Mohamed Rashed, Project Manager

Mohamed Rashed

Project Manager

BESIX Construct

Lieu
Émirats Arabes Unis
Éducation
Master, Msc. Strategic Project Management
Expérience
19 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :19 years, 3 Mois

Project Manager à BESIX Construct
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis janvier 2021

Project: R1013/2B2 Improvements of Al Shindagha Corridor Phase 2B2- Falcon Junction
Client: Road and Traffic Authority (RTA), Dubai
Engineer: Parsons Overseas
The project consists of the improvement of falcon junction, It includes two flyover bridges along Al Khaleej Street with 6 lanes in each direction for 1.2 km length, and two-lane tunnel for the left turn movement from Khaled Bin Al Walid Street to Mina Street south bound.
Project Cost 450M AED.
Area of Expertise (Bridges, Underpass, Utilities, Traffic Diversions)

Deputy Project Manager à Tristar Engineering & Construction
  • Émirats Arabes Unis - Dubaï
  • août 2019 à janvier 2021

Tristar Engineering & Construction
Project: R1006 Upgrade of Al Khawaneej and Mushrif Park Corridor
Client: Road and Traffic Authority (RTA), Dubai
Engineer: KEO Intl.
Al Khawaneej Road and Mushrif Park Road is located within a built-up area of residential and commercial buildings. It starts from Sheikh Mohammad bin Zayed Road (E311) up to the connecting with Emirates Road (611). The length is approximately 23 km.
Project Cost 500M AED.
Area of Expertise (Precast Bridge, Underpass, Utilities, Traffic Diversions)

Deputy Project Manager à HLG Contracting
  • Émirats Arabes Unis - Dubaï
  • avril 2016 à août 2019

HLG Contracting - Engineering dept.
Project: R1011 Upgrade Junctions at Airport Road Project
Client: Road and Traffic Authority (RTA), Dubai
Engineer: Louis Berger Intl.
The project comprises the construction of bridges, tunnels at Al Rashidiya and Airport Road interchange with each of Casablanca Road, Marrakech Road and Nad Al Hamar Road. It also includes improving at-grade intersections, and constructing a service road of three lanes in each direction to separate the traffic movement from and to Nad Al Hamar from the vehicular flow on Airport Road starting from Al Rashidiya Interchange up to Marrakech Interchange, Project Cost 409M AED .
Area of Expertise (Bridges, Underpass, Utilities, Traffic Diversions)

Project Engineering Manager à Al Naboodah Contracting
  • Émirats Arabes Unis - Dubaï
  • février 2013 à mars 2016

Project: SP100 - Dubai International Airport Miscellaneous Airfield Works
Dubai, UAE

The contract for SP100 - Miscellaneous Airfield Works is a multiple contract for the development and refurbishment of the existing Dubai International Airport infrastructure to meet the projected demands for the year 2020.The works undertaken include, but are not limited to, the construction of new aircraft stands, the upgrading of the existing stands, refurbishment of the North and South Runways, as well as improvements to the existing airport infrastructure, upgrading of existing substations, etc., the client is Dubai Aviation City Corporation, DAR AL HANDASA as the Engineer, Project Cost exceeds 3 Billion AED .

Area of Expertise (Infra structures, Aprons, Taxiways & Runways pavement, Fuel stations, Substations, Pump stations, Service Buildings, Geotechnical and Airfield works.)

Senior Civil /Structural Engineer à Kharafi National
  • Émirats Arabes Unis - Abu Dhabi
  • juin 2010 à février 2013

Project :IGD Habshan5 process plant construction-GASCO
Habshan, Abu Dhabi, UAE
Habshan -5 is a part of the Abu Dhabi Integrated Gas Development Project GASCO, the main activity to be performed here is purification of the natural Gas and distribute to Gasco facilities for further fractionation. The project cost for Kharafi National is 728 million USD. EPC contractor Tecnimont/ JGC JV
Area of Expertise (Infra Structures, Substations, Service Buildings, Roads and Steel structure.)

