Senior Planning and Cost Control Engineer
petrobel
Total years of experience :12 years, 5 Months
• Preparing time schedule for maintenance works
• Shop drawing
• Preparing S.A.P(System Application & Products) purchase orders and notifications
• Execute all civil works( Roads, Sanitary, R.C, Survey)
• Preparing Reports (Daily, Yearly, Work Percentage)
• Controlling Works
• Revamping R.C
• Quantity Survey
United Maintenance & Contracting Co. (UNIMAC):
Position: Senior Planning and Cost Control Engineer Duration (Jan 2016-present)
Project: Wadi Batha Development
• Main Contractor: UNIMAC
• Consultant: Buro happold
• Owner: ARRIADH DEVELOPMENT AUTHORITY (ADA).
• Project Cost: 49, 000, 000.00 SAR
Projects: ALNASR DEVELOPMENT PROJECT 33, 000, 000.00 SR, Shibh ALJAZERA DEVELOPMENT (32, 000, 000.00 SR)
• Main Contractor: UNIMAC
• Owner: RIYADH MUNICIPALITY
• Consultant: EURO CONSULT
Projects: Riyadh Metro Projects Road Works For ALL 6 Lines:
• Main Contractor: (BACS-FAST-NEW MOBILITY) CONSIRTUMES
• Subcontractor: UNIMAC
• Owner: ARRIADH DEVELOPMENT AUTHORITY (ADA).
• Projects Cost: 100, 000, 000.00 SAR
• Consultant: RMTC (PARSONS-Egis-SYSTA)
Project: KING KHALED INTERNATIONAL AIRPORT TB5:
• Main Contractor: TAV
• Subcontractor: UNIMAC
Project: Road Works for Riyadh Refinery:
• Main Contractor: Samsung
• Subcontractor: UNIMAC
• Owner: Aramco Oil & Gas Saudi
• Project Cost: 1, 000, 000.00 SAR Position : Project Manager
Job description: Preparing Time Schedules for Executing Fuel Hydrant System for:
1. Brunei International Airport.
2. Velana International Airport (Maldives).
3. Rehabilitation and Expansion of Cairo International Airport TB2 Fuel hydrant System
• Main Contractor : LIMAK
• Subcontractor: ALMAJD WARNER LEWIS
• Project Cost:200, 000, 000.00 L.E
Projects:
HURGHADA INTERNATIONAL AIRPORT PROJECT
• Main Contractor: SAUDI BENLADIN GROUP
• Consultant: DAR ELHANADASAH
• Owner: Egyption Airport Company.
• Project Cost: 1, 650, 000, 000 L.E
(The Project Consists of Main Terminal, Apron, Services Buildings, Roads, Landscape and Network Facilities)
Duration: (September 2012 - Present)
Job description:
1. Creating project schedule.
2. Shop drawings reports.
3. Procurement follow up.
4. Updating schedule.
5. Look ahead for sub-contractors.
6. Daily, weekly & monthly reports.
7. Sub-contractors status.
8. Sub contractors follow up.
9. Crashing
10. Time Extension Claims.
MERIDIAN HOTEL PROJECT AT CAIRO INTERNATIONAL AIRPORT
• Main Contractor: SAUDI BENLADIN GROUP
• Consultant: Engineering Consultants Group (ECG)
• Owner: AIROTEL.
• Project Cost: 500, 000, 000 L.E.
(The Project Consists of Main Building, Swimming Pool, Services Buildings and Landscape)
Duration: (October 2012 - December 2012)
Job description:
1. Creating updating matrix.
2. Updating progress.
3. Weekly reports.
1. Had designed many projects and drawing many steel panels.
2. Had Executed many building, villas, and two factories at new Cairo, Shorouk, Mokattam And Oboor cities
• Execute soil exploration
• Responsible of receipting excavation.
• Responsible of receipting of all wood jobs.
• Supervised of receipting the steel bars of the roofs, columns, beams and foundation at all.
• Supervising reinforcement concrete pouring
•Quantity Survey.
Art vision: Duration: (26/03/2012-7/05/2012)
Position: Structural Engineer.
1. Prepare shop drawing panels.