Total Years of Experience: 13 Years, 11 Months
July 2019
To Present
Cost Control Engineer
at Parsons Corporation
Location :
Saudi Arabia - Riyadh
• Prepare weekly and monthly cost reports, dashboards and presentations.
• Prepare and analyze comparisons of scope, quantities and cost data between projects.
• Review and critique design and specifications for cost effectiveness and suggests alternatives when appropriate.
• Review the directed cost engineering and material control related provisions of proposals and develop supporting data for contracts negotiations.
• Monitor projects’ progress and control invoicing process.
• Prepare cost budgets of projects for compliance with budgeting standards, completeness and accuracy.
• Responsible for cost estimates and preparation of claims and variation orders.
• Prepare and analyze comparisons of scope, quantities and cost data between projects.
• Review and critique design and specifications for cost effectiveness and suggests alternatives when appropriate.
• Review the directed cost engineering and material control related provisions of proposals and develop supporting data for contracts negotiations.
• Monitor projects’ progress and control invoicing process.
• Prepare cost budgets of projects for compliance with budgeting standards, completeness and accuracy.
• Responsible for cost estimates and preparation of claims and variation orders.
February 2014
To June 2019
Lead Cost Control Engineer
at BACS Consortium
Location :
Saudi Arabia - Riyadh
• Implementation of the project Cost Control System in the Stations Delivery Area (Elevated, Deep Underground, Surface and Iconic Stations)
• Issuing monthly Cost Report at all the budget levels (Tasks, Workpackages and Cost Elements), including narratives, analysis and recommended corrective actions, representing:
o Original Budget.
o Current Budget.
o Cost Variance.
o Estimate at Completion.
o Commitment.
o Earned Value Assessment.
o Cost Performance Index (CPI)
o Percentage of Packages Completion.
• Controlling and monitoring the delivery area total expenditure including verifying and checking of invoices and claims from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly recorded as well as generation of monthly cost report of the Stations showing actual expenditures, commitments, budget and forecast cost.
• Change management control process through Trend Program, which is an integrated program to handle all the changes in scope, schedule and budget, starting from initiation stage till resolving stage.
• Labors productivity monitoring/reporting, in addition to equipment Idle Hours Reports to enhance utilization of project equipment.
• Analyzing material purchase orders compared to budget as part of the review process of monthly report.
• Coordinating/liaise with other project departments such as procurement, accounting, engineering and construction to establish common understanding and utilization of reporting process.
• Issuing monthly Cost Report at all the budget levels (Tasks, Workpackages and Cost Elements), including narratives, analysis and recommended corrective actions, representing:
o Original Budget.
o Current Budget.
o Cost Variance.
o Estimate at Completion.
o Commitment.
o Earned Value Assessment.
o Cost Performance Index (CPI)
o Percentage of Packages Completion.
• Controlling and monitoring the delivery area total expenditure including verifying and checking of invoices and claims from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly recorded as well as generation of monthly cost report of the Stations showing actual expenditures, commitments, budget and forecast cost.
• Change management control process through Trend Program, which is an integrated program to handle all the changes in scope, schedule and budget, starting from initiation stage till resolving stage.
• Labors productivity monitoring/reporting, in addition to equipment Idle Hours Reports to enhance utilization of project equipment.
• Analyzing material purchase orders compared to budget as part of the review process of monthly report.
• Coordinating/liaise with other project departments such as procurement, accounting, engineering and construction to establish common understanding and utilization of reporting process.
February 2012
To July 2013
Cost Control Engineer
at CCC (Consolidated Contractors Company)
Location :
Egypt - Cairo
Company: CCC (Consolidated Contractors Company S.A.L.).
Employer: Egyptian Air Force
Project: Apache Procurement Program, kattamia Air Base.
Title: Cost Control Engineer.
Engineer: US Army Core of Engineers.
Duties:
• Generation of monthly cost report showing original budget, budget at forecast, budget allowance based on percentage completion of the work packages, cost variance and cost performance index (CPI) Using ProjMon (inhouse Sofware of CCC)
• Providing Productivity Report comparing actual direct work production rates against budget norms.
• Reviewing contractual documents and contract modifications to determine scope of work cost impacts and scope changes.
• Supporting project management team during the contract changes/claimes process providing cost impact analysis.
• Generation of budget at forecast of each work package according to change in method statement.
• Submitting a revision budget reflecting change notices and change in method statement.
• Providing trend analysis report of direct and in-direct work packages.
• Review all direct cost of labor, equipment, subcontracts invoices and material purchase orders.
• Preparing accruals and provisions to cover all unbilled work and committed costs.
Employer: Egyptian Air Force
Project: Apache Procurement Program, kattamia Air Base.
Title: Cost Control Engineer.
Engineer: US Army Core of Engineers.
Duties:
• Generation of monthly cost report showing original budget, budget at forecast, budget allowance based on percentage completion of the work packages, cost variance and cost performance index (CPI) Using ProjMon (inhouse Sofware of CCC)
• Providing Productivity Report comparing actual direct work production rates against budget norms.
