محمد نوبي حسب النبي, Section Engineer

محمد نوبي حسب النبي

Section Engineer

Consolidated Contractors Company - Other Locations

البلد
مصر
التعليم
بكالوريوس, civil engineer
الخبرات
11 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :11 years, 8 أشهر

Section Engineer في Consolidated Contractors Company - Other Locations
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ يناير 2023

Project:- Telecom Egypt New Headquarters plot (21B1-22B1).

https://www.elgabalyarchitects.com/projects/telecom-egypt-we-headquarters-new-capital/


Owner :-Egyptian General Intelligence

Site Area 23397.92 m2

Total Built Area 74406 m2

Total Estimated Cost 2 billion LE



Main Consultant :- GEBAL Consultant
https://www.elgabalyarchitects.com/

Architecture Consultant:- EL GABALY ARCHITECTS. https://www.elgabalyarchitects.com/

Structure Consultant:- AACE Amr Abdelrahman Consultant Engineers. https://aaceconsultants.com/project/wetelecom-headquarters/

Softscape Consultant :-ÖKO PLAN Landscaping
https://www.oekoplan.com/projects/
Project's info

Location NEW CAPITAL
https://idsc.gov.eg/Upload/DocumentLibrary/Attachment_A/5902/10-Egypt%E2%80%99s%20New%20Administrative%20Capital%20City%20(1).pdf


https://www.linkedin.com/in/mohamed-nouby-a89092137

Construction Engineer في Hassan Allam Construction
  • مصر - مرسى مطروح
  • سبتمبر 2020 إلى ديسمبر 2022

* Dabaa Nuclear Power Planet (DNPP)

Owner:- (Egyptian Nuclear Power Plant Authority), https://nppa.gov.eg/#gsc.tab=0

Engineer: -ECG (https://www.ecgsa.com/), Egypt.

El-Dabaa, Egypt

Location: -In the vicinity of the town of El-Alamein, Egypt

Type of reactor: - VVER-1200

Number of Power Units: - 4

Total Estimated Cost 1 billion USD

General Designer: - Atomenergoproekt, JSC

General Contractor: - JSC AtomStroyExport

Project Manager: - ASE Rosatom
https://ase-ec.ru/en/projects/el-dabaa/

supervise the implementation of; -

-civil activity (Excavation, foundation, embedded plates& anchors, pedestals, Tanks)

- Infrastructure networks (Sewer, Storm, Water supply, Fire Fighting &Irrigation)

- Roads.

-Steel Structure Erection of metal sectors (Frames, Arches, Ladders, Beams, Girders, Pannels)

-Gantry Crane (Backfilling crushed, Compacting, Sleepers, Rails)

- Sandwich Pannels.

Senior Site Engineer في Hassan Allam Construction
  • مصر - العلمين
  • سبتمبر 2019 إلى سبتمبر 2020

Costal Towers Plot LD00 -Core & Shell Project.
https://img.mhuc.gov.eg/images/697a62cd-9aa0-41fe-9d7c-17e4e7804ca3.pdf

(Tower A, B )Podium (4th Floor) + (42) typical floor

Engineer: -ECG (https://www.ecgsa.com/), Egypt.

Project Manager: -New Urban Communities Authorities, http://www.newcities.gov.eg/Default.aspx

Total Estimated Cost 0.75 billion

- Deep Foundation (Piles), Rafts, Columns, RC Walls,

Cores, Traditional Slabs, Post Tension Slabs)

-Facades (Stick Curtain Wall System, Fiber Cement Board Cladding, Marble Cladding)

https://www.hassanallam.com/construction/group-profile/project-details/Alamien-Towers-

Senior site engineer في Hassan Allam Construction
  • مصر - العلمين
  • سبتمبر 2017 إلى سبتمبر 2019

Egyptian Presidential Palace: -

Owner: - Egypt's General Intelligence Service
https://www.presidency.eg/ar/%D8%A7%D9%84%D9%85%D8%B4%D8%A7%D8%B1%D9%8A%D8%B9-%D8%A7%D9%84%D9%82%D9%88%D9%85%D9%8A%D8%A9/

Engineering: - Elgabaly
https://www.elgabalyarchitects.com/

Project Management: - Ministry of Housing, Utilities &Urban Communities

Total Estimated Cost 0.25 billion LE

(Construction, Fully Finish& Infrastructure) Project.

