محمد كريم, Deputy Commercial Manager

محمد كريم

Deputy Commercial Manager

ACE Project Management (Moharram - Bakhoum)

البلد
مصر - القاهرة
التعليم
دكتوراة, Design and Environmental Planning Department.
الخبرات
16 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 11 أشهر

Deputy Commercial Manager في ACE Project Management (Moharram - Bakhoum)
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ يناير 2015

1.Project: 18 luxuries Residential Projects.
Company ACE - Project Management.
Company Role Project Management Organization
Project Description
http://www.pm.ace-mb.com/

Job Responsibilities:

• Working as a Deputy Commercial Manager in a Central Team managing and controlling 18 luxuries Projects.
• Establishing Enterprise Monitoring System for Projects.
• Preparation and revision of project contracts.
• Establishing Enterprise Monitoring System (EPM) and Dashboards for all projects;
• In collaboration with Project managers and construction managers, develop and maintain all processes, templates and standards for functional areas in the Projects “Technical office, Controls department and Site management”;
• Determine the frequency and content of progress reports, analyze results, and troubleshoot problem areas;
• preparing projects cost plans.
• Preparation and revision of feasibility studies;
• Projects Cost Estimation.
• Make auditing on projects to determine critical issues and concerns can parry the project goals and objectives;
• Managing all stakeholders throughout the project lifecycle against KPIs to monitor performance and ensure service levels are maintained in line with business requirements;
• Managing tender phase starting from preparing tender package till awarding.
• Tracking project developments to ensure overall quality of deliverables, adherence to project time lines as well as financial bottom-lines.
• Provide high level management on progress periodically.

Account Manager في ACE Project Management (Moharram - Bakhoum)
  • مصر - القاهرة
  • سبتمبر 2014 إلى يناير 2015

2.Project: Mountain View I.
Company Role: Project Management Organization
Project Description:
 A 360 million projects.
 Owner : Mountain View.
 Project Manager : DMG - PMO
 Architect : DMA.
 Consultant: Arab Consulting Engineers (Moharam / Bakhoum).
 Main Contractors: DMC.
http://www.ace-consultants.com/project-management.htm
http://www.mountainviewegypt.com/projects/east-cairo/MVI/

Job Responsibilities:

Project Coordination:

•Maintain a continuing review of the progress of the contracts.
• Gather and compile data essential to the administration of contracts.
• Conduct investigations and inquiries into contract problems
• Report on weekly, biweekly & monthly basis to the PM the actual percentage of completion.
• Lead weekly progress meetings to discuss the actual progress of work.
• Supervision of the works and coordination between all parties and work trades as the owner, consultants and contractors.
• Supporting management to take vital decisions at the right timing.

Communication Management:

• Attending weekly meetings with owner representative and high level management;
• Replying on all PMO's correspondences according to contract's provisions;
• Preparation of project presentations for high level management meetings;
• Reviewing the monthly reports prior issuance to the municipality.

Procurement / Purchase Orders:

• Compile data about project needs and classify these needs into standard criteria.
• Check the requirements of project specifications and its conformity with the needed items.
• Contact with suppliers/contractors to obtain offers for the desired items.
• Compare the offers provided by the suppliers/contractors from the technical point of view and assure the compliance of each offer with the project specifications.
• Compare the financial offers of the bidders who are technically accepted.
• Negotiate with bidders in order to amend their offers to complete the requirements or reduce the offer prices.
• Issue purchase order to the successful bidder and finalize the subject.
• Follow up of the ongoing orders and expedite the delivery of the ordered items.

Project’s Control Manager في ACE Project Management Moharram - Bakhoum
  • مصر - القاهرة
  • سبتمبر 2012 إلى سبتمبر 2014

3. Project: Mountain view projects (Giza Plateau, Katameya Residence, Ras El Hekma, Hyde Park and October Park).
Company Role: Project Management Organization
Project Description:
 A 4 billion projects.
 Owner : Mountain View.
 Project Manager : DMG - PMO
 Architect : DMA.
 Consultant: Arab Consulting Engineers (Moharam / Bakhoum).
 Main Contractors: DMC.
http://www.ace-consultants.com/project-management.htm
http://www.mountainviewegypt.com/

Job Responsibilities:

• Develop, Manage and Monitor project controls effort (planning/scheduling and cost analysis) for a large, complex and demanding construction program, including time management and cash flow forecasting for multiple projects.
• Evaluate, and forecast Program's performance, against an established Baseline with critical milestones.
• Interface with staff and stakeholders, attend regular meetings, and provide statistical reports to project managers and management staff.
• Meeting cost reporting commitments, assessing costs, forecasts and trends against approved cash flow.
• Assisting in the commercial and time impact evaluation of the contractor’s variation orders and claims.
• Issuing a weekly & a monthly cost progress monitoring report for all tender packages in the project containing payments progress, cash flow charts for on-going tender packages & the estimated cost charts for pre-contract packages.
• Prepare complete architecture bill of quantities for projects with an accurate quantities based on shop/design drawing.
• Pricing bill of quantities based on updated market rates.
• Check the requirements of project specifications and its conformity with the needed items.
• Check take-off documents for remeasured items submitted by the contractor.
• Process interim statement from the contractor and prepare interim certificate.
• Review submitted variations by contractor (entitlement, cost components, etc...)
• Negotiate with the contractor on the submitted variations to reach an agreement.
• Studying, analyzing & evaluating Notices of Non-Compliances submitted by the consultants