• Reviewing contractual documents and contract modifications to determine scope of work cost impacts and scope changes.
• Supporting project management team during the contract changes/claimes process providing cost impact analysis.
• Generation of budget at forecast of each work package according to change in method statement.
• Submitting a revision budget reflecting change notices and change in method statement.
• Providing trend analysis report of direct and in-direct work packages.
• Review all direct cost of labor, equipment, subcontracts invoices and material purchase orders.
• Preparing accruals and provisions to cover all unbilled work and committed costs.
May 2011
To February 2012
Cost Control Engineer/Estimator
at Consolidated Contractors Company
Location :
Egypt - Cairo
Company: CCC (Consolidated Contractors Company S.A.L.).
Employer: Barwa Real Estate Company.
Project: Barwa New Cairo Project.
Title : Cost Control Engineer/Cost Estimator
Duties :
• Preparing estimates for managment reviews, starting from the BOQ level through Workgroup level, Operational Rates level and Resources, using EST (inhouse software of CCC).
• Monitoring project actual expenditures on a daily basis reviewing labors and equipment timesheets, material requisitions/POs and Subcontracts invoices in order to prepare Client main invoice documents.
• Providing trend analysis report of direct an in-direct work packages.
• Preparing invoice status on a monthly basis highlighting any major figures.
• Accumulates, evaluates, and documents hestorical cost data and construction procedures and methods in order to maintain current estimating standards and databases.
• Study project files and prepare the required analysis and breakdowns.
• Fulfill project control requirements regarding the department databases.
Employer: Barwa Real Estate Company.
Project: Barwa New Cairo Project.
Title : Cost Control Engineer/Cost Estimator
Duties :
• Preparing estimates for managment reviews, starting from the BOQ level through Workgroup level, Operational Rates level and Resources, using EST (inhouse software of CCC).
• Monitoring project actual expenditures on a daily basis reviewing labors and equipment timesheets, material requisitions/POs and Subcontracts invoices in order to prepare Client main invoice documents.
• Providing trend analysis report of direct an in-direct work packages.
• Preparing invoice status on a monthly basis highlighting any major figures.
• Accumulates, evaluates, and documents hestorical cost data and construction procedures and methods in order to maintain current estimating standards and databases.
• Study project files and prepare the required analysis and breakdowns.
• Fulfill project control requirements regarding the department databases.
October 2009
To April 2011
Structural Engineer
at ECA (Engineering Consulting Associate-Prof. Ahmed A. Elserwi)
Location :
Egypt - Cairo
Company: ECA (Engineering Consulting Associate-Prof. Ahmed A. Elserwi).
Title : Structural Engineer
Duties :
• Preparing design simulation models calculating the pressures, stresses and strains that each structural component will experience from other parts of the structure due to own weight, live loads and environmental pressures such as weather or earthquakes in order to generate design drawings.
• Considering the strength of various materials, e.g. timber, concrete, steel and brick, to see how their inclusion may necessiate a change of structural design.
• Liaising with other designers to agree on safe designs and their fit with the aesthetic concept of the construction.
• Examining structures at risk of collapse and advisinghow to improve their structural integrity, such as recommending removal or repair of defective parts or rebuilding the entire structure.
• Using computers and computer-aided design (CAD) technology for simulation purposes.
• Planning and monitoring shop drawing schedule.
• Development and standardization of shop fabrication drawing presentation.
• Preparing quantities surveying as excavation, filling steel reinforcement, concrete and formworks.
• Review and interpret design drawings and specifications, propose better engineering alternatives.
• Supervising construction works making sure meeting the specifications and design drawings.
Projects:
• Dar Alwatha’eq Almasrya.
• Edita Confictionery Industries Factory.
• Americana Complex.
• Porto Marina Golf Bay Towers.
• Several Residential and Commercial Building in Fifth Settlement Commercial District - Cairo- Egypt.
Title : Structural Engineer
Duties :
• Preparing design simulation models calculating the pressures, stresses and strains that each structural component will experience from other parts of the structure due to own weight, live loads and environmental pressures such as weather or earthquakes in order to generate design drawings.
• Considering the strength of various materials, e.g. timber, concrete, steel and brick, to see how their inclusion may necessiate a change of structural design.
• Liaising with other designers to agree on safe designs and their fit with the aesthetic concept of the construction.
• Examining structures at risk of collapse and advisinghow to improve their structural integrity, such as recommending removal or repair of defective parts or rebuilding the entire structure.
• Using computers and computer-aided design (CAD) technology for simulation purposes.
• Planning and monitoring shop drawing schedule.
• Development and standardization of shop fabrication drawing presentation.
• Preparing quantities surveying as excavation, filling steel reinforcement, concrete and formworks.
• Review and interpret design drawings and specifications, propose better engineering alternatives.
• Supervising construction works making sure meeting the specifications and design drawings.
Projects:
• Dar Alwatha’eq Almasrya.
• Edita Confictionery Industries Factory.
• Americana Complex.
• Porto Marina Golf Bay Towers.
• Several Residential and Commercial Building in Fifth Settlement Commercial District - Cairo- Egypt.