Total Years of Experience: 19 Years, 8 Months
April 2017
To Present
CAD Design Supervisor
at PGESCo
Location :
Egypt - Cairo
Detailed Job Description:
• Responsible about establishment and follow up the implementation of the new AVEVA E3D platform at PGESCo
• Managing, Supervising and Leading the day to day activities inside the E3D admin team and report to higher management
• Submit the future work plan and arrange/ handle the pilot project preparations and activities
• Preparing the progress reports to meet the project time schedule
• Follow up the different activities with E3D admin team i.e. the creation of Piping catalogues and specifications and create the different company standard templates and reports as UG composite drawing, Piping GAs, Piping sketches, Piping Isometrics, MTO report
• Provide AVEVA E3D training courses for users (when needed)
Projects in which I participated as AVEVA CAD Supervisor:
• Lamlouda Power Plant, 500 MW Gas Turbine Project in Libya
• Responsible about establishment and follow up the implementation of the new AVEVA E3D platform at PGESCo
• Managing, Supervising and Leading the day to day activities inside the E3D admin team and report to higher management
• Submit the future work plan and arrange/ handle the pilot project preparations and activities
• Preparing the progress reports to meet the project time schedule
• Follow up the different activities with E3D admin team i.e. the creation of Piping catalogues and specifications and create the different company standard templates and reports as UG composite drawing, Piping GAs, Piping sketches, Piping Isometrics, MTO report
• Provide AVEVA E3D training courses for users (when needed)
Projects in which I participated as AVEVA CAD Supervisor:
• Lamlouda Power Plant, 500 MW Gas Turbine Project in Libya
November 2012
To March 2017
Plant Design Group Leader
at PGESCo
Location :
Egypt - Cairo
Detailed Job Description:
• Prepare piping routing design by SmartPlant 3D (SP3D) and Coordinate it with
Piping supports and pipe stress analysis teams.
• Development UG piping composite drawings, Plot Plans and GA's by SP3D Smart Sketch and MicroStation.
• Extracting AG/UG piping isometrics.
• Create required equipment at SP 3D‐Model.
• Extracting Material Take‐Off "MTOs" reports.
• Prepare piping study and tank nozzle orientation sketches and follow‐up the implementation with tank sub‐contractor.
• Coordinate UG piping utility systems and release periodic interference check report.
• Handling weekly 3D‐model review meetings with other disciplines (electric, civil, mechanical, etc.) to achieving the best physical design for the plant.
• Check and review issued mechanical specification, P&ID for every system.
• Prepare tenders layout and piping arrangement according to tender and piping specification.
• Assigned as PD Responsible Engineer (RE) for Water Treatment plant, Fire Fighting works, Fuel Gas works and Field erected Water/HFO/LFO tanks packages to check and Review Sub‐Contractors/Suppliers submittal documents and coordinate it with other plant Sub‐Contractors/Vendors and other different disciplines.
Projects in which I participated as a PD Group Leader:
• Baiji Power Plant, 1014 MW Gas Turbine Project in Iraq
• New Assiut Power Plant, 1000 MW Gas Turbine Project
• West Damietta Power Plant II, 500 MW Gas Turbine Project
• New Capital Power Plant, 4800 MW Combined Cycle Project
• Burullus Power Plant, 4800 MW Combined Cycle Project
• Prepare piping routing design by SmartPlant 3D (SP3D) and Coordinate it with
Piping supports and pipe stress analysis teams.
• Development UG piping composite drawings, Plot Plans and GA's by SP3D Smart Sketch and MicroStation.
• Extracting AG/UG piping isometrics.
• Create required equipment at SP 3D‐Model.
• Extracting Material Take‐Off "MTOs" reports.
• Prepare piping study and tank nozzle orientation sketches and follow‐up the implementation with tank sub‐contractor.
• Coordinate UG piping utility systems and release periodic interference check report.
• Handling weekly 3D‐model review meetings with other disciplines (electric, civil, mechanical, etc.) to achieving the best physical design for the plant.
• Check and review issued mechanical specification, P&ID for every system.
• Prepare tenders layout and piping arrangement according to tender and piping specification.
• Assigned as PD Responsible Engineer (RE) for Water Treatment plant, Fire Fighting works, Fuel Gas works and Field erected Water/HFO/LFO tanks packages to check and Review Sub‐Contractors/Suppliers submittal documents and coordinate it with other plant Sub‐Contractors/Vendors and other different disciplines.
Projects in which I participated as a PD Group Leader:
• Baiji Power Plant, 1014 MW Gas Turbine Project in Iraq
• New Assiut Power Plant, 1000 MW Gas Turbine Project
• West Damietta Power Plant II, 500 MW Gas Turbine Project
• New Capital Power Plant, 4800 MW Combined Cycle Project
• Burullus Power Plant, 4800 MW Combined Cycle Project
June 2011
To November 2012
Piping/Layout Designer & PDMS Administrator
at Kharafinational
Location :
Egypt - Cairo
Detailed Job Description:
• Prepare piping routing design by PDMS and support selection.
