- Planned, monitored, and controlled the progress of multiple projects sponsored by several entities including Abu Dhabi General Services Company (Musanada); Abu Dhabi National Oil Company (ADNOC); Abu Dhabi Airports Company (ADAC).
- Studied the project documents and held several technical meetings and workshops with the projects' teams.
- Developed detailed resource-loaded project baselines (level 4), utilizing the outputs from the document studies and the workshops.
- Monitored and tracked the progress on a daily, weekly, and monthly basis.
- Created weekly and monthly detailed look-ahead programs.
- Created weekly and monthly performance reports including Earned Value Analysis.
- Tracked and highlighted progress delays and created Notice of Delay letters.
- Conducted delay analysis utilizing TIA and Window Analysis methods, and prepared Extension of Time claims.
- Interacted with the project stakeholders to address progress-related issues through meetings and workshops.
- Participated in project estimation and tenders' bids preparation.
- Studied the project documents and held several technical meetings and workshops with the projects' teams.
- Developed detailed resource-loaded project baselines (level 4), utilizing the outputs from the document studies and the workshops.
- Monitored and tracked the progress on a daily, weekly, and monthly basis.
- Created weekly and monthly detailed look-ahead programs.
- Created weekly and monthly performance reports including Earned Value Analysis.
- Tracked and highlighted progress delays and created Notice of Delay letters.
- Conducted delay analysis utilizing TIA and Window Analysis methods, and prepared Extension of Time claims.
- Interacted with the project stakeholders to address progress-related issues through meetings and workshops.
- Participated in project estimation and tenders' bids preparation.
يناير 2017
إلى أغسطس 2018
Planning Engineer
في Sarh Al Wadi Building & Construction L.L.C
البلد :
الإمارات العربية المتحدة - أبو ظبي
- Created project schedules, cash flow, S-curve, manpower histogram, progress reports and payment applications for high rise buildings projects.
- Prepared EOT and variation claims.
- Prepared and tracked technical submittals in coordination with subcontractors.
- Assisted in tender bids and contract management.
- Prepared EOT and variation claims.
- Prepared and tracked technical submittals in coordination with subcontractors.
- Assisted in tender bids and contract management.
فبراير 2016
إلى نوفمبر 2016
Site Manager
في Takat Alarabiya Contracting
البلد :
المملكة العربية السعودية - الرياض
Successfully handed over the project (precast building) before the contractual end date.
يناير 2013
إلى فبراير 2016
Technical office Engineer
في Takat Alarabiya Contracting
البلد :
المملكة العربية السعودية - الرياض
- Successfully accomplished technical office tasks for multiple buildings projects, including scheduling, quantity surveying, shop drawings, as-built drawings, progress reports, and payment applications.
- Established a well-organized database for projects historical data to be used as inputs in projects planning and analysis, like productivity rates of resources and actual costs.
- Established a well-organized database for projects historical data to be used as inputs in projects planning and analysis, like productivity rates of resources and actual costs.
أكتوبر 2011
إلى أكتوبر 2012
Site Engineer
في Administration of Urban Planning and Infrastructur
البلد :
السودان - الخرطوم
- Supervised the construction a school building.
- Assisted in procurement and controlling of subcontractors.
- Assisted in procurement and controlling of subcontractors.