Technical Office Engineer à Taisei Corporation
  • Émirats Arabes Unis - Dubaï
  • février 2007 à novembre 2009

Project: R829/1 Arabian Ranched interchange Project - \{closing out Phase\}
Emirates Road, Dubai, UAE

Arabian Ranched interchange was a part of RTA plan for widening of Emirates Road, the project consists of 10 bridges, 2 under passes it was considered as one of the largest interchange in Dubai . Project value exceeds 409 million AED, the client was RTA and PARSONS as The Engineer.
Area of Expertise (Bridges, Underpasses and Roads)

Project: Trunk Spine double deck Bridge Project (Design and Built)
Palm Jebel Ali, Dubai, UAE

The project comprised of design and built bridge which will be the only land line between the spine and trunk, the scope of work included maintain hard and wet utilities for the PJA as well. Project value exceeds 250 million AED, the client was NAKHEEL and PARSONS as The Engineer.
Area of Expertise (Bridges and Roads)

Technical / Cost Engineer à JT METRO JV
  • Émirats Arabes Unis - Dubaï
  • août 2004 à février 2007

• Dubai Metro Project (DURL), JTJV -UGS: Al-Ras, Palm Deira, Al-Ghubiba, Al Saediya, Beniyas, Annex 6, Burjuman Stations.TBM (Tunnel for Boring Machine): Al-Ghubiba. Al-Ras, Al-Saediya Stations. Scope of work comprised installation of of deep dewatering wells (dia.:1000~500mm, Length: 15~70m), Shoring system H-Beam & contiguous piles
• Dubai Metro Project (DURL), JTJV -AGS: ABU-BAKER, SALAHUDDIN stations.
The scope of work comprised installation of well points dewatering system Shoring system.
• Dubai Metro Project (DURL), Palm Deira station, JTJV. The scope of work comprised Driving installation by Pre drilling and vibro hammering systems, sheet piles
• R800/5 Ras Al-Khor Crossing Double Decking Bridges, TAISEI Corporation: scope of work comprised Installation of bored piles with Diameter 1000mm, Depth 20.0m, Installation of Shoring 1200 Nos. H- Piles and installation & de-installation of Sheet piling works using vibro Hammering technique .
• Palm Jumeirah District Cooling Plant, SHINRYO Corporation -150 bored Piles.

Éducation

Master, Msc. Strategic Project Management
  • à Heriot Watt University , UK ( Dubai Campus)
  • août 2016

MSc Strategic Project Management is designed to prepare graduates to be future leaders in the global project based environment. By developing knowledge and skills in both business strategy and project management, our graduates are unique, valuable and attractive to all types of organisations and industry sectors. Through accreditation by the Association for Project Management (APM) and strong industry relations, students will be exposed to strategic thinking, innovation, best practices and the latest research in project and programme management.

Baccalauréat, Bsc Civil Engineering
  • à Mansoura University ,Egypt
  • mai 2004

Civil and Structural Engineering

Specialties & Skills

Technical Understanding
Design Development
Standards Compliance
Managing Processes
Value Engineering
Complex Problem Solving
Time Management
Reading Comprehension
Judgment and Decision Making
Quality Control Analysis
Operations Analysis
Negotiation, Persuasion, and Communication
Risk Analysis
Program development
Quality Control
cost Control
contract administration
HSE Management
Project Management

Langues

Anglais
Expert
Arabe
Langue Maternelle

Adhésions

Project Management Institute , USA
  • Member of PMI
  • June 2011
Emirates Engineers Society
  • Member
  • September 2005
Egyptian Engineers Syndicate
  • Member
  • August 2004

Formation et Diplômes

Effective People management and Leadership for Building Strong Teams Training (Formation)
Institut de formation:
BESIX Training Center
Date de la formation:
May 2023
Advanced People Management, Contract, Commercial & Legal, Design Build Finance Maintain (Legal / Str (Formation)
Institut de formation:
BESIX Training Center
Date de la formation:
May 2023
IOSH – Managing Safely (approved by – Institute of Occupational Safety & Health, UK) (Formation)
Institut de formation:
Institute of Occupational Safety & Health, UK
Date de la formation:
May 2023
Durée:
48 heures
MSc Strategic Project Management (Certificat)
Date de la formation:
July 2016
Certified Contract and Commercial Manager Course (Formation)
Institut de formation:
Chicago Institute , Abu Dhabi (certified from Franklin University, Columbus Ohio, USA)
Date de la formation:
March 2012
Durée:
80 heures
PMP-Project Management Professional (Formation)
Institut de formation:
Cambridge Institute, Abu Dhabi, UAE
Date de la formation:
June 2011
Durée:
40 heures
: PSP- Professional scheduling and planning (Formation)
Institut de formation:
Cambridge Institute, Abu Dhabi, UAE
Date de la formation:
October 2011
Durée:
40 heures