Responsible for Achieving project Objectives that is aligned with Project Requirements within the approved Cost, Time and scope baselines
Part of My Job description is found below
1. Develop Project High-level Structure
2. Human Resources Recruitment for key subordinate’s positions
3. Identify Stakeholders
4. Define the Scope
5. Define the WBS, Activities, and milestones for planning team
6. Define Cost Control procedure and Flow Chart for orders
7. Resources Management Plan
8. Define the Project budget including Direct and indirect costs
9. Establish Communication plan
10. Identity risks, qualitative risk assessment, Plan Risk Responses
11. Plan the Procurement
12. Direct and Manage Project Work according to the plan and monitor the deviations
13. Take corrective actions tackling deviation from the scope, time and cost baselines.
14. Conduct Procurement
15. Manage Communication between project Stakeholder
16. Manage Stakeholder Engagement
17. Check the project CPI, SPI deviation reasons
18. Tackle the cash flow deficient predicted reasons
1. Receiving Project Documents (Scope of work, BOQ, Drawings, Schedule of Equipment, Instruction to tenderer, Recommended Manufacturer list, responsibility Matrix, Design Concept and Details) and verify its completeness .
2. Allocate Resources for project study.
3. Monitor Progress reports regarding Take off and Cost Estimation procedures.
4. Issue RFI for Clients.
5. Supervise RFQ packages preparation.
6. Supervise Evaluation of the supplier quotations against the tender requirements such as capacity, quantity, specifications, deviations, etc. Make comparative analysis of all quantities & use the optimum solution.
7. Assist in supplier follow up and manage relationship with them.
8. Revise HVAC Project Cost Estimation with Engineers.
9. Revise Firefighting Project Cost Estimation with Engineers.
10. Revise Plumbing Project Cost Estimation with Engineers.
11. Negotiate Material Prices with Suppliers and specialties Subcontractor
12. Prepare Material and Manpower Estimate Brief-look (Summery Sheet) to discuss with Management Level.
13. Enhance team Work Flow through continuous development of tools and techniques.
14. Revise the costing for the post tender clarifications received.
15. Prepare final contract BOQ based on the agreed contract value.
16. Arrange with different department for Budget Uplifts and cost Adjustments.
17. Prepare Handing over package for Awarded projects for different parties.
Regarding MP(HVAC, Fire and Plumbing) Projects
1. Verify and review specifications and drawings. ·
2. Prepare Vendor List
3. Prepare RFI (for any missing documents, drawings, specs. or any required clarifications).
4. Prepare take off for major item.
5. Review Take-off from Quantity Surveyors.
6. Prepare Material Inquiry Packages for each item (Specifications, Drawings & BOQ).
7. Prepare RFI Summary Status Report. ..
8. Prepare Material Inquiry Status. Report.
9. Following up with suppliers (as per material Inquiry status report).
10. Prepare comparison sheets of material prices
11. Preparing project cost program
12. Prepare Mechanical Projects Value engineering proposals
13. Manage Quantity Survey Developing Program
14. Estimation Tools Developing Team Member
1. HVAC Projects technical Study.
2. HVAC Projects Cost Estimation.
3. Fire Fighting Projects technical
4. Fire Fighting Projects Cost Estimation.
5. Plumbing Projects (Supply, Drain, Storm systems) technical Study.
6. Plumbing Projects (Supply, Drain, Storm systems) Cost Estimation.
7. Cooling Load Estimation by HAP program.
8. Absorption System Chillers Solution offer.
9. Screw System Chillers Solution offer.
10. Provide Absorption System Training.
1. Proposing effective Balancing solution for HVAC Pipeline Network \[Including balancing valves sizing calculations\].
2. Provide detailed piping system material take‐off.
3. Provide technical Training on Firefighting Devices.
4. Provide Training programs on Hydraulic Balancing and Grooving System.
5. Make the technical suggestion and technical selection for Vibration isolators.
6. Site trouble shooting and installation for special devices
• Types of concrete pumps, troubleshooting of some failures, Control system
• Team work, Technical skills
• Mechanical pipe lines, Cooling system requirements, Material prices listing, Searching materials
• Technical skills, Managerial skills, Team work
• Auto maintenance, motor overall maintenance, cooling systems, sudden failure troubleshooting.
• Technical skills, risk management, team work.
New and Renewable Energy Master Degree Covered the below Subjects - Wind energy - Biomass energy - Distribution Generation - Photovoltaic systems - Energy storage techniques - Measurement and instrumentation for renewable energy systems - Economics of renewable energy and hybrid energy systems - Renewable energy sources - Solar energy and thermal converters
American University in Cairo (AUC), PRMG (Awarded), (GPA 3.51=Excellent) May, 2015 • PRMG 025: Project Management International Standards PRMG 080: Project Bids and Contracts “FIDIC Models” (Grade A= 4/4-Excellent) (Ranked#1 on class). (Grade B+=3.33/4 -Excellent). • PRMG 035: Cost Management for Engineering Project (Grade B=Very Good). • PRMG 055: Procurement Management PRMG 015: Project Human Resource Management. PRMG 030: Project Budgeting and Financial Control (Grade A= 4/4-Excellent) (Ranked#1 on class). (Grade A= 4/4-Excellent) (Ranked#1 on class). (Grade B=Very Good). • CAEN 011: PRIMAVERA P6 Project Management. PRMG 075: Planning and Scheduling Professional (PSP P (Continue Education) rep) (Grade A= 4/4-Excellent) (Ranked#1 on class).
I am Studying now in post graduate studies and i have achieved 3.2 GPA (Very Good) degree at the first semester . Thermodynamics,Hydraulic control,Vibration,Turbo machinery ,