@ New Alamein City -Marssa Matrouh - Egypt)

Site Engineer في SIAC Holding. JV. Arabtec.
  • مصر - القاهرة
  • أكتوبر 2016 إلى سبتمبر 2017

SECON Nile Towers Project.

https://www.siac.com.eg/?q=experience-sectors/building/secon-nile-towers-hilton

Owner: -Saudi Egyptian Construction Company (SECON), Egypt


Engineer:
-Space Consultants (Dr. Medhat Dorra), Egypt.
https://spaceconsultants.com/

-EHAF Consultant
https://www.ehaf.com/project/secon-nile-towers-egypt

Project Manager: -Hill International, USA, Egypt.
https://www.hillintl.com/project/secon-nile-towers/

Description
Turnkey construction of 2 towers.
The towers are composed of 3 common basements, a common ground floor and 22 floors. Total built-up area is 105, 000m2. The first tower is a 5 stars hotel (Hilton) comprises 256 rooms.
The second tower is a residential tower comprises 114 hotel apartments. Contract includes civil works, architectural works, finishing works, MEP works & landscaping.

The contractor is JV comprises Arabtec 55% (leader) and SIAC 45%.

The contract is on re-measure basis.

Site Engineer - QC Engineer في Aal Hokash Construction
  • المملكة العربية السعودية - نجران
  • أكتوبر 2015 إلى أكتوبر 2016

Yadama Secondary School
http://www.e-najran.gov.sa/NajranCities.html

Owner: Ministry Of Education
https://www.my.gov.sa/wps/portal/snp/agencies/AC163
ُ
Engineering :- Educational Buildings Authority

https://www.moe.gov.sa/en/Pages/default.aspx

Construction, Turnkey, Fully Finish & Infrastructure Project.

Quality Control Engineer في Arabin Construction Company .ACC
  • مصر - القاهرة
  • سبتمبر 2014 إلى أكتوبر 2015

MIVIDA Compound .
https://www.emaarmisr.com/ar/our-communities/mivida/

PKJ88 -Infrastructure Project For:-
PKJ67+PKJ68 https://www.emaarmisr.com/ar/properties/greensii/

Owner :- EMAAR Misr

Engineering :- ACE, EHAF, ABCG
https://ace-mb.com/
https://www.ehaf.com/
http://www.activebrains.net/tourist.htm

Site Engineer في Arabian Construction Company . ACC
  • مصر - القاهرة
  • سبتمبر 2012 إلى سبتمبر 2014

Nile Rirze Carlton Hotel.
https://www.ritzcarlton.com/en/hotels/cairz-the-nile-ritz-carlton-cairo/overview/

https://www.hillintl.com/project/the-nile-ritz-carlton/
Renovation Project.

Owner:- Misr Hotel
https://www.misrhotels.com.eg/

Engineering:- EHAF Consultant
https://www.ehaf.com/project/nile-ritz-egypt

Project Management :-
Hill International
https://www.hillintl.com/project/the-nile-ritz-carlton/

The project is to bring about total renovation for

the existing (former Nile Hilton) building to

incorporate the standards of Ritz Carlton as to

operate the 64, 000 m2 hotel and its 331 rooms,

swimming pool, water features, Spa, and Casino.

scope of work includes:

Architectural interior and exterior finishes.

Landscape (excluding related mechanical and electrical works).

Swimming pools and water features.

Architectural supervision over spa and casino

Signage.

Installation of Furniture, Fixture and Equipment

as per the books provided by ID consultant.

الخلفية التعليمية

بكالوريوس, civil engineer
  • في Aswan University
  • يونيو 2012

Civil departement Courses Highway Structure Steel structure Sanitry Raods Navigatoin Concrete Transportation Infrastructure Water supply Construction Design

Specialties & Skills

Steel Structures
Foundations
Consultant Coordination
Infrastructure
Construction
computer windows , word . exel , autucad 2d, sap 200.
AUTOCAD 2D
Civil 3d
Project Mangement
Shop Drawing
structural
project supervision
Construction
civil engineer
Site Engineering
Microsoft Office
Production
Management
Civil Engineering
AutoCAD
Engineering
Testing
Project Management
Installation
Maintenance Engineering
Project Work
Quality Assurance
Project Planning
Engineering Management
Project Estimation
planning
materials
procurement
ms project
residential
primavera
construction design
quantity surveying
project execution
plan execution
surveying
on site
structural engineers
problem solving
primavera p6

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.



اللغات

الانجليزية
متمرّس

العضويات

Resalaa
  • Support Engineer
  • March 2013
Egyptian Engineers Syndicate
  • Member of the General Assembly
  • August 2012

التدريب و الشهادات

Cvil 3d (تدريب)
معهد التدريب:
Cad Master Academy
تاريخ الدورة:
March 2017
المدة:
48 ساعة
PMP (تدريب)
معهد التدريب:
Ain Shams univercity
تاريخ الدورة:
September 2017
المدة:
350 ساعة

الهوايات

  • Reading
    224book