Mohamed El Solh, Senior Resident Engineer

Mohamed El Solh

Senior Resident Engineer

SDT

البلد
المملكة العربية السعودية
التعليم
ماجستير, Construction Project Management
الخبرات
29 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :29 years, 10 أشهر

Senior Resident Engineer في SDT
  • المملكة العربية السعودية - املج
  • أشغل هذه الوظيفة منذ أبريل 2022

The Desert Rock Resort Project in the Red Sea Projects - Engineering and Supervision Works

Construction Project Manager في Part time works
  • المملكة العربية السعودية - الرياض
  • أكتوبر 2021 إلى أبريل 2022

Part time works in Riyadh and Jeddah

Operation Manager في Trig Interior Design
  • المملكة العربية السعودية - الرياض
  • نوفمبر 2020 إلى أكتوبر 2021

Coordinating between all trades, preparing and controlling Variation Orders, reviewing the payments of all trades, reviewing the Contract quantities via BOQ, Original drawings and Specifications and comparing them to the revised documents, implementing and managing project changes and interventions to achieve project outputs.
Refurbishment of different types of villas and Majless.

Construction Project Manager في Part time work
  • المملكة العربية السعودية - الرياض
  • فبراير 2020 إلى نوفمبر 2020

Part time work

Construction Project Manager في Al Tahaluf Real Estate Company LLC شركة التحالف العقاري ذ.م.م
  • المملكة العربية السعودية - الرياض
  • فبراير 2019 إلى فبراير 2020

Project Manager - Ishraq Living Project - MOH - 2229 Villas
Coordinating between all trades, preparing and controlling Variation Orders and EOT, reviewing the payments and the Claims of all trades, reviewing the Contract quantities via BOQ, Original drawings and Specifications and comparing them to the revised documents, delegating tasks and responsibilities to appropriate personnel in the team, tracking project milestones, deliverable and LLI, managing project budget, implementing and managing project changes and interventions to achieve project outputs, preparing assembling and coordinating department staff and arranging cost breakdown analysis of the projects, preparing all correspondence in accordance with Contract terms and conditions and managing the POW.

construction project manager في Part time Work
  • المملكة العربية السعودية - الرياض
  • أبريل 2018 إلى فبراير 2019

Part time work

Senior Project Manager في CCE - Contracting and Construction Engineering
  • المملكة العربية السعودية - الرياض
  • يناير 2012 إلى أبريل 2018

Convention Hotel ITCC/ Crowne Plaza (SR 745M) and assisting in managing the projects of KAFD and SAMA Data Centers (SR 640M), Data Center ITCC (SR 298M) and CITC (SR 437M) including all external, infrastructural and roads works

Duties Issuing all regular IPCs to the Engineer and the Client, preparing and controlling Variation Orders and EOT, reviewing the payments and the Claims of all trades, reviewing the Contract quantities via BOQ, Original drawings and Specifications and comparing them to the revised documents, coordinating with the company’s different departments, delegating tasks and responsibilities to appropriate personnel in the team, tracking project milestones, deliverables and LLI, managing project budget, implementing and managing project changes and interventions to achieve project outputs, preparing assembling and coordinating department staff and arranging cost breakdown analysis of the projects, preparing all correspondence in accordance with Contract terms and conditions and managing the POW.

Resident Engineer - Project Manager في Rafik El-Khoury and Partners - MACe
  • الإمارات العربية المتحدة - أبو ظبي
  • مارس 2008 إلى يناير 2012

1. 01/06/2011 till January 2012

COMPANY Rafik El-Khoury and Partners - Consulting Engineers - Lebanon

Position Project Manager for Beirut Square in Beirut-Down Town area ($ 40M)

Duties Controlling and following technical issues, Controlling Long-lead Items, Revising and updating the program of works, checking, controlling of inspection requests and delivered materials on site, Cost/Quality Control and implementing health and safety requirements.


2. 09/03/2008 to 31/05/2011

COMPANY Rafik El-Khoury and Partners - Consulting Engineers - UAE

Resident Engineer for Tilal Liwa Hotel including all roads, accesses and infrastructural works in LIWA (AED130M), for AL Qattara Art Centre Construction and Restoration in Al Ain (AED 36M), for Infrastructural and Landscaping Works at Mina Residential Complex in Abu Dhabi (AED 50M) and Coordinator Manager for Abu Dhabi Trade Center Project in Abu Dhabi (AED 1.0B)

Duties Controlling and following technical issues, Pre-tendering documents, Controlling Long-lead Items, arranging site work progress and co-ordination meetings and preparing MOM, comparing the schedule plan according to actual site work, delivering weekly and monthly site progress, checking the efficiency of inspection requests and delivered materials on site, Cost/Quality Control and implementing health and safety requirements.

Senior Site Manager في Morganti Group Inc
  • الإمارات العربية المتحدة - أبو ظبي
  • أكتوبر 2005 إلى مارس 2008

COMPANY Morganti Group International (MGI) - Project Management
Position Senior Site Manager - one of the biggest projects in Abu Dhabi - Development of Residential Complex - Sheikh. Mohamed Bin Zayed City (AED 1.0 B) including all infrastructural, landscaping and road works, and Mixed use Development (5 Star Hotel, Residential and Commercial Complex) (AED 1.3 B).

Duties Strong leadership Style, Controlling and following several sites technically, and preparing of Breakdown Analysis, Pre tendering documents, Value Engineering and Cost Saving Exercises, arranging progress and co-ordination meetings, revising the schedule plan according to site work, delivering weekly and monthly site progress, checking the efficiency of inspection requests and delivered materials at site, Cost Control and implementing health and safety requirements.

