production planning manger
kandil Egypt
Total years of experience :10 years, 4 Months
-build mini ERP system based on google spreadsheets and the knowledge from I4.0.
-Worked as a planning manager. And contribute in making foundation of machines and Installation. I
Succeeded to increase production and eliminate wastes.
- Set a manual for each new product. -Development of Industrial processes.
-Managed transition of new products into productions by specified and implemented tooling, jigs and
fixtures, equipment and facilities
- Delegate Tasks to Factory Staff - Create and Enforce Quality Control Standards Operating
Procedures - Analyze Factory Production Data and Devising Improvement Strategies
-Study tenders and requests for quotations orders
-work with international Stranded(UL, EN, STI P3, STI Permatank, ASTM, ...)
-design the client requirement according to stranded and the possibility of productions process whether
Storage tank (horizontal, vertical, cubic) or internal projects
-Selecting the protection types according to surrounding condition(epoxy- GRP-PU-...)
-draw detailed Shop/work drawing for storage tanks, steel structure or internal project
-Development of production processes-site visiting for supervision and get measurements
-communicating with clients and their representatives
Maintenance and development to the machiens
Make maintenance schedule
Try to acitvate Predictive maintenance
Reverse engineering to some machiens and produce it
لم ينتهي بعد
My graduation project is PCB circuit maker and i got training in manufacturing and maintenance in 4 places in the summer semester 3 monthes each
URL removed due to policy violation. Please contact support for further information.