Senior Mechanical Engineer (UPDA/MMUP Certified)
Fujita Corporation under Qatar Rail
Total des années d'expérience :13 years, 0 Mois
Supervise and train project team members. and Ensure that all HVAC, Plumbing & Drainage, Fire Fighting Installations & Site activities are conducted under controlled conditions as per shop drawings, method statements, and specification and work plan
Conducting Construction Inspection for Entire Mechanical Systems in MEP and Coordinate with Sub Contractor and giving technical advice to close out the site issues. Conducting Progress meeting and prepare progress report daily basis to submit Construction Manager
Raising MAR, MIR, IR, etc on timely basis planning in advance for the requirement of next 2 weeks. Prepare Design verification report with necessary calculation for Mechanical Systems and Leading draftsman to complete shop drawing as per Project specification and QCS2014 Prepare and Review Material submittal, Method Statement and Shop Drawings against Project Specification and QCS 2014 and Preparing Compliance Statement for final QA/QC Documents’ close out. Coordinate with Procurement and supplier to achieve delivery date as per project baseline Conducting technical meeting with Manufacturer and Specialist in order to comply the project specification with their product and equipment Conducting final handing over Procedures with BMS/BACS for the smooth operation of Entire Mechanical system with Sub Contractor and Vendor by demonstrating to Qatar Rail. Attending and Demonstrating Operation of the System for QCD Inspection with Fire Alarm Integration Preparing Sequence of Operation for Approval and Verify with BMS/BACS for Each Mechanical System such as HVAC, Fire Fighting, Plumbing and Drainage etc.
Coordinate with Sub Contractor and Implementing the Testing and Commissioning Program for the Mechanical discipline such as HVAC, Firefighting, Plumbing, Drainage and Compressed air systems To implement a Testing and Commissioning Plan, Method Statements, Testing and Commissioning Procedures, Data Sheets, Testing Criteria, Testing and Commissioning Reports and/or validate or invalidate testing and commissioning results for this discipline.
Completing the tasks assigned for inspection of Installation of Mechanical Services Such as HVAC, Fire Fighting, Plumbing and Drainage Systems by the Project Manager;
Attending inspections via Work Inspection Requests and provide accurate inspection comments;
Provide inspection comments and submit to Project Manager for verification;
Reviewing Testing and commissioning checklist and Provide proper comments for the correction
Attending Inspection for Testing and Commissioning activities for Total MEP System
Assure inspections are carried out as per schedule and procedure;
Examine materials, specifications, plans and Procedures of system installations and check for compliance with approved project specifications, method statements, applicable drawings, codes and project standards.
Issuing of NCRs and Site observation to the contractors in the events of noncompliance to specifications and Standards as per the requirement of site.
Report to the Project Manager any non-conformance observed during inspections;
Advice on any Mechanical work problems, issues and deficiencies identified to the Mechanical Engineer in a timely manner;
Maintain Daily Works Records in an agreed format. Submit the Daily Work Records to Project Manager on a Daily basis;
Provide status of snagging and re-snagging of the Mechanical works as per site condition;
Receive and Rreview Shop Drawings, Specification, Method Statements and Materials Submittals to Mechanical works
Following the International and Local Codes & Standards during the review of Submittal and Inspection Such as QCS 2014, ASHREA, NFPA, IPC, UPC, SMACNA, DW144, ANSI, QCS and QCDD
Receive and review shop Drawings, specification, Materials Submittals and Bill of Quantities pertaining to Mechanical works
Supervise and train project team members (Supervisors, foreman & Labors). and Ensure that all HVAC, Plumbing & Drainage, Fire Fighting Installations & Site activities are conducted under controlled conditions as per shop drawings, method statements, and specification and work plan
Inspect completed installations and observe operations, to ensure conformance to design and equipment specifications and compliance with operational and safety standards.
Prepare specifications for purchase of materials and equipment.
Review & Preparing Material Submittal and following up with consultant for Approval
Following the Standards such as NFPA, ASHREA & UPC in Technical Works of Each Project
Follow up Inspections, Testing and Commissioning with consultant for the Mechanical Services
Provide technical oversight and guidance to construction and project management staff
Develop budgets, estimating labor, material, and construction costs
Raising MR, MIR, IR, etc on timely basis planning in advance for the requirement of next 2 weeks.
Coordinate with Sub Contractor and giving technical advice to execute the project
Responsible for the participation in the progress and coordination meetings of the design projects and the preparation of the meeting records.
Preparing the BOQ Which Includes Material Cost, Installation Charge and Over Head & Profit for Estimation of Each Project
Receive and review shop Drawings, specification, Bill of Quantities pertaining to Mechanical works
Checking for the site feasibilities and arise revision over drawing accordingly.
Ensure that all HVAC, Plumbing, Fire Fighting, Fire Detection & Electrical Installations & Site activities are conducted under controlled conditions as per shop drawings, method statements, and specification and work plan
Inspections, Testing and Commissioning for the Mechanical Services
Coordinate with Sub Contractor and giving technical advice to execute the project
BOQ Preparing, Take off - Quantities and Estimation
-Design HVAC system for buildings
-Installing A/C system on desired buildings
-Maintaining the A/C equipment after installation
-Plant room maintenance
I have done two projects during academic period Pedal Powered Water Pump as individual project (individual Project) The pumping system which could provide discharge 20 litre per minute of water up to 6m of lift. The device could be operated by using bicycle power with belt drive arrangement (Supervised by Dr. D. Randeniya, Senior Lecturer, faculty of Engineering, university of Peradeniya, Sri Lanka) HVAC System Design for a building (group project) Propose a HVAC system for a theatre to obtain a high efficiency and low running cost without loose the thermal comfort which includes heat load calculation, equipment selection, duct design & duct layout and ventilation system (Supervised by Dr. W. P. D. Fernando Senior Lecturer, faculty of Engineering, university of Peradeniya, Sri Lanka)