Mohamed Farrvis Abthul Ahathu, Senior Quantity Surveyor

Mohamed Farrvis Abthul Ahathu

Senior Quantity Surveyor

Al Darwish Engineering

البلد
قطر - الدوحة
التعليم
بكالوريوس, Quantity Surveying
الخبرات
9 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :9 years, 2 أشهر

Senior Quantity Surveyor في Al Darwish Engineering
  • قطر - الدوحة
  • أبريل 2021 إلى مايو 2023

● Project -Masraf Al Rayan head, UDC School Project

Post -contract
Responsibility: -
• Preparing, negotiating and agreeing on valuation measuring subcontract works and processing payments.
• Preparing and submitting interim and final applications for payment Using ORACLE.
• Able to source for sub-contractors/suppliers for quotations, evaluations and quote comparisons to assist in the negotiation for best prices and Subcontract Agreements.
• Reviews and validates Bills of Quantities prepared by others, evaluates payment certificates, and supports claim analysis and agreement of change orders (variations).
•Managing payment, sub-contractors, suppliers and third parties
• Correspondences to Consultants and sub-contractors.
• Preparing Variation Order

Pre-contract
Responsibility: -
• Prepare the RFQ (Request for quotation) packages.
• Sending the RFQ packages to the various suppliers & sub-contractors in accordance with the vendor’s list (if provided).
• Preparing technical queries for ambiguities in drawings, specifications, BOQ or any missing information.
• Prepare the Cost Comparison statement for all the offers received from various sub-contractors & suppliers.
• Prepare the tender brief for management review.
• Provide technical and contractual support to the procurement team during •Subcontract package preparation and Attend the Site visits & meetings.
• Follow-up with the sub-contractors & suppliers for the quotations.

Client Quantity Surveyor في AL KAMAL INTERNATIONAL GROUP
  • قطر - الدوحة
  • مايو 2019 إلى أبريل 2021

● Project - Construction of KDO Residence & Parking Building (Palace Project)
Responsibility: -
• Review recommendation of the final value of variations prepared by the cost consultant which includes checking quantities, rate analysis and as-built drawing to identify cost variation from RFI’s and shop drawing
• Work closely with the supervision consultant on-site and ensure that all contractual and commercial information is reported to the management
• Validation of new rates by the consultant for items missing the bill of Quantities
• Validation of quotation provided by the projects’ team for any miscellaneous work to be carried out in the project
• Review the latest Drawings for quantity measurement and check for any discrepancies against the Tender drawings, Specifications, and the Bill of Quantities.
• Document progress, materials, and reports on the project.

Quantity Surveyor في AMERICAN INTERNATIONAL CONTRACTORS, INC
  • قطر - الدوحة
  • أبريل 2018 إلى أبريل 2019

● Project - Shield 5 Program Army air base Project (30 G+ Buildings, Road construction & Infrastructure)

Responsibility: -
• Site visits during construction stage to identify the progress of work.
• Reviewing Site Clarification Reports and Shop Drawings for comments indicated by the employer for any additional works and preparing claims for additional works.
• Maintain logs for claims and thereby agree on variations/change orders

Quantity Surveyor في GULF CONTRACTING COMPANY
  • قطر - الدوحة
  • مارس 2014 إلى فبراير 2018

● Project: Doha Festival City (DFC) - The DFC is the largest retail and
entertainment development in Qatar which comprises over 500 stores and a gross floor area of 327, 000 square meters.
 Project sum - QAR 2.42 Bil (Tender-1.97bn+ Variation-450Mn)

● Project: AL-Manjara (Joinery Section) - AL-Manjara Provides a Total
Package, From Design to Manufacture to Installation, Guarantees you
quality and reliability, every step of the way. Combine traditional
craftsmanship and expertise with the latest technology and joinery products.

Responsibility: -
• Measuring ongoing/completed works
• Prepare Materials Reconciliation statement
• Responsible to monitor cost overruns and submitting payment claims and monthly evaluations.
• Taking off quantities based on the standard method of measurements for finalizing the subcontractor works.
• Identifying and measuring Variations.
• Prepare Interim Valuations and certify subcontractors
Valuations.

الخلفية التعليمية

بكالوريوس, Quantity Surveying
  • في The University Of Wolverhampton
  • يوليو 2011

-

دبلوم عالي, Quantity Surveying
  • في British College of Applied Studies
  • يوليو 2009

Specialties & Skills

Construction Safety
Team Player
Presentations
Decision Making Skills
Negotiation
PROGRESS
COMPETITIVE
CONSULTING
CUSTOMER RELATIONS
DISPATCHING
DOCUMENTATION
MATERIALS MANAGEMENT
MICROSOFT WORKS

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

quantity surveyor (تدريب)
معهد التدريب:
V. V karunaratna and company
تاريخ الدورة:
June 2007

الهوايات

  • Reading