Senior Instruments & Control engineer
AIR LIQUIDE EGYPT
مجموع سنوات الخبرة :7 years, 11 أشهر
AIR LIQUIDE EGYPT 12/09-present
Senior Instruments & Control engineer.
• A multinational company works in air separation unit and petrochemicals which produce a liquid (Oxygen, Nitrogen, Argon, CO2) cryogenic operation, Hydrogen.
• Attend construction work, startup, pre commissioning and commissioning of the plant.
• Issue, Develop and analyze plant maintenance plan in support of the Maintenance Programs & Planning activities.
• Contribute within my frame of work maintenance schedule for Instrument areas and create and follow up machine history logs to predict, sense, analyses or fix problems if any.
• Support the Plant manager and the reliability Center in the planning and execution of major repairs.
• Deal with PLC S7-200, 300, Schneider.
• Deals with SCADA Wincc flexible.
• Atlas Copco compressor (ZR315, ZR355)
• Rectifier unit (16kA&12kA)
• Maintenance and operation of dimenralized water plant.
• Maintenance and operation of N2/H2 mixer.
• Maintenance and operation of APSA T7 unit.
Ataka Power Station, Ministry of Electricity and Power, East Delta Electricity Production Co.
Instruments & Control engineer.
7/06-12/09
• Deal with (DCS) Distributed Control System servers
• \[Database server, (AMS) calibration, (EDB) history, (CSI 4500) vibration.
• OPC interfaces\] based on OVATION System over operating system Microsoft Windows server 2000 supported by Emerson Process Management company.
• Troubleshooting of problems with instruments such as:\[motorized, Electro/Pneumatic, Electro/Hydraulic Valves
• Air Compressors \[IR (C15, C25) \].
International Biomedical Group (IBG) Maintenance engineer. 5/06-6/07
• Repair and maintenance Sirona Biomedical units:
Suez canal University, Port saied, Egypt BSc in electronics and communication. 2003