Sr. Projects Manager
Canal Co. For Electricity Distribution
Total years of experience :34 years, 3 Months
Technical Affair Sector, Technical Review & Protection Department, Testing Department Manager
1. Review Electrical Equipment’ Technical Specification.
2. Committee Member for studying & issuing “Electrical Equipment Technical Specifications”
3. Committee Member for Check, Factory Test and Handing over All Transformer types.
4. Electrical Equipment’ tendering member for checks and analyzing.
5-Testing Department Manager' duties
1. Responsible for safe delivery of project to all constrains, such quality, schedule, risk and cost.
2. Manage project teams & activities from project initiation, design, execution, control and closing.
3. Providing leadership to internal project stakeholders.
4. Manage the project costs and create monthly reports, including profit/ loss.
5. Maintaining customer relationship to achieve long term retention and satisfaction.
6. Reporting project progress to a project ‘sponsors.
7. Promptly QHSE compliance at every opportunity.
8. Issuing Purchase Orders after, technical’ approval & financial comparisons and negotiations.
9. Coordinating personnel and managing subcontractors.
10. Identifying project risks and planning with appropriate people to resolve them.
11. Responsible for project definition, process management, documentation and resource allocation.
12. Utilizing my practical construction’ experiences relocating to site -after successfully completing engineering phase-for following up site construction activities, support construction team and solving site issues.
Both Projects were successfully energized at TIME.
ThyessenKrupp-Xervon (EGY)
PDH-PP (Port Said.-Egypt) Petrochemicals
TCI-Sanmar (Port Said.-Egypt) Petrochemicals
1. Initiates, manage & follow up the electrical erection teams & their activities (Transformers, MV switchgears, LV Panels, MCC, Cables pulling, Cables trays, Workshops & LC.) (PDH-PP)
2. Initiates & follow up Instruments erection, test, commissioning and loop check teams & their activities. (TCI)
3. Issue the erection punch list and follow up. (PDH-PP/TCI)
4. Follow up the Instruments installations activities. (PDH)
5. Arrange, handle and follow up the I CAPS & teams. (PDH)
6. Contribute the Weekly Construction Meeting. (PDH-PP/TCI)
7. Contribute the Daily site Meeting. (PDH-PP/TCI)
8. Check up the project time schedule. (PDH-PP)
9. Issue the monthly progress invoices and reports. (PDH-PP/TCI)
10. Issue the monthly stores reports & requests. .(PDH-PP/TCI)
11. Initiates & Interview the new staff.
12. Check monthly site cost control.
13. Negotiates with subcontractors.
1. Check up the erection activities (transformers, MV switchgears, LV &LC panels).
2. Site construction advisor (onsite technical support).
3. Issue the erection punch list and follow up.
4. Issue the pre-commissioning activities.
5. Attended the startup activities.
6. Issue engineering comments and TQR.
7. Issue and did modifications for MV and LV switchgears.
8. Contribute the Weekly Construction Meeting.
9. Contribute the Daily site Meeting.
10. Checkup offshore punch list and start up.
Greatest Manmade River (Sluq-LIBYA), 319 &318Projects.
1. Check up the erection activities (Transformers, MV Switchgear, LV Panels, MV Pumps, cables & SCADA panels).
2. Commissioning the Low voltage networks, Switchgear, Main Incomers, etc.
3. Preparing to commission Medium Voltage Switchgear.
4. Energizing the whole pump station (MV and LV), Start up and put into service all loads.
5. Maintenance and trouble shouting for the old pump station.
6. Issue the maintenance manual for old pump station (11 and 3.3KV switchgears).
7. Issue and did modifications for MV and LV switchgears.
8. Operation and maintenance of pump station.
9. Contribute the Daily and Weekly Construction Meetings.
10. All project manager’ tasks for Project, 319.
(Mission) Instrumentation & Automation
Main areas of responsibilities:-
1. Check up the erection activities.
2. Lead a team for checking and testing.
3. Check and test the Automation systems.
4. Issue the Acceptance protocol from the point of view for Instruments and Automation.
5. Issue and follow up the Punch List items.
6. Issue a few Automation modifications.
7. Contribute the Weekly Construction Meeting with the construction companies.
Main areas of responsibilities:-
1. Responsible for safe delivery of project to all constrains, such quality, schedule, risk and cost.
2. Manage project teams & activities from project initiation, design, execution, control and closing.
3. Providing leadership to internal project stakeholders.
4. Manage the project costs and create monthly reports, including profit/ loss.
5. Maintaining customer relationship to achieve long term retention and satisfaction.
6. Reporting project progress to a project ‘sponsors.
Page 3 of 5/ku19/9
7. Promptly QHSE compliance at every opportunity.
8. Issuing Purchase Orders after, technical’ approval & financial comparisons and negotiations.
9. Coordinating personnel and managing subcontractors.
10. Identifying project risks and planning with appropriate people to resolve them.
11. Responsible for project definition, process management, documentation and resource allocation.
12. Contribute the Weekly Construction Meeting with the project ‘sponsors.
13. Contribute the Weekly T&C Meeting with the project ‘sponsors, including modification.
14. Handing over safely& at time with all constrains.
Greatest Manmade River (Sluq-Libya)-LIBYA), 319 &318Projects.