• Submission piping isometrics for every system AG/UG
• Create all equipment and steel structure required at plant 3D‐Model.
• Prepare tank nozzle orientation.
• Development piping arrangement, Plot Plans and GA's by draft module and AutoCAD.
• Coordinate all UG mechanical utility systems and electrical duct bank and release interference check report.
• Coordination with other disciplines (electric, civil, mechanical, etc.) to achieving the best physical design for the plant.
• Extracting Material Take‐Off "MTOs" reports, line and valve list.
• Handle 3D‐Model reviews with client personnel in attendance and be able to convincingly answer client queries.
• Coordinate with piping construction team to solve the construction problems.
• Prepare tenders layout and piping arrangement according to tender and piping specification.
• Handling all PDMS Admin activities (New projects creation, create the teams, users, DB, MDB and set the access control for different users)
• Create project Backing Sheets and Overlays, Label Libraries and any other required by Draft Admin and Iso Draft Admin modules.
• Create piping Catalogue and Specifications for project.
Projects in which I participated at Kharafinational Co.:
• West Damietta Power Plant, 500 MW Gas Turbine Project
• El‐Shabab Power Plant, 1000 MW Gas Turbine Project
• Az‐Zour South Power Plant in Kuwait (Tender preparation)
• Sabyia Power Plant in Kuwait (Tender preparation)
• Prepare piping routing design by PDMS and support selection.
• Submission piping isometrics for every system AG/UG
• Create all equipment and steel structure required at plant 3D‐Model.
• Prepare tank nozzle orientation.
• Development piping arrangement, Plot Plans and GA's by draft module and AutoCAD.
• Coordinate all UG mechanical utility systems and electrical duct bank and release interference check report.
• Coordination with other disciplines (electric, civil, mechanical, etc.) to achieving the best physical design for the plant.
• Extracting Material Take‐Off "MTOs" reports, line and valve list.
• Handle 3D‐Model reviews with client personnel in attendance and be able to convincingly answer client queries.
• Coordinate with piping construction team to solve the construction problems.
• Prepare tenders layout and piping arrangement according to tender and piping specification.
• Handling all PDMS Admin activities (New projects creation, create the teams, users, DB, MDB and set the access control for different users)
• Create project Backing Sheets and Overlays, Label Libraries and any other required by Draft Admin and Iso Draft Admin modules.
• Create piping Catalogue and Specifications for project.
Projects in which I participated at Kharafinational Co.:
• West Damietta Power Plant, 500 MW Gas Turbine Project
• El‐Shabab Power Plant, 1000 MW Gas Turbine Project
• Az‐Zour South Power Plant in Kuwait (Tender preparation)
• Sabyia Power Plant in Kuwait (Tender preparation)
June 2010
To May 2011
Piping/Layout Designer & PDMS Administrator
at CB&I Lummus
Location :
Egypt - Cairo
Detailed Job Description:
• Prepare the plant piping routing design according to PIDs by PDMS.
• Generate the piping isometrics.
• Prepare the piping arrangement and GA's drawings by draft module.
• Extracting Material Take‐Off "MTOs" reports, line and valve list.
• Handling PDMS Administration activities at Global projects (create the teams, PDMS users, DB, MDB and set the access control for different users).
Projects in which I participated at CB&I Lummus Co.:
• Cuddalore Refinery Project - A00 / A01 in Cuddalore, India
• Cabinda Gas Plant in Cabinda, Angola (As‐Built Project)
• Revamp Of LPG Facilities
Feed for Gas Network and compression facilities
Compressor station (CS‐9) Project in Bahrain (Tender preparation)
• Prepare the plant piping routing design according to PIDs by PDMS.
• Generate the piping isometrics.
• Prepare the piping arrangement and GA's drawings by draft module.
• Extracting Material Take‐Off "MTOs" reports, line and valve list.
• Handling PDMS Administration activities at Global projects (create the teams, PDMS users, DB, MDB and set the access control for different users).
Projects in which I participated at CB&I Lummus Co.:
• Cuddalore Refinery Project - A00 / A01 in Cuddalore, India
• Cabinda Gas Plant in Cabinda, Angola (As‐Built Project)
• Revamp Of LPG Facilities
Feed for Gas Network and compression facilities
Compressor station (CS‐9) Project in Bahrain (Tender preparation)
May 2009
To May 2010
Piping Designer & Stress Analyst & PDMS Administrator
at EVRMaC – AVEVA`s PDMS Representative in Egypt
Location :
Egypt - Cairo
Detailed Job Description:
• Prepare the plant piping routing design according to PIDs by PDMS.
• Critical piping stress analysis reports and supports selection.
