Total des années d'expérience: 32 Années, 8 Mois
janvier 2008
A À présent
Resident Engineer
à The Arab Contractors (Osman Ahmed Osman)
Lieu :
Egypte - Le Caire
- Follow-up Device of Water & Sewer Projects for Down Egypt Projects.
- Preparation of Egyptian Code in National Center for Research for Water Pump Stations.
- Lecturing at the Institute of Productive Training - Arab Contractors Company.
- Preparation of Egyptian Code in National Center for Research for Water Pump Stations.
- Lecturing at the Institute of Productive Training - Arab Contractors Company.
janvier 2005
A janvier 2008
Project Manager
à Arab Contractors Company (Osman Ahmed Osman)
Lieu :
Egypte - Le Caire
Abu Rawash - El-Lagoon Sludge Line, D.I. diameter 800mm
Abu Rawash Sewage Pump Station
Abu Rawash Sewage Pump Station
janvier 2004
A janvier 2005
Project Manager
à Arab Contractors Company (Osman Ahmed Osman)
Lieu :
Egypte - Le Caire
Main Water Pipeline, 6th of October City, diameters 900mm &1000mm G.R.P. pipes.
janvier 2003
A janvier 2004
Site Engineer
à Arab Contractors Company (Osman Ahmed Osman)
Lieu :
Egypte - Le Caire
Cairo Airport Project
Storm Water System, Long Park, and Water Tank
Storm Water System, Long Park, and Water Tank
janvier 2000
A janvier 2003
Site Engineer
à Arab Contractors Company (Osman Ahmed Osman)
Lieu :
Egypte - Le Caire
1) Gulf Suez Development Project:
a) Pressure pipeline ( Ductile pipes - Concrete pipes )
b) Water pressure pipeline, G.R.P various diameter.
c) Drainage Gravity Pipeline, G.R.P various diameter.
2) Pipeline Project, El-Katamia - Zahraa Nasr City pressure pipeline diameter 1000mm.
3) Contract 19 as follows :
Sludge Drain Construction, potable, service, water, grease network (Ductile Iron, pre-stressed & polyethylene pipes).
a) Pressure pipeline ( Ductile pipes - Concrete pipes )
b) Water pressure pipeline, G.R.P various diameter.
c) Drainage Gravity Pipeline, G.R.P various diameter.
2) Pipeline Project, El-Katamia - Zahraa Nasr City pressure pipeline diameter 1000mm.
3) Contract 19 as follows :
Sludge Drain Construction, potable, service, water, grease network (Ductile Iron, pre-stressed & polyethylene pipes).
janvier 1998
A janvier 2000
Site Engineer
à Arab Contractors Company (Osman Ahmed Osman)-Nigeria Branch
Lieu :
Nigeria
Construction of Otaco City, Nigeria, Drainage Network
a) P.V.C. Drainage Pipeline
b) Rain Water Drainage, concrete pipe in various diameter including Manholes.
a) P.V.C. Drainage Pipeline
b) Rain Water Drainage, concrete pipe in various diameter including Manholes.
janvier 1994
A janvier 1998
Site Engineer
à Arab Contractors Company (Osman Ahmed Osman)
Lieu :
Egypte - Le Caire
1. Construction of Darb El-Aghwat Drainage Network in various diameters, V.C. Pipes.
2. Construction of El-Mokattam Water Pipeline Network, D.I. Pipes, diameters 600mm & 1000 mm.
3. Construction of El-Maasara Drainage Network, D.I. Pipes, gravity & pressure lines.
2. Construction of El-Mokattam Water Pipeline Network, D.I. Pipes, diameters 600mm & 1000 mm.
3. Construction of El-Maasara Drainage Network, D.I. Pipes, gravity & pressure lines.
juillet 1991
A janvier 1994
Site Engineer
à Abu Zekry Company for Construction
Lieu :
Egypte - Le Caire
1. Construction of 7km-long Tanta - Mohalet Marhoum Road, El-Gharbia City.
2. Construction of 5km-long Abosenatya - El-Bagour Road, El-Menoufiya City.
3. Construction of 12km-long El-Arryesh - El-Shaykh Zaid pressure pipeline.
2. Construction of 5km-long Abosenatya - El-Bagour Road, El-Menoufiya City.
3. Construction of 12km-long El-Arryesh - El-Shaykh Zaid pressure pipeline.
Partager sur Facebook
Partager sur Twitter
Partager via Email