reception area and café, a Spa with toilets & lockers, a Female Gym
with toilet and lockers, a Male gym and a Nursery
• Active coordination with main contractor and sub-contractors to push progress of
works
• Attended daily meetings with main contractor to sort site issues and develop
solutions to expedite site works
• Supervision on sequence of work
• Supervision on quality assurance

Site Engineer/ Snagging manager à Depa Dubai/ Depa Morocco
  • Maroc - El Jadida
  • juin 2010 à juillet 2011

Nominated from Depa Dubai to Depa Maroc for final handing over of the project to the
client, performed the following:
• Direct reporting to the General Manager (GM) of Depa maroc and Quality Director of
Depa Dubai
• Arrived to project in skeleton phase of villas
• Active coordination between all sub-contractors (Structure, Water proofing, MEP,
Marble, Gypsum ceiling, Painting, Joinery and Landscaping)
• Designed and Developed turning point and efficient water-proofing details to solve
complicated issues caused by the heavy rainy weather of the country to 6 different
types of villas Designs
• Drove and set sequence and work criteria for the Snagging process for 67 Villas with 6
different types
• Supervision on sequence of final works
• Supervision on quality assurance
• Direct coordination with the project client for final handing over of the villas
• Direct coordination with the villas owners for their final comments and handled
maintenance when required

Site Engineer à Depa Dubai
  • Egypte - Le Caire
  • mai 2010 à juin 2010

Nominated from Depa Dubai to Depa Egypt for final handing over of the project to the client
and hotel operator, performed the following:
• Direct reporting to the General Manager (GM) of Depa Egypt
• Coordination with Project Management for team organization & setting sequence &
work criteria
• Active coordination with sub-contractors to deliver project on target date
• Prepared daily work reports and manpower
• Direct coordination with project client for handing over of hotel floors
• Supervision on sequence of final works
• Supervision on quality assurance

Site Engineer à Depa Interiors
  • Émirats Arabes Unis
  • février 2007 à avril 2010

Tallest Man-made Structure in the world

• Responsible for the Fit- Out construction of 44 floors (599 units) in the residential
apartments of the tower
• Coordinate between Fit- Out works and M.E.P works
• Prepare and revise all the drawings related to the floors and mock- up of the
tower
• Report directly to both the Project and Construction Managers on a daily basis
• Monitor and supervise 20 to 50 workers and ensure execution is done correctly
• Prepare paper work required for WIR’s and clearance requests
• Handled responsibilities of the construction manager in his absence
• Proposing and developing details to resolve critical site issues to consultant
• Attend on site meetings with the main contractor & project management to
discuss and resolve site problems
• Responsible for CIR (Consultant Inspection Request) &

CAD Operator à Depa Interiors
  • Émirats Arabes Unis - Dubaï
  • octobre 2006 à janvier 2007

- Preparing the Fit-out shop drawings for apartments, suites and restaurants required for the execution of work on site.
- Discussing with the design manager details and proposing if required.
- Ensuring the submission of drawing as per the schedule.
- Ensuring the submission of drawing with the highest quality.

Site engineer trainee à El Raed for architectural engineering
  • Egypte
  • juillet 2004 à août 2004

- Site Monitoring and observation for concrete work of 2 villas.
- Supervising the submission of work as per the shop drawings.
- Coordinating between Sub Contractors on site.

Éducation

Baccalauréat, Architectural Engineering and environmental design
  • à Arab Academy for Science and Technology
  • juillet 2006

Specialties & Skills

Fast Learning
Communication Strategies
Problem Solving
Coordination
Diplomacy
AutoCAD
Basic First Aid from EUROLINK training division
Adobe: Indesign, Illustrator, & Photoshop
MS Office applications

Langues

Anglais
Expert
Arabe
Expert

Adhésions

Egyptian engineer's syndicate
  • member
  • July 2006