Architect
High Art engineering consultant - هاى ارت للاستشارات الهندسية
Total years of experience :10 years, 11 Months
- Architect
Residential building & villas - preparing of working drawings
- Resort in al Fujerah ( Hotel, Two towers and 15 villas)
- 26 villas at Hata ( Sheikh Zayed Housing Program)
- Architect
Residential building & villas - preparing of working drawings
Work on Design Villas & Industrials and Buildings
Some of the projects :-
-Work with some Real estate developers
-Work on Some Projects with Mosanda and FAB Bank
-Work on fit-out works
- Designer
Residential building & villas - working drawings - maintenance drawings for buildings
Work on Design Villas & Industrials and Buildings
Some of the projects :-
-Villa Mrs. Amna Ibrahim Al-Balooshi.
-Industrial Mr. Salem Al-shair.
-Industrial Mr. Salem Al-kathiri.
-Industrial ( M35 ) at Musaffah.
-Industrial (M45) HHS. Abdullah Bin Zayd Bin Sultan Al-Nahyan.
-Industrial HHS. Ahmed Bin Nasser Bin Zayd Bin Sultan Al-Nahyan.
-Building HHS. Shamah Bin Khalifa Bin Zayd Bin Sultan Al-Nahyan ( Development of Elevations and Maintenance).
-Building HHS. Aysha Bin Khalifa Bin Zayd Bin Sultan Al-Nahyan ( Development of Elevations and Maintenance).
-Building HHS. Shikha Bin Khalifa Bin Zayd Bin Sultan Al-Nahyan( Development of Elevations and Maintenance).
-Building HHS. Shikha Bin Khalifa Bin Zaid Bin Sultan Al-Nahyan ( Development of Elevations and Maintenance).
-Development of Elevations and Maintenance for Buildings HHS. Shikha Bin Khalifa Bin Zaid Bin Sultan Al-Nahyan Real Estate.
- More than Six Buildings at Mohamed Bin Zayed City
(Addition Floors & and Maintenance).
- Designer at Dubai & Sharjah
Residential building & villas - preparing of working drawings - Interior Design
Some of the projects :-
-Villa Mr. Mohamed Abdulla Ahmed Al-Mulla
-Sheikh Zayed Standard Villas.
-Villa Mr. Ahmed Al-Badi.
-Villa Mrs. Moza Musabeh Salem Al-badi.
-Villa Mrs. Amna Ibrahim Al-Balooshi.
West Harbor Expansion Project
( Ennpi & PHPC. ) 2012
Egypt
Installation of L.E.R ( Local Equipment Room ) at Natural Gas Field ( HABI ) with Ennpi Petroleum Comp. responsible for :-
- Installation of Scaffolding.
- Installation of External Wall cladding.
- Installation of External Roof cladding.
- Installation of internal wall cladding.
- Installation of internal partitions.
- Installation of False ceiling, Raised floors and Doors.
- testing and closing.
Passed ( HSE ) exams at ennpi & PHPC.