Mohamed ElSarha, Research And Development Manager

Mohamed ElSarha

Research And Development Manager

Redcon Construction

Lieu
Egypte - Alexandrie
Éducation
Master, Global BIM management certification
Expérience
14 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 11 Mois

Research And Development Manager à Redcon Construction
  • Egypte - Le Caire
  • Je travaille ici depuis septembre 2020

Creating the BIM Document standards for the company.
• Creating the Revit template and the family library of the company.
• Standardizing the modelling methodology through the company.
• Creating the workflow of the information exchange manual between the company department.
• Implementing the system and standards in different departments
• Creating the standard workflow using the CDE (Common Data Environment) for the collaboration between the site
and technical office.
• Creating the system of DMS (Document management System) using the CDE to store and label the construction
documents. (Paperless Projects)
• Creating the LOD (Level of Development) Standard for the company.
• Researching the best workflow of LIDAR (Laser Scanning) point cloud with BIM and the best practice to use the
data.
• Upgrading the BIM workflow to reach the virtual design construction (VDC) using 4D and 5D simulation and get the
best cost, quality, safe and sustainable construction method

BIM Consultant and Business Developer à BIMES
  • Egypte - Alexandrie
  • Je travaille ici depuis août 2019

-Drive Standards, processes & procedures.
- Oversee integration of BIM and Information technology.
- R&D Innovative solutions to stay on cusp of technology.
- Present BIM Capabilities to Clients (Proactive).
- Persuade upward and downward to adopt advanced vision.
- Create internal on-site consultant approach to serve project teams.
- Integration of BIM and Sustainable Design.
-Propose pilot initiatives and manage: technical & financially.
- Ensure project BIM execution plans adherence and success.
-Leading the educating and training development in the organization.
- Manage the production of BIM marketing material
-Build a BIM marketing strategy: website & cut-sheets.
-Strategic on-going relationship with the BIM and software industries.

Senior Technical Office - Architect (Acting As BIM Manager) à Orascom construction
  • Egypte - Alexandrie
  • novembre 2017 à août 2019

-Participating in the BIM Implementation for the Company.
- Responsible of BIM implementation for the project.
- Responsible of BIM Execution Plan for the projects.
- Creating the Information Delivery Manuel (IDM) for the projects.
- Preparing and supervising the workshop drawing and technical drawing for the project fo ElAlamein Towers LD-01.
- ElAlamein LD-01 contains a Podium built on a land measures 34, 297.2m2. Each Podium contains a Lower Level, an Upper Level and a Mezzanine Level. Above every Podium there is two different types of Towers with different Plans Proposals and floors varies from 19 floors to 32 floors. The Total of the built-up Area for the project is 215, 613.07m2, with a budget of 7 Billion Egyptian Pounds.
- Creating Shop drawing for a residential compound of 98.63 Acres using Revit and Civil 3D (2018)
- The residential compound contains a variety of residential buildings from apartment buildings of 14 Floors to a twin house Villa of 2 Floors and a Clubhouse.

Office Manger à Access For Architecture and urban Planning
  • Egypte - Alexandrie
  • juillet 2012 à novembre 2017

• Making the workshop drawing using BIM technology of a Saudi Military Facility contains 5 buildings - Jizan - Saudi Arabia (2016)
• Designing ElWakeel Hospital and supporting the DD phase with BIM Model to insure the construct ability - Alexandria (2016)
• Elevation design for “ElQuodah Residents Complex”, Khorshid, Alexandria (2015)
• Elevation Renovation design of Hendy Mall, Alexandria (2015)
• Workshop Drawings for Hilton King ranch SPA Interior Design for German Interior Consultancy krysys design GmbH (2013-2014)
• The preparation of the elevation’s workshop drawing of the city of the engineers at 6 October. (2011-2012)

Technical office manger à FATA Technical Office
  • Egypte - Alexandrie
  • septembre 2013 à octobre 2017

Furnishing and decorating Villa Hamdy Fayed - El Gouna, Hurghada (2015)
• The Design and architectural drawings for the worker building for Agrovate Company, Wadi el Natron (2015)
• The renovation of the Loading path for Agrovate Company, Wadi el Natron (2015)
• Design and Shop Drawing of FATA Agriculture Offices Interior, ElSadat (2013-2014)
• El-sheikh Fahd el Tamimy Apartment Interior at San Stefano Finishing supervision (2014)
• Creating an extension for the FATA Agriculture coldstores with coordination required (2014)
• The renovation of the packing house area at Orchard Company (2013)

Senior of interior design and construction à Wahagstudio
  • Egypte - Alexandrie
  • juillet 2011 à décembre 2013

Design And construction of the El Safwa residents Entrance Interior Design -Sporting, Alexandria (2013)
• Design and shop drawing Documentation of Al Quds Residents - El seouf, Alexandria (2013)
• Construction Of Farag Nafae San Stefano Apartment Designed By Amr Hafez (2012-2013)
• Design of the city Kids Series Interior and Exterior Design, Kids Cloth Stores (2013)
• Design and Construction of Overseas Tours Interior - Semouha- (2011-2012)
• Making documentation drawings for the Rock Mall and interior design - Nasr City - Cairo (2012)
• Design and Construction of 4 apartments, Renovation and redecoration (2012)

