site engineer
QD-SBG Construction
مجموع سنوات الخبرة :9 years, 7 أشهر
Lusail Plaza Infra-structure, an execution Project Infra-structure, Under Pass Roads, Tunnel,
Car park, Metro Station (LRT Station) and Landscape
i. Responsibilities: Site supervision for concrete and steel works (Raft Foundations & walls), Execution of carpark underground, tunnel concrete walls and slabs, road ramps, metro station structural wok and finishing fit-out execution of form works with DOKA and RMDK, also Raft foundations with Qty. Min. 2000 cm3 per week, also following tests and civil work such as (Bore holes, water proofing spray membrane & PVC T-Lock, plate load tests), also with finishing activities after concrete pouring. Project was Under PMC (Parsons) and Supervision Consultant (Dorsch Qatar),
Project budget: 5 billion QR
The work was high building
Piles on a machine implementation of the CFA and steet pile and isolated footing, combined footing, strap beam, shallow foundation and flat slab, solid slab, hollow block, columns, beam, and finishes and paint work and Plumbing and electrification works and implementation of destinations and full implementation of insulation.
Do all finishing work alike And installation of doors and windows and paint work and the installation of air-condition and floors insulation and lighting works and marble and do all work for decoration
Do all Quantity Survey for concrete and steel
Work to compaction the soil every 20 cm and calculate the amount of water and soil tests Sand cone and soil as a result of receiving 95% of the Proctor
Then do Raft and test of concrete Do precast concrete beams
Chack all level by total station
The implementation of the columns and chack steel
The implementation of flat slab thickness 25cm and hollow block And do Isolation for raft