1. Check up the erection activities (Transformers, MV Switchgear, LV Panels, MV Pumps, cables & SCADA panels).
2. Commissioning the Low voltage networks, Switchgear, Main Incomers, etc.
3. Preparing to commission Medium Voltage Switchgear.
4. Energizing the whole pump station (MV and LV), Start up and put into service all loads.
5. Maintenance and trouble shouting for the old pump station.
6. Issue the maintenance manual for old pump station (11 and 3.3KV switchgears).
7. Issue and did modifications for MV and LV switchgears.
8. Operation and maintenance of pump station.
9. Contribute the Daily and Weekly Construction Meetings.
10. All project manager’ tasks for Project, 319.
BENTINI Construzioni S.p.a (LIBYA)
Mellitah Gas Plant (Western Libya Gas Plant)-LIBYA
1. Issue, manage & follow up E&I Installation activities (transformers, MV switchgear, LV panels, cables & fire systems).
2. Issue the time activities schedule.
3. Issue the daily, weekly and monthly Reports.
4. Issue and Control the monthly Progress.
5. Issue and Control the working Plan.
6. Contribute the Weekly Progress Meeting (SNAMPROGETTI)
7. Control the Working Activities.
8. Contribute the Weekly Internal Construction Meeting.
9. Issues & check the change orders.
10. Issues the stores requests.
Power Station
750 MW Combined Cycle Project-Cairo-Egypt
1. Follow up & Checkup the installation activities, GIS, Power Transformers, MV SWGR, Load Centers, MCC, Low
current, ..etc.
2. Commissioning activity concerning GIS, Main and Aux. Power Transformers, M. V .Switchgears, L.V. Load Centers,
Protection and MCC.
3. Attending the daily start-up meeting for reporting the current activities and cooperation between other contractors.
4. Attending the weekly chairman meeting for updating the activity schedule and works programs.
5. Attending the weekly Progress meeting for updating the activity schedule and works programs and solving the
present problems.
6. Schedule and managing the works activity program.
7. Studying and giving a technical solution for mall designed items such as (Transformer protection system
arrangement and DC system configuration).
8. Startup activity for all equipment, motors, panels…. etc.
9. Trouble shouting during reliability runs periods.
10.Calibrations of all instrumentations devices.
Industrial Solution & Services
E.G.METAL IND. site-Ismailia-free zone
1. Issue, manage & follow up E&I Installation activities (transformers, MV switchgear, LV panels, Cables (MV&LV),
fire systems & LC).
2. Issue the daily, weekly and monthly Reports.
3. Issue and Control the monthly Progress.
4. Issue and Control the working Plan.
Page 4 of 5/ku19/9
5. Contribute the Weekly Progress Meeting.
6. Control the Working Activities.
mission)
HEBI for pharmaceutical raw materials (Qena free zone- Egypt) Construction manager/ Commis. & Start up manager
Main areas of responsibilities:-
1-Testing and putting into service the medium voltage switchgear and all related protective device and relays.
2-Testing and putting into service the motor control center (MCC), (110 V DC. Battery, Battery charger and UPS),
protection relays & alarm for main, aux. and starts up power transformers.
3-Loop check for all pneumatic & motorized boiler valves.
4-Testing and putting into service the medium voltage switchgear (ABB type) and all related protective devices
and relays.
5-Testing and putting into service the low voltage switchgear and all related equipment.
6-I was in mission to test and putting into service the protection relays, CTs...Etc.-for Unit #1.
Also, testing and putting into service all motorized and pneumatic Boilers valves and interface with DCS system.
Main areas of responsibilities:-
1-Maintenance engineer for the medium and low voltage networks in King Saud University.
2-Maintenance engineer for the medium and low voltage networks and site equipment in Waste Water treatment
plant, Tower pump station & raw water treatment plant for the National Guard project
-Maintenanace engineers for medium & low voltage networks.
2-Member of committee for check and test the electrical equipments (kiosks, switchgear, cables (low & medium), RMU, .etc.).
3-Member of committee for making the technical specifications of the electrical equipments (Kiosks, Switchgear, cables…).
4-Testing for Cables, Kiosks & switchgears.
5-Determine the faulty cables - faulty cables van operator.
Main areas of responsibilities:-
1-Maintenance and operation engineer for Nwebaa Diesel power station-South Sinai (3x3.2 MW).
2-Training in gas power station (1x28MW-Ismailia gas station
company-in Ismailia
University Banha-branch. Power & electrical machines - May1988 (General Grade: Good / Project: Very good; named: Control of power system by Using microprocessor)
URL removed due to policy violation. Please contact support for further information.