Mohamed El Borolossy, Projects Manager

Mohamed El Borolossy

Projects Manager

ECG Engineering Consultants Group

Lieu
Egypte - Le Caire
Éducation
Baccalauréat, Civil Engineering - Structural Division
Expérience
20 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 11 Mois

Projects Manager à ECG Engineering Consultants Group
  • Egypte - Le Caire
  • Je travaille ici depuis janvier 2013

Duties include project management; establishing detailed scope of work for the project in conjunction with the company principal-in-charge and client, and in accordance with the project proposal and contract; preparing monthly project status reports, change orders, and invoices; monitoring the progress of all project functions and reports on their status to the projects division head and client; authorizing and approving all requests to the Finance Department for preparation of invoices to the client; authorizing and approving all costs charged to the project; approving all submittals to the client of work outputs, information requests, advisory notices, project status reports; coordinating inter-company work assignments with other divisions and departments of the following projects:
- Design Consultancy Services for City Gate, Egypt scope of work includes infrastructure design, Landscape and Golf Course
 Mall Of Arabia Compound
With a built-up area of 671, 751m2, Dar AlArab development is divided into 2 phases: Phase 1 comprises three types of apartment buildings with different areas; each consists of a basement, a ground floor, 4 typical floors and a penthouse; Six administration buildings; each consists of 2 basements for parking a ground floor and 3 typical offices floors; Club House and Sports Facilities Building which consists of a ground and a first floor and a mosque. Phase 2 comprises five-Star Hotel which consists of a ground floor and 16 typical floors served by a basement; Serviced-Apartment Building; which consists of a ground floor and 16 typical floors served by a basement; and three-Star Hotel which consists of a ground floor and 3 typical floors.
 KIZAD Storage Warehouse
Detailed Design for Storm Water Network and Roads network
 Security Medical Center in Jeddah
Preliminary Design and preparing B.o.Q and cost estimate and value Engineering report

Design Manager à Carillion
  • Egypte - Le Caire
  • septembre 2009 à décembre 2012

Duties include Manage a team of Engineers and Draftsmen in preparing Shop drawings, material submittals, RFI’S and manage Design Deliverable prepare scope for subcontractors and sub consultant Represent the company in coordination and progress meeting with the Client and subcontractors Monitor Design Change, monitor the coordination process between all the disciplines (STR, Arch, Mech)
• Cairo Festival City - Retail Project.
• Cairo Festival City -Infrastructure Project.
• Cairo Festival City -Site Wide Landscape.

 Cairo Festival City is architecturally striking masterpiece designed on 218, 000m2 plot with a total buildings area of 525, 500m2, totaling 168, 000m2 of leasable area, once completed the Retail will house over 310 shops, 95 restaurants and cafes, 17 international flagship stores including IKEA, Carrefour and Marks & Spencer as well as 18 screen multiplex cinema, family entertainment centre and a parking of 7, 000 cars.

Assistant Manager à Samsung Engineering
  • Corée (Sud)
  • novembre 2007 à décembre 2008

Duties:

o Design and Check Design for Reinforced Concrete Structures,
Equipment Foundation, Piles Foundation, Drainage Systems for Oil
And Gas Plants

Projects:

1. Ethan Separation Plant Project Map Ta Phut, Thailand
2. Gas Separation Plant Project Map Ta Phut, Thailand

Senior Design Engineer à E-Construct
  • Egypte - Le Caire
  • mai 2006 à novembre 2007

Duties:

· Design of Reinforced Concrete Structures, Foundation According
to the British Standard and American Code

Projects
1. Elghurir Extension Mall In U.A.E
2. Latifa Tower

Design Engineer à CDC
  • Egypte - Le Caire
  • décembre 2005 à mai 2006

Duties:

· Design of Reinforced Concrete Structures, Foundation According
to the British Standard and American Code

Projects

1. G-2 Intelligence Command and Head Quarters Security Brigade
(Kabul-Afghanistan) (20million U$ Cost)
2. Kabul Military Training Camp (K.M.T.C) - (Kabul -Afghanistan) (25 Million U$ Cost)

Design Engineer à Misr Concrete Development Company
  • Egypte - Le Caire
  • octobre 2002 à novembre 2005

Duties:

· Design and Check Design for the Structures According To The
Egyptian and American Code of Practice
· Workshop Drawings and Detailing Of Reinforced Concrete
· Preparing Bending List, Reinforcement Details



Projects
1. Ahmed Hamam Conference Center (10 Million Pound Cost)
2. Various Residential Buildings At (Maadi-Nasr City-El Mirage City)
3. Faculty Of Arts, El Mansoura University (50 Million Pound Cost)
4. Faculty Of Girls Ain Shams University (20 Million Pound Cost)
5. Four Grain Silos (Tender)
6. Khartoum-Soba New Water Works (Flash Mixing Tank)
7. Female Students Hostel, Alexandria

Éducation

Baccalauréat, Civil Engineering - Structural Division
  • à Ain Shams
  • août 2002
Master, MBA in Project Management
  • à Arab Academy For Science and Maritime Transport.
  • mai 2002

Specialties & Skills

Project Management
Procurement
Consultant Coordination
SAP/Etabs/Safe
Excellent knowledge of the Microsoft Office Package (Word, Excel and PowerPoint).

Langues

Arabe
Expert
Anglais
Expert