Transmission Engineer
ZTE Corporation
Total years of experience :12 years, 3 Months
• Full configuration and commissioning of NEC ipaso( 200, 400, 1000), & Complete Equipment Installation of Indoor and Outdoor Units.
• Software & Hardware Link capacity Upgrade (IDU, ODU, Antenna)
• Modem setting and Ethernet Setting.
• Perform PAT and FAT of MW link.
• Performing Ping test to confirm the access from BSC.
• E1&VLAN configuration, interconnection to BSC & power on of 2G/3G new sites
• Analyze and report the technical problems related to MV and SDR
• Installation, commissioning and integration of ZTE ZXSDR (BS8700/BS8900/BS8800), Maintaining & Troubleshooting of BTS
• Line of Site Surveys, Commissioning Reports, Technical Surveys, Site acquisition, cell planning parameters, BTS surveys, MSC and BSC technical surveys and link issues
• Performing Sweep Tests of Feeder line and Antenna Systems using Site Master. (ANRITSU)(BERT)
• Support SUB-CO team to improve the technical skills on site to avoid the quality accidents and monitor the work
• Supervision of installation of equipment for Huawei 2G/3G
•Output week target and activity plan to subcontractor partners
• Allocating Material and Manpower to sites.
• swap BTS 3900/3900E, Battery, power supply, GSM antenna
•Troubleshooting and maintenance of HUW RTN 910, 905, 950, 980 (1+0, 1+1HSB, 1+1SD, 2+SD and 2+0 XPIC Links)
• Microwave Installation & commissioning & swap Links & E1 rootin
• External alarms troubleshooting
• Acceptance BTS 3900 ( 900/1800/2100 MHz) & Mw links
• Supervision and control of new site installation.
• Microwave installation, parameters, configuration, launch NEC
• Manage and control MW links delivery
• Qualitiy control ( prepare as built ) for acceptance
• Commissioning Trauble shooting, swap Links
• swap delta (swap IDU from shelter to rack delta outdoor)
- Installation & commissioning Flexi Multiradio BTS (2G and 3G).,
- Swap & commissioning Flexi Multiradio BTS (from Siemens to NSN).,
- Site survey: RFI and survey reporting,
-Install alignment and swap of transmission link NEC
-Qualitiy control ( prepare as built ) for acceptance
• Installation of cable tray, cable pulling and earthing main & Installation of all electrical
system (lighting, connection and termination of motor) for turbine GE/Nuovo Pignone .
• Installation, warring, test in high tension of electric power, Glanding of cables (4G35, 4G50,
4G70….).
• Installation and termination of junction boxes.
• Test of valves: stroke test (ESDV, BDV, FV).
• Termination of panel’s instrumentation: (DCS. ESD. FGS).
12/20