Construction Manager في Belbadi Group
  • الإمارات العربية المتحدة - أبو ظبي
  • سبتمبر 2004 إلى أكتوبر 2005

COMPANY Emirates Belbadi Contracting Co. (EBC) - Construction Company
Position Construction Manager - H.H. Sheikha Moza Tower in Abu Dhabi that consists of sixteen (16) floors, Abu Dhabi Marina Mall - 1st extension including all external works, carrying-out all the tasks up to testing, commissioning and handing over.

Leading the site works, controlling the program of works, coordination between all site parties, issuing all inspection requests and the activity commencement notice, preparing the shop drawings submittals and all transmittal to be issued to the consultant, working under pressure and meet deadlines as per the program of works and update/revise the program as per the new modified activities finding the right solution to solve problems in civil works, finishing works and co-ordination between all activities and dealing with surveyor to achieve the right limits, locations and levels.

Projects Manager في Private Work – Having an Office
  • لبنان
  • ديسمبر 1999 إلى سبتمبر 2004

COMPANY Private Work - Having an Office
Position Projects Manager
Duties Carrying out the tasks of
Sixteen (16) Residential Buildings and One Industrial building at Bekaa (Refrigerator)
- Managing the projects, Co-ordination and co-operation between suppliers and the client.
- Full responsibility of projects and following the progress.
- Estimating and carrying out the whole construction details per shop drawing plans till
handing over and submitting the as built drawings.
Al Amir Sayf El Islam Ben Abd El Aziz Al Sououd Villa at Adma
- Full responsibility of project, following the site progress, collecting materials and Value
Engineering Management.
- Estimating and Carrying out the construction details per modified plans and sketches.
Engineer Ghassan Nehme Office - Roads, landscaping and infrastructural Works
- Completely responsible for the infrastructure works in Lebanon - Araya, Wadibnahlay, Bdedoun, Maaser Beit Eddin, Sarhamoul, Selfaya.
- Asphalting roads, irrigation canals and retaining walls
- Full responsibilities of projects, following the progress and controlling the schedule.
- Estimating and carrying out the details constructions per plan and sketches.

Project Manager - Client Representative في Liban Lait
  • لبنان
  • أبريل 1998 إلى نوفمبر 1999

COMPANY Liban Lait
Position Project Manager - Client Representative
Duties - Carrying out the works at the position of project manager, leading teamwork of engineers and site inspectors.

Industrial building ($ 20 M)
- Carrying out the work to complete works within the planned time with standard quality and as per the client requirements.
- Leading a team comprising of around 300 peoples.
- Reporting the daily site activities to the client directly.
- Liaising with the project team to complete the work to the satisfaction of the highest
authorities as well as the client’s requirements within the time allocated.

Projects Manager في Private Work – Having an Office
  • لبنان
  • أكتوبر 1995 إلى أبريل 1998

COMPANY Private Work - Having an Office
Position Projects Manager
Duties Complete the whole tasks starting from getting the approval from the local authorities up to handing over.

Four (4) Residential Buildings at Bekaa.
- Structural designer and project full responsibility.
- Coordinating all activities with the client due to specified materials.
- Executing the various site activities as per approved drawing.

Industrial Building for Card board and Plastic in Beirut - Chouweifat:
- Structural designer and project full responsibility.
- Coordinating all activities with the client due to specified materials.
- Executing the various site activities as per approved drawing.
- Organizing for required tests.

Project Engineer في Sassin Charbel – Road Works
  • لبنان
  • مارس 1995 إلى سبتمبر 1995

COMPANY Sassin Charbel - Construction Company
Position Project Engineer
Duties Duties Completely responsible for the infrastructural and Road works at Lebanon - Bekaa.

Site Engineer في Ashada
  • لبنان
  • يوليو 1994 إلى فبراير 1995

COMPANY ASHADA - Construction Company
Position Site Engineer
Duties Following the execution works for roads and the construction of the electrical network and substation to transform electricity from 110v to 220v in Lebanon - Beirut.


I Have the U.A.E driving license and car.
I wish that my C.V. would be taken into consideration.
I hope to acquire your appraisal and approval.

الخلفية التعليمية

ماجستير, Construction Project Management
  • في Heriot-watt University
  • مايو 2007

MSc in Construction Management (Project Management) – (Heriot-Watt University), Edinburgh • Preparing Value and Risk Management documents, • Preparing PMP/PEP according to BS6079, SOW, WBS, OBS, and TRM, • Dealing with different types of contracts and arranging the most suitable procurement strategy/method, • Preparing the Financial Report and studying the company performance, • Controlling DMS and PMS, traditional planning CPM, Crash Analysis, • Organizing Cost Control System and Cost Plan Analysis, • Reviewing Total Quality Management, Quality Assurance, Quality Control and Quality Audit, • Having wide knowledge of Mass production, Modularity, Buildability, Lean production and process mapping, • Involved in Partnering (Strategic Alliances) features and implementation, • Having a wide background about organizing and managing people, • Controlling Health, Safety and Environment management, and • Wide knowledge about FIDIC.

بكالوريوس, Civil Engineering
  • في Beirut Arab University
  • يوليو 1994

Bachelor in Civil Engineering–(Beirut Arab University), Beirut–Lebanon, Grading Class: Good

الثانوية العامة أو ما يعادلها, Mathematics
  • في College de la Salle
  • يوليو 1989

Mathematics- (College de la salle), Cairo-Egypt, Grading Class: Good

Specialties & Skills

Production
MS Project
Mathematics
SoftwareAutoCad , Win Word , Ms Excel , Power Point, Ms Project, Net Work and Primavera5

اللغات

الانجليزية
متمرّس
العربية
متمرّس
الفرنسية
متمرّس

العضويات

order of engineers-Beirut
  • Management consultancy
  • September 1994