مجموع سنوات الخبرة :1 years, 6 أشهر
Take training for ALU equipment for 2 months (MBOE1, MBOE2, MPR 9500, NODE B) by ALU supervisors.
- Sites swap 2G and transformation for Indoor to Outdoor for Orange.
.
-Swap site MW link installation and commissioning for MSS1, MSS4, MSS8 for Orange.
-Survey project existing sites for Orange.
- Work as coordinator for 6 teams works for swap project 2G, 3G and MW .
- Work as project manager for the 2 months.
Main responsibilities:
-Ensuring the H&S tools and familiar with the safety requirements.
- Achieving a high rate of delivering accepted Sites according to the client’s specifications.
- Filing a full technical report of the site to ensure the client’s specs.
- Handling joint acceptance site visits with client's engineers.
- Assisting the
Survey project existing sites for Ethiotelecom.
-Survey project new sites for Ethiotelecom.
New sites Back Bone project for MTN with equipment Huawei and NEC
- New sites for ZAIN with Huawei equipment.
-RRU allocation project for Sudani.
access with full technical knowledge of the installation & links commissioning procedures in most of Huawei® BTS outdoor and indoor types such as BTS 3900 and APM30.
-Swap sites for Vodafon operator from Ericsson to Huawei .
-Swap sites for Mobinl operator from Alcatel to Huawei .
-Impelmentation 3G Huawei for Etissalat .
-New and Swap Links for Vodafon with diametar (0.3, 0.6, 0.9) RTN 980, 950, 910, 610.
access with full technical knowledge of the installation & links
-commissioning procedures in most of Huawei® BTS outdoor and indoor types such as BTS (3900, 3012, 312, APM30H).
- Professional access with full technical knowledge of the installation & links commissioning procedures in NEC® DMR 5000S microwave system.