Mohamed El Sayed Ahmed Mohamed Hassan, Senior Reservoir Engineer

Mohamed El Sayed Ahmed Mohamed Hassan

Senior Reservoir Engineer

SCHLUMBERGER COMPANY – SIS – Kuwait

Lieu
Koweït - Al Ahmadi
Éducation
Master, Petroleum Engineering
Expérience
18 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 9 Mois

Senior Reservoir Engineer à SCHLUMBERGER COMPANY – SIS – Kuwait
  • Koweït - Al Ahmadi
  • Je travaille ici depuis décembre 2014

• Providing on-site support for Kuwait Oil Company (KOC) supporting Schlumberger reservoir simulation software such as (ECLIPSE, Petrel, PVTi, ... etc)

Reservoir Engineer à SCHLUMBERGER COMPANY - SIS - Egypt
  • Egypte - Le Caire
  • novembre 2011 à décembre 2014

Highlights
• Taught courses on reservoir engineering, software, practices & applications as under -
√ Reservoir engineering software's workflow (Eclipse-Petrel RE), Cairo University-Petroleum Department (2012).
√ Reservoir engineering software and workflow (Petrel RE), American University in Cairo-Petroleum Engineering Department (2012).
√ Reservoir engineering software & workflow (Petrel RE), Suez Canal University - Petroleum Engineering Dept. (2012).
√ Reservoir engineering (History Matching Techniques), Suez Canal University - Petroleum Engineering Dept. (2012).
√ Reservoir engineering software and workflow (Petrel RE), SPE Student Chapter (2012).
√ Reservoir engineering software and workflow (Eclipse - Petrel RE), Summer & Winter trainee students (2012-2013).
√ Applied Reservoir Simulation Course, Eclipse 100, Petrel RE, PVTi, Eclipse Office & SCAL software for new employee (2012).
√ Reservoir Management Course for SPE student chapter (2013).
√ Water flooding Course for SPE student chapter (2013).
√ Uncertainty and Optimization and PVTi Course, for the GPC Company for 7 days (2013).
√ Petrel RE and advanced options as well as fault analysis module course to SOC company (Iraq) in Kuala Lumpur, Malaysia, 3 weeks (2013)
• Worked as Segment Instructor on Eclipse/Petrel RE/PVTi & Compositional/Uncertainty & Optimization of Petrel RE, at -
√ PeroSelah - Egypt, TriOcean - Egypt, Kuwait Energy - Egypt, BayPetCo - Egypt, Petrosalam - Egypt, BG - Egypt, Khalda - Egypt, Suco - Egypt, Zeitco - Egypt, GPC Company - Egypt.
• Conducted full-field reservoir simulation studies for South Ghareb Field, for Petrobel Company (oil field with 20 wells producing from 2 reservoirs) & GPC Company (oil field with 31 wells producing from Rudies reservoir), including -
√ Static Model Review and QC (Petrel).
√ Data Collection/ Review and QC
√ QC on the Grid Property Arrays in Petrel RE
√ QC and Preparation of PVT Data
√ QC and Preparation SCAL Data
√ QC Well Production Data
√ Simulation Data preparation
√ Dynamic Model Setup
√ Dynamic Model Initialization
√ Model Validation by History Matching (manual history match), and using Uncertainty & Optimization module.

Senior Reservoir Engineer à East Zeit Petroleum Company - Zeitco
  • Egypte - Le Caire
  • septembre 2005 à novembre 2011

Highlights
• Handle all the reservoir work such as calculations of OOIP (volumetric or Material Balance), decline curve analysis, and reserve growth and reservoirs management.
• Successfully built a full field model by using Petrel Software for East Zeit reservoirs (Nubia, Nukhul & Kareem) for Main & East Fault Block (6 Reservoirs), including -
√ Pre-simulation work e.g. PVT validation, routine core analysis (porosity -permeability relation & flow unit technique).
√ Special core analysis including capillary pressure and relative permeability analysis using pre-processor software (SCAL, PVTi, SWPM & OFM) for data preparation.
√ Estimation of water saturation based on PC curve method.
√ Dynamic model initialization using SWATINIT & history matching of pressure and production data for the 25 wells using Eclipse Software.
√ Performing different scenarios of field development plan (FDP) including different prediction scenarios in primary recovery mechanism by introducing new development well (horizontal section) in Kareem East Fault Block.
√ Application of pressure maintenance scenarios using secondary recovery methods (water injection & gas injection) technique with sensitivity on injection rates and voidage replacement ratios for Nukhul East Fault Block.
√ Reservoir management to solve water conning problem in Nubia wells in Main & East Fault Block.
• Involved in Surveillance Engineering, including -
√ Estimation OOIP by the volumetric methods and material balance equations.
√ Analyzing reservoir pressure decline performance and determining the drive mechanism using various types of plots (P/z Vs Gp, Depletion and Energy Plots and Havlena - Odeh Analysis) and determined OOIP in water drive reservoirs.
√ OFM decline-curve analysis for reserve estimation and production forecasting.
√ Studies to define the optimum development plans & shut-in wells study.
√ Defining surveillance programs, interpreting results come up with recommendations.
√ Analyzing the pressure transient tests (draw down, PBU) using Saphir program.
√ Interpreting and analyzing openhole logs and RFT.
• Performed Well Operation Engineering, including -
√ Well optimization including recompletions, perforations, WSO and workovers to maximize oil recovery.
√ Observation and evaluation of the well performance and offering proper remedial work.
√ Coordination with the operation division about the daily activities.
• Prepared following reports -
√ Oil and gas budget production forecast.
√ Monthly board report to discuss any deviation from the budget.
√ Monthly production allocation report to allocate production data.
√ Annual report to evaluate all activities during the year.
√ EGPC correspondence (forecast, production performance every quarter, etc.).

