site engineer
arab contractor
مجموع سنوات الخبرة :13 years, 11 أشهر
Executive Site Engineer involving for Shoring, Dewatering, Pilling works, Pile caps, Piers, Pre-cast concrete, Prestressed concrete, Tunnels, Retaining walls, Cast In-Situ works in foundations, piers, bridge deck and diaphragms
Executive Site Engineer in the Egyptian Arab Contractors in Kuwait
Project: -
From 4/9/2011 till to date
Owner: Ministry of Public Works M.P.W kuwait
PROJECT: JAHRA ROAD BRIDGE
Technical Consultant: PAN ARAB & LOUIS BERGER JOIN VENTURE Consultant Office
Executive Site Engineer involving for Shoring, Dewatering, Pilling works, Pile caps, Piers, Pre-cast concrete, Prestressed concrete, Tunnels, Retaining walls, Cast In-Situ works in foundations, piers, bridge deck and diaphragms.
The Chinese Company (MCC) at Kuwait University Project
From 20 / 6 / 2011 to 3 / 9 /2011
Structural Technical Office: Feasibility Studies for our Projects (Planning & scheduling) &Construction methos statement for execution and preparing Sub-Contracts, Quantity Surveying, Specifications and Tendering
Egyptian Group For Engineering & constraction (E.G.E.C)
From 1 / 8 / 2010 to 30 / 5 /2011
Executive Engineer: Execute of Hospital In Sohag
(Pilling Works, R.C Raft, Flat slab, Hollow block slab)
Training Experience: -
Training in ARAB CONTRACTORS Company
From 1 / 7 / 2007 To 30 / 8 / 2007
• Windows & Related applications
• Hardware Maintains and problem handling
• AutoCAD (2D) shop Drawings
• SAP structure Analysis Program
• M.S Office (Word, Excel, Power Point)
• PHOTOSHOP ( editing photos)
• Internet and Related applications
• Familiar with all office equipment Fax, photocopying, Printers, etc
• Computerized Designing Calculation Sheets
• Quantity surveying & Time Schedule
Degree: Good
• Bachelor of civil Engineering 2010 from Faculty of Engineering Assiut University - Civil Department Grade: Pass (61.55 %) Project: Building on soils with problems