Mohamed mahfouz GHONEMY      PMP, MEP Projects Manager

Mohamed mahfouz GHONEMY PMP

MEP Projects Manager

Egyptian Union for Construction

Location
Egypt - Cairo
Education
Master's degree, بكالوريس هندسة ميكانيكا قوى
Experience
15 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :15 years, 11 Months

MEP Projects Manager at Egyptian Union for Construction
  • Egypt - Cairo
  • My current job since March 2023
Project Manager Infrastructure at Egyptian Union for Construction
  • Egypt - Cairo
  • June 2022 to March 2023
MEP Project Manager at hassan Allam construction
  • Egypt - Cairo
  • June 2021 to June 2022
MEP Project Manager at GAMA CONSTRUCTION
  • Egypt - Cairo
  • November 2017 to June 2021

Projects:
1-German school in Mivida- EMMAR MISR :
a-Fire fighting network.
b-HVAC systems.
c-plumbing& water supply system.
d-Infrastructure networks for Buildings.


Activities performed:
1-preparing shop drawing
2-Q.S for all items (pipes-valves-fitting….etc.)
3-Preparing the invoices.
4-Q.C for inspection request.
5-All Technical Office work.
6-Handing all mechanical works to the Consultant.
7-Preparing AS BUILT Drawings.

Team leader MEP Projects ENGINEER at GAMA FOR CONSTRUCTION
  • Egypt - Cairo
  • August 2016 to November 2017

Projects:
1-Facilities Management(FM Buildings) for Mivida- EMMAR MISR :
a-3 buildings with 3 floors for each.
a-Fire fighting network.
b-HVAC systems.
c-plumbing& water supply system.
d-Infrastructure networks for Buildings.

2-Infrastructure networks for service road Mivida- EMMAR MISR :
a-Fire Fighting 600 meter pipe length
with 4 fire hydrant
b-Sewer (7 manhole 1.2 m diam., 500 meter pipe length, 8 sewer H.C )
c-Irrigation Systems 400 meter pipe length.
d-Water supply.500 meter pipe length, 2 valve chambers.
e-Storm network 400 meter with 6 manhole.

3-Infrastructure networks for parcel #19 Mivida- EMMAR MISR :
a-Fire Fighting 2000 meter pipe length.
with 25 fire hydrant
b-SEWER (57 manhole 1.2 m diam., 1500 meter pipe length, 202 sewer H.C )
c-Irrigation Systems 2000 meter pipe length.
d-Water supply.2000 meter pipe length, 4 valve chambers.
e-Storm network 1500 meter with 30 manhole.

4-Construction of 202 villa semi fished
a-Mechanical Work Plumbing (drainage, water supply, rain drainage, Inspection Chambers I.C)

Activities performed:
1-preparing shop drawing
2-Q.S for all items (pipes-valves-fitting….etc.)
3-Preparing the invoices.
4-Q.C for inspection request.
5-All Technical Office work.
6-Handing all mechanical works to the Consultant.
7-Preparing AS BUILT Drawings.

SR. MECHANICAL PROJECT ENGINEER at JET
  • Egypt - Cairo
  • April 2015 to August 2016

Projects:
1-Construction of 160 villa semi fished
a--Mechanical Work Plumbing (drainage, water supply, rain drainage, Inspection Chambers I.C)

2-Infrastructure networks for 160 villa semi fished :
a-Fire Fighting 2000 meter pipe length
with 8 fire hydrant
b-SEWER (27 manhole 1.2 m diam., 2500 meter pipe length, 160 sewer H.C )
c-irrigation Systems 900 meter pipe length
d- water supply.2000 meter pipe length, 3 valve chambers, 160 water H.C)
e-storm network 400 meter with 10 manhole

Activities performed:
1-preparing shop drawing
2-Q.S for all items (pipes-valves-fitting….etc.)
3-prepering the invoices.
4-Q.C for inspection request
5-all Technical Office work.
6-Handing all mechanical works to the Consultant

senior MEP Project Engineer at (DAR FOR CONSTRUCTION & TRADING(DETAC)
  • Egypt - Cairo
  • January 2014 to April 2015

MEP Engineer( Site Engineer, Technical Office Engineer, Q.C Engineer, QS Engineer) for following projects:

1-Infrastructure networks for 185 villa half fished :
a-Fire Fighting 2000 meter pipe length
with 23 fire hydrant
b- Plumbing (69 manhole 1.2 m dia., 2500 meter pipe length, 185 sewer H.C )
c-irrigation Systems 1900 meter pipe length
d- water supply.2000 meter pipe length, 9 valve chambers, 185 water H.C)
e-storm network 100 meter with 3 manhoule
2-Temparory Irrigation Lake &set of irrigation pump consist of 3 pumps with 3 Reservoir expansion.

