Electrical team leader
metito
Total years of experience :19 years, 8 Months
responsible for electrical works include cable schedule, load list, single line diagram, illumination system, earthing system, bill of material for electrical construction
METITO Egypt for water treatment CO. from 7/2008 till now
Electrical team leader: • Design of the following:
Ring Main Unit (RMU)
Medium voltage switchgear (MVSG)
Distribution Transformer
Generator
Motor Control Center (MCC)
Loca Control panel (LCP)
Elecrical Distribution Board.
Lighting System
UPS System
Earthing System
Fire Alarm and Fighting System
I/O list and PLC Configuration
• Design of site Electrical layout & installation materials selection
• Prepare cable schedule, load list, single line diagram and cable trays
• Prepare Bill of quantities (BOQ) for site installation materials
• Prepare technical submittals for electrical work in engineering and proposal stages
• Following up the electrical works in the site (electrical site engineer in SIDI KRIR
project & handling with subcontractors)
Projects handled:
EL TEBBIN power station water treatment plant
AL ATF power station water treatment plant
SIDI KRIR power station water treatment plant
CAIRO WEST power station water treatment plant
KISSIR water treatment plant (in Algeria)
AL BAGOR water treatment plant
SAMANOED waste water treatment plant (SBR system)
GIZA NORTH power station water treatment plant
BANHA power station water treatment plant
GHARB EL BOROLOS pump station (tender stage)
KAFR EL ZAYAT water treatment plant (tender stage)
MARSA MATROUH SWRO plant 4x5000 m³/D (tender stage)
EL YOUSR SWRO plant 2x5000 m³/D (tender stage)
HURGHADA SWRO plant 4x5000 m³/D (tender stage)
RAFAH SWRO plant 2x3250 m³/D (tender stage)
ABU REDIS SWRO plant 2x1250 m³/D (tender stage)
AL GABAL AL ASFAR WWTP 500, 000 m³/D (tender stage)
Suez power station water treatment plant
SYSTEM TECHNIQUE FOR WATER TREATMENT from 08/2004 to 06/2008
Electrical Engineer:
• Design of Local Control Panel
• Prepare BOMs for Site Installation
• Intstallation Supervision for all the electrical works at the site
• Prepare load list, single line diagram and cable schedule
• B.Sc. Of Electrical Engineering (Electrical machine & Power Department) Cairo University, Faculty of Engineering 2002, with good degree. • Graduation: Design of power cable, short circuit current, voltage drop, lighting project system, fire alarm system and grounding system for SINA factory for cement. Lifting system as a hardware project. • Project Grade: Very Good