Plant: Union Fenosa Gas (SEGAS) Plant at Damietta, Egypt (Liquefied Natural Gas -LNG)
Responsibilities:
As a senior mechanical maintenance engineer responsible for supervise and perform the mechanical preventive &predictive and corrective maintenance works for the static equipment in these scopes.
Maintenance repairing and overhaul for all valves types (Gate, Globe, Ball, Non return valve, Etc)
PRV & PSV and Pilot Operated Relive valve calibration.
Installing blinds for large diameter pipes 66”, 72”.
Apply hydrostatic and pneumatic test.
Good knowledge for using hydraulic torque wrench and bolt tension machine.
Loading Arm preventive and corrective maintenance.
Maintenance repairing and overhaul for all Heat Exchanger types (Shell & tube - Plate - Air fan coolers).
Tower maintenance and internal replacement (valve trays - bubble cap trays - packing)
New projects calculations ( Material take off, Dry cost, timing plan, and Method of statement and test package )
Good knowledge about standards: ASME, ASTM, DIN, BS, IN & TEMA for Heat exchanger
Identifying spare parts requirements..
Familiar with inspection tests (NDT) test.
Maintenance for Thermal insulation works (hot&cold) - foam injection machine.
Preparing reports and life book for equipment as required.
Implementation of ISO 9001, ISO 14001, OSAS 18001, Prepare risk assessment & Tool Box Talk.
Attended the following shutdowns as static equipment maintenance engineer:
SEGAS Plant (Liquefied Natural Gas production plant) August 2007.
SEGAS Plant November 2008.
SEGAS Plant shutdown ( Fractionation Area ) July 2009
SEGAS Plant (complete shutdown) July 2010.
Replacing the cold box at SEGAS site ( chart heat exchanger ) ( MAY 2012 )
As a piping& construction engineer responsible for preparing tender documentation then executing pipe lines and static equipments in these scopes.
Preparing the bidding tender documentation
Prepare dry cost, MTO, test package, Scope of work, method of statement and timing plan
Manage all site activities like welding, erection, inspection, fit up
Prepares the welding Maps & choose the most suitable points for Field weld joints.
Prepare daily reports for progress, manpower, and priority
Prepare Lifting and Installation plan for each level
Follow up the client procedure for Erection
Follow up all quality assurance and safety precautions on my site
Dealing with all type of drawing like Plot Plain, ISO, P&ID...etc
Prepare hydrostatic test for all test package if required
Complete all punch lists for all test package.
The major projects:
North of Sinai Petroleum Company (NOSPCO) at offshore TAO platform.
Installing of surface jet pump including its supporting structural modification as well as the fabrication and installation of the piping required to connect the surface jet pump to the existing slots of wells TAO 5, 6, 7 and the slot for the discharge line on the production Manifold.
Egyptian Liquefied Natural Gas (ELNG-IDKU).
- Fabrication and erection of fire fighting pipe lines
PETROBEL Company (El-gamil plant)
-Replacing 4 oil loading arms.
Suez Oil Petroleum Company (SOPC).
- Repairing for 6 loading arms at SOPC offshore platform.
United Gas Derivatives Company (UGDC).
- Installing 8 steel structure ladders.
-Installing foam generation piping & valves
- مجال الشركة:
- النفط والغاز
- الدور الوظيفي:
-
الصيانة والإصلاح والدعم الفني