Activities performed:
1-preparing shop drawing
2-Q.S for all items (pipes-valves-fitting….etc.)
3-prepering the invoices.
4-Q.C for inspection request
5-all Technical Office work.
6-Handing all mechanical works to the Consultant


Projects: 1- - Mivida Project •New Cairo. EMARR MISR

2-water tank 5000m3 with pump station
3-irrigation tank with pump station
Activities performed:
1-preparing shop drawing
2-Q.S for all items (pipes-valves-fitting….etc.)
3-prepering the invoices.
4-Q.C for inspection request
5-all Technical Office work.
6-Handing all mechanical works to the Consultant
Projects: 1- Tag sultan • Cairo. MNHD madint nasr for housing &development

MEP Project Engineer at -HASSAN ALLAM SONs CO.(main contractor)
  • Egypt - Cairo
  • June 2013 to January 2014

MEP Engineer (Site Engineer, Q.C Engineer) for following project:
1-Construction of 185 villa full finished -Mechanical Work Plumbing& HVAC.

Activities performed:
1-Implementation of all mechanical works
2-preparing the invoices.
3-Q.C for inspection request.
4- Handing all mechanical works to the Consultant.

Projects: 1-UPTOWN CAIRO •Mokattam.

MEP Project Engineer at ROWAN MODERN ENGINEER
  • Egypt - Alexandria
  • July 2012 to June 2013

MEP Engineer( Site Engineer, Technical Office Engineer at site)for following projects:
1-5000 m3/day Irrigation Tank& Pump Room(8 pumps with 2 vessel for water hammer ))
2-Civic centre (5 building with all service all mechanical work (fire fighting- HVAC-plumbing) full finished.

Activities performed:
1-Implementation of all mechanical works
2-prepering the invoices.
3-Q.C for inspection request.
4- Handing all mechanical works to the Consultant.

Projects: 1- Marassi • North Cost-Side Abd elrahman.EMARR MISR

MEP Project Engineer at PROSERVICE CO
  • Egypt - Cairo
  • July 2010 to July 2012

MEP Engineer( Site Engineer, Technical Office Engineer at site) for following project:
Renovation for all mechanical work in hotel(chilled water& condescending pumps with pipe network-water supply network with booster pumps- Drainage network with submersible pumps &Storm network -firefighting pipe network with fire pump room -BMS system

Activities performed:
1-Q.S for all items (pipes-valves-fitting….etc.)
2-prepering the invoices.
3-Q.C for inspection request
4-all Technical Office work.
5-Implementation of all mechanical works
6- Handing all mechanical works to the Consultant.

• Projects: 1- Le MERADIAN Heliopolis Hotel • Cairo

mechanical engineer at MISR Engineering Development (MEDCOM)
  • Egypt - Cairo
  • July 2008 to July 2010

excutive engineer at the site and follow the work of contractors, subcontractors and delivery of Consultant work and report daily to work and work invoice the company's own Department of Mechanics
Mechanical Engineer Responsible About HVAC, Fire Fighting and Plumbing.
 I'm working as Site Engineer on the following projects:
Project: Nile University• 6th of OCTOBER

Education

Master's degree, بكالوريس هندسة ميكانيكا قوى
  • at جامعة حلوان- المطرية
  • May 2008

B`

Specialties & Skills

Refrigeration and Air Conditioning
Drainage
Firefighting
AUTO CAD
CHILLED WATER
ENGINEER
OUTLOOK
POWERPOINT
CCP( certified cost professional)

Social Profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.

Languages

English
Expert

Memberships

نقابه المهندسيين المصريه
  • 61/785
  • July 2008

Training and Certifications

ACP (Certificate)
Date Attended:
September 2023
P3O (Certificate)
Date Attended:
May 2022
RMP (Certificate)
Date Attended:
September 2022
PMP (Certificate)
Date Attended:
March 2022

Hobbies

  • reading,watching documentary movies