Mohamed Sanseer Sharifdeen, Quantity Surveyor

Mohamed Sanseer Sharifdeen

Quantity Surveyor

Fibrex Group

البلد
الإمارات العربية المتحدة - أبو ظبي
التعليم
بكالوريوس, BTEC Higher National Diploma in Quantity Surveying
الخبرات
13 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 8 أشهر

Quantity Surveyor في Fibrex Group
  • الإمارات العربية المتحدة - أبو ظبي
  • أشغل هذه الوظيفة منذ مارس 2017

 Ensure prompt and regular submission of Interim payment Applications, negotiation with consultant to get timely certification.
 Assist in the procurement process for Sub-contractors, Material Suppliers and Service Providers
 Calculate Sub-contractors monthly liabilities showing realistic figures and a prudent allowance for forecast costs and considering potential risks
 Prepare Work Activity Breakdown for all Sub contract works (ie. Fire Fighting, Fire Alarm, BMS, Chilled Water, and Telecommunication System), Review & Evaluate Subcontractor Payment Applications, issues Payment Certificates.
 Assist in the evaluation of claims received from the Sub-contractors
 Obtaining close out documentation upon completion of Subcontract Works and negotiating final (end) settlements of the Subcontract.
 Seek out potential variations through project correspondence and documentation and issues arising on site, timely issuance of notices of Cost/time impact.
 Prepare variation submissions including detailed Cost Breakdown and other supporting documents to the Employers professional team including finding the maximum return for the Contractor.
 Maintaining Variations Log that tracks the current status of all Submitted variations, Substantiations and negotiations of Variations with Consultant.
 Drafting contractual correspondence and notices and ensuring they are issued on time to the Subcontractors as per the provisions of the Subcontract
 Prepare and Submit Monthly KPI Report to management which contains the Planned, Actual & Forecasted Cost of Site Labors, Site Supports, Plant & Equipment and Management Staff.
 Arriving new rates for Non BOQ items.
 Prepare Budget Vs Quotation Comparison for all major items and assist Commercial Manager to manage Budget deficit through Cost reductions/ savings.

Quantity Surveyor/ Cost Controller في Landmark Group.
  • الإمارات العربية المتحدة - دبي
  • أبريل 2015 إلى يناير 2017

 Review of BOQ’s prepared by Concepts (ie. EMAX, MAX, Center Point, Home Box, Iconic)
 Floating Tender enquires and preparing Tender Comparison Statement for received tenders.
 Involve in negotiation with tenderers, Preparation of Tender Evaluation Report, Preparation of Approval Note of selected vendors for management approval.
 Assist Project Manager in all Commercial Meetings with Consultant, Contractor & Supplier.
 Floating Quotation Enquiry for materials including long lead items, Obtaining Minimum 3 Vendor Quotes, Budget Comparison, Obtaining management approval, issuing LPO through Web Portal.
 Preparation of BOQ for Additional Works based on Design Drawings.
 Review of variations and make recommendations to Project Manager after Variation Assessment.
 Review of Interim & Final Payment Application of Consultant, Contractor and Suppliers, Evaluation & Certification.

Quantity Surveyor (Fit Out) في Fino International
  • قطر - الدوحة
  • نوفمبر 2013 إلى يناير 2015

 Detailed Quantity Take-off, Estimation & Costing.
 Preparation of Interim & Final Payment Application, Attending monthly site walk with main contractor to agree progress for the payment, obtaining Certification.
 Review RFI’s, IFC Drawings and Direct Instructions from Client for any Cost & Time impact, Notifying Main Contractor/ Consultant, Preparation of Variation with detailed backups.
 Re-measurement/ Site measurement as required.
 Prepare list of materials to be purchased as scheduled, Prepare Cutting list (Counter Top, Floor & Wall Tiles, Quantities of Gypsum, Metal Studs, Supports & Hangers, etc).
 Drafting Correspondences and ensure that all project commercial files (Incoming and Outgoing) are filed and documented.

Quantity Surveyor في Promer Qatar Contracting W.L.L
  • قطر - الدوحة
  • يناير 2012 إلى أكتوبر 2013

 Quantity Take-off based on Construction Drawings and Tender Drawings.
 Floating Quotation Enquiries.
 Preparing Interim Payment Application.
 Evaluating & Certifying Subcontractor Payment based on Actual Site Measurement.
 Preparing Work Inspection Request for Mechanical Works.
 IFC vs Tender Comparison.
 Maintaining Logs (LPO, Variation, Payments)

Quantity Surveyor في Sierra Construction (Pvt.) Limited
  • سريلانكا - كولومبوا 3
  • أبريل 2010 إلى أكتوبر 2011

• Quantity Take off and preparation of BOQ.
• Prepare & evaluating the Interim Payment Certificate.
• Prepare & reviewing the Sub-Contractor Payments.
• Assess works & activity.
• Assess the plant & material at site.
• Evaluate the variation orders.
• Claim extension of time to variation orders.

الخلفية التعليمية

بكالوريوس, BTEC Higher National Diploma in Quantity Surveying
  • في City & Guilds - UK
  • يناير 2010

Got Merit Pass in Tendering, Estimating & Quantity Surveying

Specialties & Skills

AutoCAD
Adobe Photoshop
3D Modeling
MS Office tools
Time management

اللغات

الانجليزية
متمرّس
العربية
مبتدئ

الهوايات

  • Playing Cricket
    I'm the captain of my school cricket team. I have participated in many tournaments.