HVAC Engineer
IB International
مجموع سنوات الخبرة :4 years, 2 أشهر
*Installation and operation of all Chilled water piping and Ducting activities
*Schedules, assigns, plans, and monitors the work of all piping and ducting works on the site.
*Installation of valves, fans, and other HVAC Ventilation equipment.
*Installation of FCU, AHU, and Chilled water pumps.
*Prepares Work Inspection Request (WIR), Material Inspection Request (MIR) and do inspection on-site.
*Coordinating with various Electro-Mechanical teams.
*Conducting various testing for Piping (Hydro test) and Ducting (Light test) to check the integrity of work.
*Prepares As-Build Drawing.
*Prepares and submits Daily Progress Reports (DPR) to Project Engineer.