Coordinator between the site works and the design technical Office à El-Hakeem for Construction
  • Egypte - Alexandrie
  • avril 2010 à juillet 2011

Design a 284 Acers North Coast touristic compound at 190km Alexandria -Matruh Road (site plan-units plan modifications -elevations modifications) .(11-2010 to 03-2011).
•Design a 28 Acers North Coast Commercial Plaza at 120km Alexandria - Matruh Road (02-2011 to 04-2011).
Design and construction of El Hakeem Booth at Carrefour Alexandria and El Maadi.(06-2010)
•Elevation drawings for Midway Residents Buildings at 124km
Alexandria -Matruh Road.(07-2010)
•Elevation drawings for Midway Mall & Hotel Building at 124km Alexandria -Matruh Road.(08-2010 to 10-2010)

Architect and interior designer à Egyptian House for Architecture and Planning
  • Egypte - Alexandrie
  • juillet 2009 à avril 2010

Design and Graphic output proposal of a Mall in Tripoli - Libya. (07-2009).
•Participating in the presentation of the avant project of the smart village of Alexandria (08-2009).
•Participating in the Preliminary urban planning report of Aboutig - Asyut -Egypt. (08-2009, 09-2009).
•Participating in the urban planning of 150 manors at el-Gharbia - Egypt. (10-2009 to 12-2009).
•Participating in the design process and the avant project of the Dhofar Governorate Building - Sultanate of Oman.(01-2010 to 02-2010).

Éducation

Master, Global BIM management certification
  • à Zigurat Academy
  • juillet 2019

BIM management certification a program

Master, Building Information Modeling
  • à Arab Academy for Science, Technology and Maritime Transport
  • octobre 2018

A Master Degree with a title of : BUILDING INFORMATION MODELING AND PROJECT COMPLEXITY The level of information in the detailed design phase in hotel buildings" Buildings are man-made structures used as a shelter. The buildings or Architecture, Engineering, construction (AEC) industry is developing rapidly due to the technology development and new trends. These building developed to be smart buildings that contains great features as systems like building automation, life safety, telecommunications, user systems and facility management systems. These systems add complexity for the building as it has recommendations and requirements to be installed to the building. One of the growing industries in Egypt that is related to the development of the buildings and the new trends is the hotel industry. Tourism is one of the main pillars of the economy in Egypt which is developing rapidly due to the location and monuments located in the country. The main challenges that faces the hotel industry is the lack of coordination and the lack of good design. The hotel projects are classified as fast track project which are required at certain time to make income and within budget to has the best return on investment. BIM is the solution for such complex building types that required to be finished on time and within budget. This new technology and process will facilitate the way to complete the project due to the ease of extracting and exchanging information through its life-cycle. The Aim of this research is to introduce a framework as new comprehensive tool for the BIM that starts from the early design phases of the project to serve the construction phase by a suitable level of information. The scope of this research is the detailed design phase level of development of elements for complex hotel buildings. To Reach this aim and cover the scope, the research is divided into the following chapters: - Chapter 1: the research introduction, questions, aim, objectives, Methodology, hypothesis and research structure. Chapter 2: the relation between the hotel building classifications and project complexity to reach the level of complexity of hotel buildings. Chapter 3: the impact of building information modeling on project phases through the study of the building information modeling execution plan. Chapter 4: creating a frame work by using the building information modeling execution plan in the detailed design phase. Chapter 5: applying the framework on Hilton Kings Ranch as a case study. The expected result of this research is that the BIM technology and process will improve the outcome of the hotel building with better time, better cost and better quality.

Baccalauréat, Architecture
  • à Faculty of fine Arts
  • mai 2009

Specialties & Skills

Interior Architecture
Hotel Design
ArchiCAD
Interior Design
AutoCAD
3D Max Modeling
V-Ray 3D MAX Rendering
Interior Designer
BIM Specialist
Artlantis
Architecture Designer
ArchiCAD
Revit Architecture
Navisworks
AecoSim
Civil 3D

Langues

Arabe
Expert
Anglais
Expert
Français
Moyen
Allemand
Débutant

Adhésions

Egyptian Syndicate of Engineering
  • Member
  • July 2009

Formation et Diplômes

Revit 2018 (Formation)
Institut de formation:
Zigurat Global Institute of technology
Date de la formation:
November 2019
Durée:
101 heures
Masters in Global BIM Management (Certificat)
Date de la formation:
December 2019
Certified Management-Building Information Modeling - unit 2 (Formation)
Institut de formation:
American Association of general contractor
Date de la formation:
October 2016
Durée:
8 heures
Certified Management-Building Information Modeling - unit 1 (Formation)
Institut de formation:
American Association of general contractor
Date de la formation:
October 2016
Durée:
8 heures
Certified Management-Building Information Modeling - unit 4 (Formation)
Institut de formation:
American Association of general contractor
Date de la formation:
October 2016
Durée:
8 heures
Certified Management-Building Information Modeling - unit 3 (Formation)
Institut de formation:
American Association of general contractor
Date de la formation:
October 2016
Durée:
8 heures

Loisirs

  • Rugby, Drawing, Music
    I was a player in the national team of rugby in Egypt. I filled my sketch book with a lot of drawings and sketches for new ideas and details.