محمد العدوي, Consultant

محمد العدوي

Consultant

Salfo and Associates SA

البلد
مصر - القاهرة
التعليم
الثانوية العامة أو ما يعادلها, Water & Wastewater Engineering
الخبرة
24 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :24 years, 2 أشهر

Consultant في Salfo and Associates SA
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ سبتمبر 2018

Position: Assistant Resident Engineer - Water
Project: Supervision of Internal Roads and Infrastructure Works for South West Sector 17, Khalifa City - Abu Dhabi - Client -MUSANADA
Duties and Responsibilities:

• - Review all shop drawings, profiles and As built drawings for water network .
• - Review Method of Statements related to water network at site.
• - Review Material Submittals required for all fittings, pipes and water Chambers.
• - Site Supervision of water network execution and direct inspectors/contractor at site.
• - Review WIRs related to water network.
• - Attending progress and technical meetings.
• - Coordinate with, the clients (MUSANADA& ADDC ) and authorities

• - Coordinating and orienting contractor.
• - Coordinate and work with other disciplines during construction
of the project to meet the project objectives.

Senior Water Engineer في M/s China Harbour Engineering Company
  • قطر - الدوحة
  • مارس 2015 إلى سبتمبر 2018

Project : East Corridor P011-Doha-Client Ashghal
•Duties and Responsibilities:

•- In charge for all technical issues all shop drawings, profiles for water Ductile Iron transmission pipelines 35 KM, diameters 1400, 1200, 900 mm.
•- Preparing All Method of Statement related to the work at site .
•- Materials Surveying required for all fittings, pipes and water Chambers.
•- Attending progress and technical meetings.
•- Coordinating and orienting subcontractors.
•- Coordinate with the consultant, the clients (Kahramaa & Ashghal ) and authorities.
•- Coordinate and work with other disciplines during procurement services/construction phases of the project to meet the project objectives.

Engineer
  • الإمارات العربية المتحدة
  • سبتمبر 2007 إلى أكتوبر 2009

and Responsibilities:
Prepairing shop drawings for all projects in the company for water & waste-water branch, request the materials, check the work in site with junior engineers . The value of projects up to 200 million ( AED

Consultant Engineer في Directorate of Military Works Ministry of Defense
  • الإمارات العربية المتحدة
  • أغسطس 2004 إلى يونيو 2007
Office Engineer في Arab Contractors
  • مصر
  • ديسمبر 2000 إلى أبريل 2002

I make survey for the various projects in our branch and study the progress and the delay for each project, the profit and the lost, the reasons for lost or delay and the procedure to solve

Infrastructure Engineer في Arab Contractors
  • مصر
  • أبريل 1999 إلى ديسمبر 2000

Projects: Morocco Branch Projects
•Duties and Responsibilities:
This project cost was 10 million USD including construction of 30 km roads and 30km gravity R.C. sewer pipes different diameters from 200 too 1000 mm, the client was NATIONAL OFFICE OF AIRPORT, in this project I prepare the B.O.Q. for subcontractors, make the monthly payments, make the quantity surveyor and take the final approval of the client engineer, check the quality control in site and take the approval for all items from the client engineer such as backfilling of roads, leveling, taking samples for compacted layers, leveling of pipes manholes

Site Engineer في Arab Contractors
  • مصر
  • ديسمبر 1996 إلى أبريل 1999

Projects: Sherbien Sewage Project
•Duties and Responsibilities:
the total cost of this project was 25 million Egyptian pounds, containing 35 km of gravity clay sewer pipes different diameters from 7 to 30 inches including manholes from 1.5 to 7 m depth, 5 lift stations diameter from 8 to 16 m with depth from 8 to 15m, force lines ductile iron with diameter 200 to 500 mm. I was quality control engineer
in this project, inspection of every item in the field such as leveling of the branches, seepage test, pressure test, backfilling, final approval to the client.

Site Engineer في Arab Contractors
  • مصر
  • ديسمبر 1995 إلى نوفمبر 1996

Projects: Post Graduate Studies, El-Mansoura University
•Duties and Responsibilities:
This period includes operation of the model and finishing of the practical research for M.Sc

Site Engineer في Arab Contractors
  • مصر
  • ديسمبر 1994 إلى ديسمبر 1995

Projects: El-Mansoura-School buildings
•Duties and Responsibilities:
The cost of this project was 4 million Egyptian pounds, construction of 5 multi-store school building, quality control of work, make shop drawings for execution , prepare monthly payments and quantities for client agreement.

Site Engineer في Arab Contractors
  • مصر
  • أكتوبر 1993 إلى ديسمبر 1994

This project was construction of multi-store administration building and fire building, this including all the items such as excavation, foundation, reinforced concrete, insulation, masonry, plaster, marble, painting, finishing
The total cost was about 3 million Egyptian pounds, I was both QC &QS engineer in this project.

Site Engineer في Arab Contractors
  • مصر
  • مايو 1992 إلى أكتوبر 1993

Projects: Post Graduate Studies El-Mansoura University
•Duties and Responsibilities:
This period I studied courses in preparing year for Masters Degree including courses in sanitary such as advanced water& wastewater, industrial wastewater treatment.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Water & Wastewater Engineering
  • في EL-Mansoura University
  • يناير 1998

The topic of MSc. is “The Use of Dissolved - Air Flotation. In Reducing the Pollutant Load on The Rapid Sand Filtration“ Egypt

الثانوية العامة أو ما يعادلها, Civil Engineering
  • في El-Mansoura University
  • يناير 1992

and Seminars: •TOEFL •COURSES IN (MANAGEMENT-WATER NETWORK DESIGN & MODELING -SANITARY).

Specialties & Skills

CUSTOMER RELATIONS
ENGINEERING
QUALITY CONTROL
CONSULTING
MATERIALS MANAGEMENT
TRANSMISSION
CONTRACT MANAGEMENT
COUNTER TERRORIST CHECK

اللغات

العربية
متمرّس
الانجليزية
متمرّس