Field Operations
sofupes international
مجموع سنوات الخبرة :3 years, 7 أشهر
* Control and monitoring of process parameters.
* MCP control different wells.
* knowledge of process (TARFA, BAGUEL and EL FRANING) especially El Franig process (analyze and solve the problems of this process).
* Good handling on the compressor CAR1000, CAR800, ajax and DRESSER (start + stop, start after shut down).
* Control and makeup water cooling, engine oil and compressor oil .
* Control and extra injection of chemicals (methanol + ROMEX) with good knowledge side winder pump.
* control and following the transfer of condensate per triplex pump.
January-June 2015:
• PERENCO FIELD: Concession TARFA-BAGUEL:
-Optimizing production
-Safety ensuring in the field and cordination with all team members during production operations and the installation of process station.
Agust 2012-December 2014:
• OMV FIELD Concession ANAGUID - SOUTH TUNISIA Well Testing:
- Preparation of Project Data Book (Equipments datasheet, Certificates, Drawings and Inspection & Test Report).
- Installation, Start up, Clean up, O&M.
-Checking all running equipment, Logs process parameters and reporting abnormalities.
- Changes over running equipment as and when required.
- Cordination with the control room operator for startup, shut down and normalizing of the plant.
-Following up activities, and ensuring a high level of safety on the plant and the Field.
-Checking each signed work permit at the site and ensuring that the jobs are performed safely in accordance with procedures.
-Optimizing production.
-Reporting to the FPW.
• OMV FIELD (WAHA OFFLOADING FACILITY):
Preparation of project Data Book, Installation.
• First year: Relationship-structuring process,basin fill,Tectonic settings and types of basins,petroleum systems,Geochemistry world oil,exploration geophysics,flow in porous media and cracks,Petrophisics of Reservoir Rocks,Well seismic,Logging and imaging wall well,Drilling techniques and equipment,Drilling fluids and cementing,engineering of Reservoirs,simulation of reservoirs. • Second year: Architecture(Well Design) and equipements,Drilling operations,Well completion and Well test,Well interventions/Work Over,Production(Well exploitation),Activation systems(sucker rod,ESP,Jet pump,artifcial lift...),Site safety and equipements,Environmental impacts,Wast treatments,Simulation reservoirs,Enhanced oil recovery(EOR).