mohamed hanafy, Technical  office manager

mohamed hanafy

Technical office manager

Gas Chill

Location
Egypt - Cairo
Education
Master's degree, Mechanical Power Engineering
Experience
16 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 11 Months

Technical office manager at Gas Chill
  • Egypt - Cairo
  • My current job since January 2011

• Design MEP system for estimation and bidding
• Making pre-qualification documents, both standards as well as project specific questionnaires
• Prepare construction cost estimates with respect to scope accuracy.
• Review subcontractors offer and deriving the most economical cost estimation including developing of cost loaded programs, cash flow and Manpower Histogram
• Proactively review the tender techno commercial clauses
• Pricing of Variation claims, evaluation with Main Contractors/Project Managers and Finalization of Variation Orders (VO)
• Responsible for the proper execution and implementation and maintenance of the MEP works.
• Estimate and scope MEP trades during pre-construction
• Effective implementation of contract terms, financial and commercial aspects of the project.
• Implement Master Schedule/Micro Schedule including, Resource Planning & Tracking logs for various activities, Project and People Management, Final Verification of bills certified by QS Staff, Stake Holder’s Management, Risk Management, Procurement, Value Engineering and Life Cycle Costing
• Develop and administer the projects budgets and control the expenditure to ensure the budgeted profit is achieved.
• Liaise and coordinate with third party contractors in order to ensure that schedules of shop drawings and programs of work are properly communicated, operating procedures and standards are adhered to and the work of multiple contractors is properly coordinated.
• Instigate the project planning and review of progress against targets set.
• Control the value engineering, design, sub-contractor and material selection.
• Prepare Monthly Construction report to be submitted to management.
• Check Construction planning documents to anticipate any future problems and set up Plan for preventive and contingency measures.
• To plan, identify and manage the deployment and utilization of appropriate resources (equipment, people, subcontractors, materials and methods) to execute the works and achieve or exceed programmed requirements.
• Supervise the preparation Final Construction report at the time of project close out.
 From 2013 to 2015

POSITION: Technical office manager
 Duties and Responsibilities:
• Estimate and scope MEP trades during pre-construction
• Review Contract Documents, making suggestions/modifications as they relate to the MEP trades.
• Manage and lead MEP subcontractors throughout duration of the project
• Review and approve material and equipment for MEP systems prior to installation
• Monitor the installation and start-up of MEP systems and commissioning of project with Engineer & Owner
• Coordinate activities, materials procurement and other related activities with Project Manager and Field Staff
• Communicate progress and prepare appropriate reports as needed
• Take overall responsibility for the performance of all MEP trades
• Supervise review and coordination of submittals and shop drawings
• Deliver all warranties, as-built and training to the owner.
• Manage all requisitions and payments including lien releases and project payroll and maintains best possible cash flow throughout the project, communicating issues proactively
• Attend all schedule and management MEP meetings necessary to monitor and manage the project, chairing as appropriate
• Maintain and manage all purchase and delivery schedules, change order processes, shop drawings, document control logs.
 From 2011 to 2013
POSITION: Senior Mechanical Engineer.
COMPANY: Cooling Technology By Natural Gas-GAS CHILL (EKH) CO.

PROJECT: Cairo Festival City- District cooling plant (27500 TR -Hybrid (Electric, Absorption Chiller)
MAIN CONTRACTOR: CARILLION.
CONSULTANT: SHAKER.

 Duties and Responsibilities:
• Execution of the project by providing necessary leadership and drive to ensure safe completion within time and cost constraints.
• Monitoring, coordinating, and supervising of the daily works activities.
• .

at International real estate services company
  • Egypt
  • November 2009 to December 2010

From 1/11/ 2009 to 30/12/2010
International real estate services company (IRES)
HELIOPOLIS, CAIRO, Egypt

Designopolis
Coordinate with all concerned parties
owner, consultant and contractors
- Coordination with tenant from hand over till soft opening. - Review of drawings (tender, shop, coordination and as-built drawings) based on Specification and consultant's requirements
- Review all contract and payment for contractors
- supervise all mechanical work (HVAC, fire fighting, plumbing) on site.
- Review drawings, materials and submittals.

1- housing and development Bank at Integrated Consulting Group
  • Egypt
  • January 2008 to October 2009

From 1/1/ 2008 to 30/10/ 2009
Integrated Consulting Group (ICG)

Cairo
1- housing and development Bank


ELMAADI
2- Wade el Nile club

Sharm El sheikh
Oriental Nabq 3-Sun beach Village & Resort


NEW Cairo
1- housing and development Bank
HURGADA
2- High Gate

• supervision
510 TR HVAC (chilled water system), Ventilation System, firefighting, plumbing and sewerage
DX central air conditioning system, Ventilation System
DX central air conditioning system, Ventilation System, Building type Ducted split units, firefighting, plumbing and sewerage, networks of waste water, water, Irrigation, lift station, Desalination station, swimming pool
Design Engineer
1- 600 TR HVAC (chilled water system),
2-Building type Ducted split units
Main building Chilled water system 600 TR

From 1/5/ 2005 to 30/12/ 2007

at Remekiko masr co
  • Egypt
  • October 2004 to April 2005

From 1/10/ 2004 to 30/4/2005
Shams Company

Arab Contractors with Cairo branch (Remekiko masr co.)

Sharm El sheikh 1-paradise
2-Aida hotel

3-HAYA Village& Resort.
4-El Baron Resort
Cairo 6 October city
1-PLATO Restaurant
2- Rashidy elmizan factor
3- over 20 VIP Villa
Cairo
Nabila hotel

1-Cairo
( toukh- Qalubia
2- Qalubia
3- AGHOOR EL KOPRA- Qalubia

site Engineer
Building type Ducted split units
Main building Chilled water system
Gust rooms - split System

Villa type 9 - Ducted split units
Villa type 13 - Ducted
split units
Villa type 14 - Ducted split units
split units
DX central air conditioning system, Ventilation System
DX central air conditioning system

Ducted split units
Ducted split units

networks of waste water networks of waste water

networks of waste water

Education

Master's degree, Mechanical Power Engineering
  • at Cairo University
  • March 2017

MSc: Master of science Department: Mechanical Power Engineering University: Cairo Thesis Title: Distribution system analysis and economic evaluation of district cooling systems

Specialties & Skills

Project Management
Excavation
Technical Support
MEP Tander
HVAC Design
AIR CONDITIONING
ANALOG SILICON
CHILLED WATER
DESIGN ENGINEER
ENGINEER
IRRIGATION
PLUMBING
Fire Fighting
District Coolling Systems
Technical Office
sewage system

Languages

English
Expert

Memberships

PMI(PROJECT MANAGEMENT INSTITUTE)
  • 3165990
  • July 2014

Training and Certifications

PMP (Training)
Training Institute:
AUC

Hobbies

  • التعليم والكورسات فى ادارة الأعمال
    الحصول على درجة الماجستير فى العلوم . الحصول على كثير من الكورسات فى ادارة الأعمال