Project controls Engineer في ACE Project Management (Moharram - Bakhoum)
  • مصر - القاهرة
  • أكتوبر 2011 إلى سبتمبر 2012

4. Project: Garden Hills Project.
Company Role: Project Management Organization
Project Description:
 A 250 million project, Consists of 403 residence building, Mall, service area's & Office towers. Medical Center & Health. Infrastructure & Underground parking.
 Owner : The Egyptian Arab company .
 Project Manager : Arab Consulting Engineers (Moharam - Bakhoum)
 Architect : Shehab Mazhar .
 Consultant: Sabour Group.
 Main Contractors: 18 difference contractors.
http://www.ace-consultants.com/project-management.htm
http://www.gardenhills-eg.net/

Job Responsibilities:

• Preparing/Monitoring Project Master Schedule under the guidance of the Project Controls Manager;
• Study time and cost claims;
• Responsible for reviewing and ensuring that the invoices comply with the provisions of the Contractor/Owner Agreement;
• Cost evaluation & Cost Control for all project activities;
• Reply for all correspondences (Incoming & Outgoing) for owner, consultant and contractors;
• Responsible for the co-ordination of input for the preparation of progress reports and for ensuring that the report is a true reflection of status reported;
• Monitoring the budget and prepare quarterly & half-yearly review P&L vs Budgeted P&L;
• Prepare complete architecture bill of quantities for projects with an accurate quantities based on shop/design drawing.
• Pricing bill of quantities based on updated market rates.
• Process interim statement from the contractor and prepare interim certificate.
• Negotiate with the contractor on the submitted variations to reach an agreement.

Project Controls Engineer في ACE Project Management (Moharram - Bakhoum)
  • مصر - القاهرة
  • يونيو 2007 إلى أكتوبر 2011

5. Project: City Stars Project.
Company Role: Project Management Organization
Project Description:
 A 900 million $ project; with an area of 119800 m², and Consists of a five stars Hotel (Intercontinental) and four stars Hotels (Holiday Inn & Meridien). Commercial center which Includes 13 Cinemas, Bowling Center, Hyper Market and Theme Park). & Residential / Office towers. Medical Center & Health Club (Including Gymnasium & Swimming Pools). Infrastructure & Underground parking in a total of 17 buildings.
 Owner : Golden Pyramids plaza Co.
 Project Manager : Arab Consulting Engineers (Moharam - Bakhoum)
 Architect : Cassia & Associates.
 E / M Consultant: Shaker Constancy Group.
 Main Contractor Phase I: Consolidated Contractors Company (CCC), Orascom JV & Shuttering.
 Main Contractor Phase II: DEPA hotel interiors, ENCO & Siemens.
http://www.ace-consultants.com/project-management.htm
http://www.citystars.com.eg/

Job Responsibilities:

• Check take-off documents for remeasured items submitted by the contractor.
• Process interim statement from the contractor and prepare interim certificate.
• Agreement of the rate breakdowns for interim payments.
• Review submitted variations by contractor (entitlement, cost components, etc...)
• Negotiate with the contractor on the submitted variations to reach an agreement.
• Studying, analyzing & evaluating Notices of Non-Compliances submitted by the consultants.
• Attending daily post-work meetings with the Site Manager to keep him informed of progress;
• Resolving contractual and commercial problems
• Ensuring that the financial aspects and impact of a contract are clear to all parties
• Prepare complete architecture bill of quantities for projects with an accurate quantities based on shop/design drawing.
• Pricing bill of quantities based on updated market rates

الخلفية التعليمية

دكتوراة, Design and Environmental Planning Department.
  • في Cairo University, Egypt.
  • مايو 2017

working on the thesis-. “CONSTRUCTION MATERIALS WASTE MANAGEMENT AND ITS IMPACT ON SUSTAINABILITY CONCEPT” the aim of the thesis is to reduce project budget and energy consumption by decreasing waste in construction phase.

ماجستير, Design and Environmental Planning Department.
  • في Cairo University, Egypt.
  • أبريل 2013

Dissertation project “Towards a framework for the integration of natural and industrial ventilation and application of sustainability elements in public buildings” Practical studied include Studied City Stars mall interior ventilation and using architecture elements to convert it to natural ventilation.

بكالوريوس, Architect Engineering
  • في Modern academy, Egypt
  • يوليو 2007

Specialties & Skills

Management
Real State
Construction & Property
Control

اللغات

الانجليزية
متوسط

التدريب و الشهادات

PRMG (الشهادة)
تاريخ الدورة:
June 2013
صالحة لغاية:
January 9999

الهوايات

  • Reading, Athletics, Gym, Shopping, Communicate with different cultures, Craftworks and Philanthropy