• Involved in all production and petroleum engineering activities.
• Witnessed the field operations - Pulling & running Conventional and ESP completion, Wireline work, Jet pump installation, CHFR Logging, CTU, Nitrogen lifting and Stimulation Jobs.
• Initiated and established OFM Data Base project for EZ Field.
• Participated in a task force with project, facilities and production engineers to study and propose a workover program to rescreen the artificial lift methods including the required modification to the surface & subsurface design and cost estimate.
• Production data allocation and issue of monthly production and engineering activities.
• Prepared reservoir data book (Well histories, WBS, Reservoir Pressure, etc.)
• Prepared Completion & workover programs.
• Prepared ESP and Jet Pump Design.

Éducation

Master, Petroleum Engineering
  • à Faculty of Petroleum Engineering and Mining, Suez University
  • avril 2013

Thesis Subject:" A Simulation Study for Assessment of Pressure Maintenance for Nukhul Reservoir at East Zeit Oil Field".

Baccalauréat, Petroleum Engineering
  • à Faculty of Engineering , Cairo University
  • juillet 2003

Bachelor Degree in Petroleum Engineering

Specialties & Skills

Reservoir Simulation
Reservoir Engineering
Reservoir Management
Simulation
Modeling
Petex Pachage (MBAL,Prosper,..)
Simulation Software (Eclipse,Petrel,...etc)

Langues

Arabe
Expert
Anglais
Moyen

Adhésions

SPE
  • Member
  • March 2003

Formation et Diplômes

Advanced Eclipse Options (Formation)
Institut de formation:
Schlumberger Company – UK
Date de la formation:
October 2012
ESP and VSD Operation & Maintenance Course (Formation)
Institut de formation:
Weatherford Training Center -Egypt
Date de la formation:
March 2006
Sales I Course (Formation)
Institut de formation:
Schlumberger Company – UK
Date de la formation:
October 2012
Project Management II (Formation)
Institut de formation:
Schlumberger Company
Date de la formation:
September 2014
Water Flooding From A to Z Course (Formation)
Institut de formation:
The Egyptian Training Services Company (ETS)
Date de la formation:
May 2007
Petrel 2008 Course (Formation)
Institut de formation:
Schlumberger CTC -Egypt
Date de la formation:
February 2009
Intersect Simulator Course (Formation)
Institut de formation:
Schlumberger Company – UK
Date de la formation:
October 2012
PVTi & PVT Analysis using EOS (Formation)
Institut de formation:
Schlumberger Company – UK
Date de la formation:
October 2012
Artificial Lift Systems (Formation)
Institut de formation:
International Expertise Association (INTEX) Center
Date de la formation:
February 2006
Compositional Simulation, Theory & Applications using Eclipse E300 (Formation)
Institut de formation:
Schlumberger Company – UK
Date de la formation:
October 2012
Applied Reservoir Simulation (Formation)
Institut de formation:
NeXT Schlumberger
Date de la formation:
December 2009
SIS Train the Trainer-TrainSmart (Formation)
Institut de formation:
Schlumberger Company – Egypt
Date de la formation:
June 2013
Petrel Advanced Gridding and Up-Scaling Workshop (Formation)
Institut de formation:
Schlumberger CTC-Egypt
Date de la formation:
March 2010
Sales II Course (Formation)
Institut de formation:
Schlumberger Company – France
Date de la formation:
September 2014
Computer Aided History Matching Using MEPO (Formation)
Institut de formation:
Schlumberger Company – UK
Date de la formation:
October 2012
Production Optimization by Using "Nodal Analysis" (Formation)
Institut de formation:
Oil & Gas Skills Company (OGS)
Date de la formation:
May 2010
Reservoir Management Course (Formation)
Institut de formation:
Oil & Gas Skills Company (OGS)
Date de la formation:
April 2008
Computer Aided History Match Workshop using SIMOPT (Formation)
Institut de formation:
Schlumberger CTC - Egypt
Date de la formation:
March 2010
Eclipse 100 Course (Formation)
Institut de formation:
Schlumberger CTC -Egypt
Date de la formation:
October 2008
Natural Fracture Reservoir, Theory & Applications using Eclipse (Formation)
Institut de formation:
Schlumberger Company – France
Date de la formation:
September 2014
KABO Field Simulation and Field Development Plan with Economic Study (Complete Study) (Formation)
Institut de formation:
Schlumberger Company – France
Date de la formation:
September 2014
Marine Survival Safety Course (Formation)
Institut de formation:
Arab Academy for Science, Technology and Maritime Safety
Date de la formation:
November 2005
Project Management I (Formation)
Institut de formation:
Schlumberger Company – UK
Date de la formation:
October 2012

Loisirs

  • Watching TED
  • Reading