Project Controls Engineer at SUEZ THERMAL POWER STATION
  • My current job since December 2014

Create Planning & Scheduling plan as part of the Project Controls Execution Plan and prepare critical path network plans for activities undertaken by engineering departments. Activities undertaken by these departments should be subsequently monitored against the plan and deviations should be identified to the appropriate Project Manager.
Analyze the programmers prepared by various contractors ensuring that activities contained therein comply with client requirements with emphasis on Critical Path Reporting and to forecast program risk events.
Coordinate the activities of the various contractors involved in a project, ensuring that the interfaces between various organizations are identified and scheduled.
Where contractor activity is at variance with the program , to identify appropriate remedial action to bring activity in line with the program. To operate the project management software (Primavera P6) utilized by the Project Management Services Group within the Generation Division.
Prepare detailed and comprehensive project reports giving information regarding the status ofactivities undertaken by the contractors and the consultant. To analyze contractors claims and report/advise accordingly.
Reporting, monitoring of milestone progress to the preparation of customer billing processes, etc.
Forecast manpower to complete according to project commitments and productivity.
Responsible for Project Controls to identify, as early as possible, any problems using techniques such as trending, and to provide potential solutions in order to mitigate impact to cost and schedule.

Project Controls Engineer at RELEVENT
  • September 2014 to December 2014

ODE (Offshore Design Engineering)
Is an International Engineering Contractor to the Oil, Gas
and Renewable Energy

Project Controls Engineer at TRIPLE P (OIL & GAS Solutions)
  • February 2014 to August 2014

Contract for four months on SHELL MASTER PLAN Project

ELECTRICAL ENGINEER at CB&I (Chicago Bridge & Iron)
  • September 2009 to December 2010

Performing lighting and small power design and layouts.
3D modeling of electrical equipment using PDMS, PDS
Electrical distribution sizing, layouts and scheduling.
Participating at electrical listing and MTO`s using Smart Plant Electrical (SPEL).
Working on hazardous area classification list, design plans and sections.
Working on heat tracing calculation.
Working on cable tray & trench calculation and design.
Lead a group of electrical designer to work on instrument wiring.

Activities at REFICAR Project :
Responsible for lighting calculation of unit 146 & 149
Performing lighting and small power design and layouts.
3D Modeling of electrical commodities using PDS.
Worked on project SLD`s, protection and schematic diagrams.
Lead a group of electrical designer to work on instrument wiring.

Activities at YAMAL Project :
Performing lighting and small power design and layouts.
3D Modeling of electrical equipment using PDMS.
Responsible of hazardous area classification (sources of release) list, And Design plans and sections.

Activities at OXY Project :
Performing lighting and small power design and layouts.
Working on heat tracing calculation.

Project Controls Engineer at CB&I (Chicago Bridge & Iron)
  • December 2010 to September 2010

Represent Project Management in client discussions with respect to all aspects of planning & scheduling, manpower forecasting, progress measurement and resource control.
Assisting the project disciplines to plan, align and schedule their respective scopes.
Responsible for setting up and maintaining communication within the Project Management team and with the disciplines in the Project team.
Create Planning & Scheduling plan as part of the Project Controls Execution Plan
Develop project master schedule to executable detailed logic network, level 3 schedule.
Study critical path, identify opportunities to improve work schedule, provide visibility of key drivers to meet project completion date.
Co-ordinate with design disciplines to assure smooth flow of engineering deliverables.
Monitor project progress and update schedules, analyze causes of deviation from baseline schedule if any, and propose recovery schemes.
Responsible for Project Controls to identify, as early as possible, any problems using techniques such as trending, and to provide potential solutions in order to mitigate impact to cost and schedule
Suggest corrective actions to ensure that projects remain on schedule/within budget, support PM in decision making.
Develop manpower histograms, project controls s-curves, and prepare monthly progress reports, performance analysis and resources graphics.
Establish a cost system on any type of project
Implement the cost control, progress, risk and scheduling procedures.
Represent Project Management in client discussions with respect to all aspects of cost management (assess bids; provide counter estimates, (assist in) building or countering claims, (assist in) negotiations).
Prepare a cost forecast at project completion based on an estimate-to-complete for the remaining work and registered expenditures & commitments.
Analyze project cost/quantity trending/progress data, forecast trends potential trend from this data, raise issues.
Provide cost input to and implement the cost element of change management procedure
Monitor the actual spent hours Vs planned man-hours.
Use physical progress to trend cost, based on earned value.
Developing and monitoring project actual and forecast cost.
Assist in the specification / development / selection of cost control tools, methods and best practices.
Prepare and implement project-wide cost measurement and reporting system, including roll-up levels and reporting cycle calendar.
Assist and prepare cost performance management data.

Projects:

GORGON Project
SPX Project
OXY Elk Hills Cryogenic gas plant Project
Cartagena Refinery expansion project
Cuddalore Refinery EPC Project

OPERATION ENGINEER at Activities
  • United Arab Emirates
  • January 2009 to September 2009

Projects

Education

Bachelor's degree, Engineering
  • at Helwan University
  • January 2008

Graduation Project : Electrical Distribution for a learning resource center. Grade : Excellent.

High school or equivalent,
  • at Elnozha Language School

Specialties & Skills

Project Management
Power Distribution
Lighting Design
3D MODELING
BUDGETING
CABLEADO
COMMODITIES
COST CONTROL
CUSTOMER RELATIONS
ENGINEERING
GRAPHICAL USER INTERFACE
SCHEDULING
UPGRADES

Languages

Arabic
Expert
English
Expert