• Special supports design.
• Material Take‐Off "MTOs" reports, submission ISOs and as built drawing.
• Coordinate with PGESCo and Toshiba for any missing data and discrepancy.
• Prepare the support index and support list and all other required reports.
• Handling all PDMS Administration activities (New projects creation, create the teams, PDMS users, DB, MDB and set the access control for different users)
• Create project Backing Sheets and Overlays, Label Libraries and any other required by Draft Admin module
Projects in which I participated at EVRMaC Co.:
• Secondment to UHDE Engineering Egypt (UEE) to Generate a general arrangement drawings (GA's) by PDMS For construction Unit 0200, 0220, 0230 at EAGRIUM Ammonia/Urea Project
• Nubaria‐III Power Station Project, 750 MW Combined Cycle Project
• Cairo West Power station Project, 2x350 MW Thermal Power Plant
• El‐Tebbin Power Station Project, 2x350 MW Thermal Power Plant
• Sidi‐Krir Power Station Project, 750 MW Combined Cycle Project
• El‐Atf Power Station Project, 750 MW Combined Cycle Project
• Prepare the plant piping routing design according to PIDs by PDMS.
• Critical piping stress analysis reports and supports selection.
• Special supports design.
• Material Take‐Off "MTOs" reports, submission ISOs and as built drawing.
• Coordinate with PGESCo and Toshiba for any missing data and discrepancy.
• Prepare the support index and support list and all other required reports.
• Handling all PDMS Administration activities (New projects creation, create the teams, PDMS users, DB, MDB and set the access control for different users)
• Create project Backing Sheets and Overlays, Label Libraries and any other required by Draft Admin module
Projects in which I participated at EVRMaC Co.:
• Secondment to UHDE Engineering Egypt (UEE) to Generate a general arrangement drawings (GA's) by PDMS For construction Unit 0200, 0220, 0230 at EAGRIUM Ammonia/Urea Project
• Nubaria‐III Power Station Project, 750 MW Combined Cycle Project
• Cairo West Power station Project, 2x350 MW Thermal Power Plant
• El‐Tebbin Power Station Project, 2x350 MW Thermal Power Plant
• Sidi‐Krir Power Station Project, 750 MW Combined Cycle Project
• El‐Atf Power Station Project, 750 MW Combined Cycle Project
January 2007
To April 2009
Technical office engineer (Piping)
at Warner Lewis Egypt
Location :
Egypt - Cairo
Detailed Job Description:
• Reviewing the contract, the Project technical specifications and the bill of Quantity.
• Preparing the progress payment invoices (Interim Payment Certificate) And discuss with the employer’s quantity surveyor.
• Discovering the contract variations and writing the notice for intention to claims and making the cost analyses of any CVN (Certified Variation Notice)
• Submission of the designs and workshop drawings and the related engineering documents and communicate with the consultant if any inquiry.
• Making the material take‐off quantities.
• Follow up the implementation of all activities procedures during Construction.
• Making the work and material inspection request.
• Constructing the material control and store keeping system for the company.
• Follow up the time schedule target activities and preparing it for
Commissioning & All Project phase.
• Prepare the daily report and sent it to the main contractor.
• Coordinate between the project different parties & contractors to assure that no contradiction will occur during construction.
Projects in which I participated at Warner Lewis Co.:
• Cairo International Airport
Fuel hydrant system project for TB3 (Terminal Building 3)
• Taba Airport refueling station (Taba International Airport project).
• Al‐Gurayat Airport project in Jeddah, Saudi Arabia
• Al‐Taif Airport project in Al‐Taif, Saudi Arabia
• Abuja International Airport project in Abuja, Nigeria
• Reviewing the contract, the Project technical specifications and the bill of Quantity.
• Preparing the progress payment invoices (Interim Payment Certificate) And discuss with the employer’s quantity surveyor.
• Discovering the contract variations and writing the notice for intention to claims and making the cost analyses of any CVN (Certified Variation Notice)
• Submission of the designs and workshop drawings and the related engineering documents and communicate with the consultant if any inquiry.
• Making the material take‐off quantities.
• Follow up the implementation of all activities procedures during Construction.
• Making the work and material inspection request.
• Constructing the material control and store keeping system for the company.
• Follow up the time schedule target activities and preparing it for
Commissioning & All Project phase.
• Prepare the daily report and sent it to the main contractor.
• Coordinate between the project different parties & contractors to assure that no contradiction will occur during construction.
Projects in which I participated at Warner Lewis Co.:
• Cairo International Airport
Fuel hydrant system project for TB3 (Terminal Building 3)
• Taba Airport refueling station (Taba International Airport project).
• Al‐Gurayat Airport project in Jeddah, Saudi Arabia
• Al‐Taif Airport project in Al‐Taif, Saudi Arabia
• Abuja International Airport project in Abuja, Nigeria